About

Geneva Constructions GCR Time line Case Summary Understanding Concepts: Total Quality Management Understanding Concepts: Six Sigma DMAIC Approach Six Sigma: Support Structure Case Questions Q1 , Q2 , Q3 Conclusion

About Geneva Construction and Risk


The Geneva Construction and Risk Insurance was founded in 1922 Provides insurance for building contractors and construction companies in Germanspeaking countries in Europe and in North America.

Go To Contents

Go To Contents

The GCR timeline.


The company had remained small and had specialized inhousing construction project

Till 1950
1950 1983

Began expansion into larger construction insurance in the industrial, oil, petrochemical and power plant construction areas

bought by the Wichita Mutual Group and had absorbed the groups existing construction insurance businesses. Established TQM

2000

Leader amongst insurance companies that specializes in providing insurance for construction projects, especially complex, high-risk projects, where contractual and other legal issues, physical exposure and design uncertainty need customized insurance responses

Case Summary
Wichita Mutual had instructed all companies in its group to adopt a total quality management(TQM) initiative. Issued a handbook with detailed instructions of how TQM was to be implemented throughout the grouptherefore, a rigid practice.

Case Summary

contd.

Although the TQM initiative had never been formally pronounced a failure, it had faded over the years without having the overall impact that once was hoped of it. Tyko Mattson-convinced that an improvement initiative based on Six Sigma principles will be more of a success.
Go To Contents

Total Quality Management (TQM)


TQM is an integrated philosophy of management for continuously improving the quality of product and process e.g. Kaizen Greater emphasis laid on the roles and responsibilities of every member of staff within an organization to influence quality- all staff are empowered and quality involves EVERYONE!!! Ultimate aim- to manufacture products with zero defects.

Total Quality Management


Doing things right..

.FIRST time.
Go To Contents

SIX SIGMA
Originally developed by MOTOROLA in 1986. Six Sigma is a statistical measure of quality, which reflects process capability. It set the goal of achieving capability levels of 3.4 defects per million opportunities Process-Centered approach that includes process design, performance measurement, continuous improvement.

Six Sigma and golf?

If you played 100 rounds of golf per year, and played at: 2 sigma - you'd miss 6 putts per round 3 sigma - you'd miss 1 putt per round 4 sigma - you'd miss 1 putt every 9 rounds 5 sigma - you'd miss 1 putt every 2.33 years 6 sigma - you'd miss 1 putt every 163 years!

The Six Sigma Approach DMAIC


Control by standardising solution and monitoring performance.
Define the problem or opportunity. Control Define

Improve by implementing potential solutions.

Improve

6 Measure

Analyse

Measure the current performance and capability

Analyse to identify root causes.


Go To Contents

Six Sigma Support Structure


Champions: Business leaders who lead the implementation of Six Sigma within the business; Sponsors/Process Owners: Business leaders responsible for the implementation of process improvements and monitoring process performance; Master Black Belts: Fully trained quality leaders responsible for Six Sigma strategy, training, mentoring, deployment and results; Black Belts: Fully trained Six Sigma experts who lead improvement teams, work on Six Sigma projects and mentor Green belts; Green Belts: Fully trained individuals who apply Six Sigma skills to improvement projects; Team Members: (Yellow Belts) Individuals who support projects in their areas.
Go To Contents

Question # 1 How does the Six Sigma approach seem to differ from the TQM approach adopted by the company almost twenty years ago?

The TQM Approach


A handbook approach where every thing is done in Copy Book Fashion Involves all people from all processes People as a part of quality circle Collaborative and cultural approach Focus on performance improvement A lot of time and effort involved in evaluation

The Six Sigma Approach


Flexible system for Achieving , Sustaining and maximizing standards Linked between understanding customer needs , analysis of facts, data and statistics and managing , improving and implementing processes Process Centered Approach- Evidence based decision making , emphasis on negative effects of process variation Normalization of processes using DPMO principle

A Comparison
A major advantage of Six Sigma: It engages senior management by establishing process ownership and linking process performance to strategic objectives In TQM approach a product meets set company standards, while in case of Six Sigmas quality to a larger extent, is determined by the customer. TQM doesnt require full time dedication in quality management processes, Six Sigma requires certified professionals.

The Verdict
Tyko sees Six Sigma as a collection of previously tried and tested quality management techniques including TQM Our Perspective: o We believe while TQM is process driven, Six Sigma is highly customer driven. o Six-Sigma is a statistical and quantitative measure of quality and involves setting statistical quality standards. TQM ,on the other hand, focuses on doing things right and involves everyone in every process.
Go To Contents

Question2: Do you think Tyko can avoid the Six Sigma initiative suffering the same fate as TQM?

Question 2 Contd.
Tyko believed three reasons contributed to failure of TQM: It faded away and was just extra work Not accepted by Middle Management Very few local offices adopted the TQM philosophy
However, the real problem was not with TQM. It was the IMPLEMENTATION which went all wrong.

Question 2 Contd.
Hence, YES, Tyko can avoid Six Sigma suffering the same fate as TQM. Firstly, company should not consider Six Sigma as a Quick Fix and panacea but as an approach that results in long-term systematic reduction of waste. Apply Six Sigma Pilot: - Use of external partner to tailor approach and provide training - Establishing where Sigmas performance is now - Apply it in failing processes

Go To Contents

Q3 Is six sigma a better approach for GCR?

Six Sigma compared to TQM

Benefits TQM involves upper management and Six Sigma involves all. Six Sigma well tested and tried than TQM. Reduce process variations. Away from monotonous.

Drawbacks High investment. Resource hungry. Not a quick fix solution. Over complication. Low volume, high variety, higher visibility. For mature and big companies.

Conclusion
Company should go for TQM and Six Sigma approach simultaneously Strategy of adopting a new approach is beneficial to the whole company Proper allocation of resources and time given to the approach will yield better result Success of a company lies on its right timing and implementation of a proper business and quality approach