You are on page 1of 11

Construction Sequence Section 1 1.

Setting out Site Layout as shown including Site Office, Guard House, Hoarding and etc. Setting up Bentonite Plant for the construction of Diaphragm Wall. Complete Ultimate Pile Load Test and GMP trial test as per specification. Proceed with Diaphragm Wall Construction,

Prefab PREFAB SITE OFFICE Site-Office

2.
I .C. I .C. I .C.

S E R A N G O O N

R O A D

Crawler Crane Bentonite Plant Existing MRT Exit/ Entrance


Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Legend: LEGEND: LEGEND:

GMP Trial Test

Boundary Line Hoarding Line Covered Walkway

Sequence at Month 4
CITY SQUARE MALL

BOUNDARY LINE

GATE GATE 1 1

TURFING

3.

BARE EARTH SURFACE TO BE COVERED WITH CANVASS SHEET IF THERE IS NO ON-GOING ACTIVITY

4.

S IL T WATE R HOLD ING T ANK FROM M ONTH -9 T O MONT H - 22 I L =101.668 S TORA GE T ANK FOR T RE AT ED WATER

300m m WIDE S IL T CUT-O F F DRAIN

I L =102.384

S ILT WAT ER T REAT MENT P LANT

S ILT TRAP 1m X 1m X 1m(D)

Hydraulic Grab

Construction Sequence Section 1


GMP Machine Excavator

1.

Diaphragm wall construction is completed and GMP works in progress. Proceed with Bore Piling Works follow by King Post Installation. Proceed with excavation along the diaphragm wall for capping beam casting.

Crawler Crane

Prefab PREFAB SITE OFFICE Site-Office

2.
Truck Excavator

I.C.

I.C.

I.C.

Legend: LEGEND: LEGEND:

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

Sequence at Month 7
CITY SQUARE MALL

BOUNDARY LINE

GATE GATE 1 1

TURFING

GMP Machine

3.

Existing MRT Entrance / Exit Excavator GMP Machine

Crawler Crane

Mixer Truck Truck

Truck Excavator

GMP Machine

Crawler Crane

S ILT WA TE TA N K FR R HOLD IN G OM MONT H -9 TO MON TH -22 IL=10 1.668 S TORA GE TAN K FOR TREA TED WA TER

3 00 mm WIDE S ILT C U T-OFF DRAIN

IL=10 2.384

S ILTW ATER TRE ATME NT P LANT

S ILT TRAP 1 m X 1m X

1 m(D)

Construction Sequence Section 1 1. Complete construction of capping beams on top of the diaphragm wall. Complete Bore Piling Works and king-post installation. Proceed with construction of Level 1 Slab.

Prefab PREFAB SITE OFFICE Site-Office

2.
I.C. I.C. I.C.

Legend: LEGEND: LEGEND:

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

Sequence at Month 10
CITY SQUARE MALL

BOUNDARY LINE

GATE 1

TURFING

Crawler Crane

3.

Pump Truck Mixer Truck

Mixer Truck

S ILT WA TE TA N K FR R HOLD IN G OM MONT H -9 TO MON TH -22 IL=10 1.668 S TORA GE TAN K FOR TREA TED WA TER

3 00 mm WIDE S ILT C U T-OFF DRAIN

IL=10 2.384

S ILTW ATER TRE ATME NT P LANT

S ILT TRAP 1 m X 1m X

1 m(D)

Construction Sequence Section 1 1. Complete construction of permanent RC slab [which serves as concrete strut to diaphragm wall and working platform during excavation and construction of Basements] at Level-1 with access openings.

Prefab PREFAB SITE OFFICE Site-Office

I .C.

I .C.

I .C.

Crawler Crane

BOUNDARY LINE
LEVEL 3

CITY

GATE GATE 1 1

TURFING

2.
3.

Proceed with the construction of Level-3 slab.


Proceed with the excavation to basement-1 and construction of RC slab with access openings in Basement 1 after Level-1 RC slab achieved adequate strength to carry construction live loads.

Crawler Crane

Truck

Mixer Truck

S IL T WATE R HOLD ING T ANK FROM M ONTH -9 T O MONT H - 22 I L =101.668 S TORA GE T T RE AT ED ANK FOR WATER

300m m WIDE S IL T CUT-O F F DRAIN

I L =102.384

S ILT WAT ER T REAT MENT P LANT

S ILT TRAP 1m X 1m X 1m(D)

Legend: LEGEND: LEGEND:

LEVEL 1

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

LEVEL B1

Sequence at Month 13
SQUARE MALL

Construction Sequence Section 1 1. 2.


Prefab PREFAB SITE OFFICE Site-Office
I.C. I.C. I.C.

Complete construction of RC slab at Basement 1. Proceed with the construction of RC slab at Basement 2.

BOUNDARY LINE

CITY

GATE GATE 1 1

TURFING

Crawler Crane

Truck Crawler Crane

S ILT WA TE R HOLD IN G TA N K FR OM MONT TO MON H -9 TH -22 IL=10 1.668 S TORA GE TREA TED TAN K FOR WA TER

3 00 mm WIDE S ILT C U T-OFF DRAIN

IL=10 2.384

S ILTW ATER TRE ATME NT P LANT

S ILT TRAP 1 m X 1m X

1 m(D)

Legend: LEGEND: LEGEND:

LEVEL 3

LEVEL 1

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

LEVEL B1

LEVEL B2 LEVEL B3 LEVEL B4

Sequence at Month 16
SQUARE MALL

Construction Sequence Section 1 1. 2.


Prefab PREFAB Site-Office SITE OFFICE
Tower Crane
I.C. I.C. I.C.

Erect two Tower Cranes on Level-1 Slab. Construction of level-4 slab in progress & proceed with the excavation and construction of RC slab at Basement 3 concurrently.

BOUNDARY LINE
LEVEL 4

CITY

GATE 1

TURFING
TUR FING
G SE EN T

Tower Crane

Crawler Tower

S ILT WA TE TA N K FR R HOLD IN G OM MONT H -9 TO MON TH -22 IL=10 1.668 S TORA GE TAN K FOR TREA TED WA TER

3 00 mm WIDE S ILT C U T-OFF DRAIN

IL=10 2.384

S ILTW ATER TRE ATME NT P LANT

S ILT TRAP 1 m X 1m X

1 m(D)

Legend: LEGEND: LEGEND:

LEVEL 3

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

LEVEL 1

LEVEL B1

LEVEL B2 LEVEL B3 LEVEL B4

Sequence at Month 18
SQUARE MALL

Construction Sequence Section 1 1. 2.


Prefab PREFAB SITE OFFICE Site-Office
Tower Crane Tower Crane

Construction of Podium structure until Lev-6 is in progress. Construction of Basement 4 slab in progress. Proceed with truss installation works in Podium.

3.

BOUNDARY LINE

CITY

GATE 1

Section 2 1.
Boring Rig

Complete demolition of existing MRT exit/ entrance. Proceed with the Bore Pile Installation

2.
Crawler Tower

LEVEL 7

LEVEL 6

LEVEL 5

LEVEL 4

Legend: LEGEND: LEGEND:

LEVEL 3

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

LEVEL 1

LEVEL B1

LEVEL B2 LEVEL B3 LEVEL B4

Sequence at Month 20
SQUARE MALL

Construction Sequence Section 1 1.


E XT 'G M ANHOLE

Complete Construct Basement Slabs until Basement-4 Proceed with the construction of Upper Tower Structure and Level-2 slab. Proceed with Basement Internal Finishing. Dismantle one no. Tower Crane

2.
Tower Crane

Prefab PREFAB SITE OFFICE Site-Office

I .C.

I .C.

I .C.

BOUNDARY LINE

CITY

GATE 1

3.
Excavator

4.

Section 2
Excavator Truck

1.

Proceed with the excavation after completion of bore piling works.

S IL T WATE R HOLD ING T ANK FROM M ONTH T O MONT -9 H - 22 I L =101 .668 S TORA GE T ANK FOR

300m m WIDE S IL T CUTOF F DRAIN

I L =102 .384

S ILT WAT ER T REAT MENT P LANT

ROOF

S ILT TRAP 1m X 1m X 1m(D)

LEVEL 9

LEVEL 8

LEVEL 7

LEVEL 6

LEVEL 5

LEVEL 4

LEVEL 3

Legend: LEGEND: LEGEND:

LEVEL 1

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

LEVEL B1

LEVEL B2 LEVEL B3 LEVEL B4

Sequence at Month 22
SQUARE MALL

Construction Sequence Section 1 1.


E XT 'G M ANHOLE

Complete Construct of the Tower Structure Complete Metal Roof Truss Curtain wall installation works in Podium in progress.

2. 3.

Prefab PREFAB Site-Office SITE OFFICE

I .C.

I .C.

I .C.

BOUNDARY LINE

CITY

GATE 1

Section 2 1. Proceed with the construction of sunken slab.

S IL T WATE R HOLD ING T ANK FROM M ONTH T O MONT -9 H - 22 I L =101.668 S TORA GE T T RE AT ED ANK FOR WATER

300m m WIDE S IL T CUT-O F F DRAIN

I L =102.384

S ILT WAT ER T REAT MENT P LANT

ROOF

S ILT TRAP 1m X 1m X 1m(D)

LEVEL 9

LEVEL 8

LEVEL 7

LEVEL 6

LEVEL 5

LEVEL 4

LEVEL 3

Legend: LEGEND: LEGEND:

LEVEL 2

LEVEL 1

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

LEVEL B1

LEVEL B2 LEVEL B3 LEVEL B4

Sequence at Month 24
SQUARE MALL

Construction Sequence Section 1 1.


E XT' G MANH OLE

Curtain wall works in podium is completed and Curtain Wall works in Tower is in progress. Dismantle Tower Crane. Proceed with the Internal Finishing for the Tower

Prefab PREFAB SITE OFFICE Site-Office

2.
I.C. I.C. I.C.

BOUNDARY LINE

CITY

GATE 1

3.

Section 2 1. Complete RC structure of the Sunken Plaza and proceed with the installation of Sail Roof Proceed with the Installation of Escalator and Finishing Works

2.

S ILT WA TE R HOLD IN G TA N K FR OM MONT TO MON H -9 TH -22 IL=10 1.668 S TORA GE TAN K FOR TREA TED WA TER

3 00 mm WIDE S ILT C U T-OFF DRAIN

IL=10 2.384

S ILTW ATER TRE ATME NT P LANT

S ILT TRAP 1 m X 1m X

ROOF
1 m(D)

LEVEL 9

LEVEL 8

LEVEL 7

LEVEL 6

LEVEL 5

LEVEL 4

Legend: LEGEND: LEGEND:

LEVEL 3

LEVEL 2

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

LEVEL 1

LEVEL B1

LEVEL B2 LEVEL B3 LEVEL B4

Sequence at Month 31
SQUARE MALL

Construction Sequence Section 1


H OA R D IN G A LONG TOL LAND

Flat Roof

1. 2.

Complete Internal Finishing for the New Retail Outlet Complete External Works surround the New Retail Outlet

Roof Garden at 7th floor Roof at 6th floor Roof at 6th floor

Section 2
Flat Roof

1.

Complete the External Works & Water Feature surround the Front Phase of the New Retail Outlet

Legend: LEGEND: LEGEND:

Boundary Line Boundary Line Hoarding Line Hoarding Line Building Outline Building Outline T.O.L. T.O.L. Slab Opening at B1Opening Slab Storey at B1 Storey

Boundary Line Hoarding Line Covered Walkway

Sequence at Month 34
CITY SQUARE MALL