You are on page 1of 97

Presentation on Advancements in ESP Control System

R&D Center

5/24/2012

Copyright 2006 BHEL, Ranipet

Evolution of ESP controllers in BHEL

ESP HVR CONTROL


ANALOG CONTROLLER AICE - C BAPCON

RAPPING CONTROL
AUTORAPPER SYNCHRONOUS PROGRAMMER mP BASED RAPPER CONTROLLER

RAPCON

ESP CONTROL
MANUAL CONTROL COMPUTER CONTROLLED PRECIPITATOR OPERATION IOS

5/24/2012

Copyright 2006 BHEL, Ranipet

High Voltage Rectifier Controllers

Basic factors affecting ESP performance

Properties of Flyash
- Particle size distribution -small particles are difficult to collect - surface area affects visibility, space charge

5/24/2012

Copyright 2006 BHEL, Ranipet

qs

EP

+
+ + + + +

Qs E p
+ + + +

F = Qs . Eav Ep . Eav Vp . Vav

x i

BACK CORONA

5/24/2012

Copyright 2006 BHEL, Ranipet

5/24/2012

Copyright 2006 BHEL, Ranipet

Modified Intermittent Charging

Increases the base voltage More suited for high charge ratio operation suitable for high resistivity dust
Outlet emission (mg/Nm^3) 351 127 Power consumption (kW) 300 57

Conventional charging Intermittent charging

5/24/2012

Copyright 2006 BHEL, Ranipet

Energy Saving
Reduction in energy costs due to modified intermittent charging

210 MW ESP
Reduction in power : 243 kW At 2 Rs./kWH and 65% duty, yearly saving : Rs. 27.7 Lakhs

5/24/2012

Copyright 2006 BHEL, Ranipet

10

BAPCON

BHELs Advanced Precipitator CONtroller (BAPCON) Highly reliable Displays in % Local & Remote operation CR mode Warning & TRIP Alarms

5/24/2012

Copyright 2006 BHEL, Ranipet

11

Schematics of BAPCON

Feedback control system IP65 packing

5/24/2012

Copyright 2006 BHEL, Ranipet

12

BAPCON

Intermittent charging, requirement of wide charge

ratio (CR) range of 1:159.

Optimiser logic for C.R, avoids tedious manual tunning. Base charging, increases base voltage. Peak & valley KV measurement : Diagnostic & tunning facilitated.

5/24/2012

Copyright 2006 BHEL, Ranipet

13

VARIOUS DISPLAYS IN BAPCON


E H O 1 2 3 4 5 6 7 8 9 Precipitator current Precipitator voltage Sparks per minute Im limit Is limit S control Time control Stabilization time U.V. Limit C.R. Pulse current limit Repeat time Address Peak & valley voltage P Base charge L Base charge current
5/24/2012 Copyright 2006 BHEL, Ranipet 14

ALARMS IN BAPCON
o TRIP ALARMS: o E1 - Safety chain broken. o E2 - Eprom faulty. o E3 - Power supply failure. o E4 - Over voltage o E5 - Ash level very high (for 10 min.) o E6 - T/R temp very high / TH. Ovld. o E7 - Bucholtz bottom float.
o

WARNING ALARMS:
o

T/R temp high.

o
o o
5/24/2012

Bucholtz top float.


Ash level high. Under voltage.
Copyright 2006 BHEL, Ranipet 15

SPARK DETECTOR
CURRET SIGNAL FROMTR VOLTAGE SIGNAL FROMTR

PROGRAM (EPROM) 2732 / 2764

SERIAL COM.(8251) KEYBOARD PORT 1 I/O 8155

SIGNAL CONDNG AMP. SIGNAL CONDNG AMP. PEAK & VALLEY DETCTR.

ALARMS FIRING SGNL.O/P ADDRESS SET

ANALOG TO DIGITAL CONVTR. ADC 0816)

PROCESSOR 8085

OUTPUT RELAYS

PORT 2 I/O 8155

SPARK COUNTER INDICATING LEDs

SET POINT POT. METERS.

SYNCH. SIGNAL

WATCH DOG

DISPLAY

BAPCON - DETAILED BLOCK DIAGRAM


5/24/2012 Copyright 2006 BHEL, Ranipet 16

BAPCONplus

Engineering Unit display Designed for 660MW application VFD display Local & Remote operation CR mode Base Charge mode Warning & TRIP Alarms

5/24/2012

Copyright 2006 BHEL, Ranipet

17

BAPCON-II

Single board design Fewer components, Higher reliability RS-485 bus based highspeed network Remote operation Concealed in HVR panel In-built rapping

5/24/2012

Copyright 2006 BHEL, Ranipet

18

BAPCONsigma

Primary parameters measurement Power Measurement Open Standard MultiMaster Network Peer to Peer communication Spark & Arc detection and suppression Single card design Concealed in HVR panel In-built rapping
19

5/24/2012

Copyright 2006 BHEL, Ranipet

Rapping System

RAPCON

Highly Reliable platform Standalone operation Local & Remote mode operation Real Time Clock based motor operation Advanced algorithms support Standby mode

5/24/2012

Copyright 2006 BHEL, Ranipet

21

ADVANCED FEATURES OF RAPCON


5/24/2012

Error checking for the motors. Setting of rapper timings. Setting of real time. Auto on/off selection. Manual on/off selection. Password protection. Setting of program set no. Reading of rapper times. Reading of real time. Reading of program set no. Reading of rapcon address. Reset alarm. Stan by mode selection. Communication with IOS-PC Rapping factor selection - [IOS]

Copyright 2006 BHEL, Ranipet

22

PARAMETERS IN RAPCON CONTROLLED BY IOS - P.C.

Rapping factor.

Program set no. Auto on/off. Manual on/off. Set real time. Set rapping time. Get rapping time. Reset alarm.

5/24/2012

Copyright 2006 BHEL, Ranipet

23

COMMAND TO RAPCON Force stand alone / standby Auto ON / OFF for all motors Manual ON / OFF for all motors Program set selection 1 - 64 Time factor 0 - 25.5 Alarm reset REPLY FROM RAPCON Remote local Auto ON / OFF status Manual ON / OFF status Program set Time factor Alarm status Motor status Motor status 30 sec. In advance Next on status
5/24/2012 Copyright 2006 BHEL, Ranipet 24

CPU CARD ( 8085 )

DISPLAY & K.B. CARD

ISOLATOR DATA COMMN. CARD REPLY CARD P.S.CARD

INPUT BUFFER CARD

BLOCK DIAGRAM OF RAPCON HARDWARE


5/24/2012 Copyright 2006 BHEL, Ranipet 25

BLOCK DIAGRAM OF CPU CARD OF RAPCON


6.144 MHz
TIMER 0 TIMER 1

TIMER2

8254 TIMER

8085
IR 0 IR 1

EPROM 27128

EPROM 27128

RAM 6264

MICRO 8259 PIC PROCESSOR FEEDBACK FROM 8255 PPI MOTOR CONTACTS

IR 7

TX RX

8251 USART

4321
WATCH
TX RX

8251 USART 5/24/2012

DOG

8255 PPI DIP SWITCH 26

CIRCUIT Copyright 2006 BHEL, Ranipet TO MOTOR CONTACTS

BLOCK DIAGRAM OF DISPLAY AND KEYBOARD CARD OF COMCON/RAPCON

74145
DATA

74138 8279
IRO

SWITCH

LED MATRIX 9*8

CONNECTOR FOR KEYBOARD ULN 2003

5/24/2012

Copyright 2006 BHEL, Ranipet

27

1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

RELAY -CARD

+
RL1 RL2 RL3 RL4 RL5

RL6
RL7 RL8 RL9 RL10 RL11 RL12 RL13 RL14 RL15 RL16

5/24/2012

RAPPER RELAY CARD - MOTOR ON COMMAND

Copyright 2006 BHEL, Ranipet

28

RAPCON - 1

DISPLAY CARD

CPU CARD

POWER SUPPLY CARD

24V AC DATA COMMUNICATION CARD SUM TB2 ALARM P TB 1 N 24V DC - - - + + + GND

TXR

5 6 7 8

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

COMM.LOOP COMM.LOOP TO ANN.CKT 4A 6A LP7

} TO INPUT CARD
TO RELA CARD

5/24/2012

K29 24VAC

Copyright 2006 BHEL, Ranipet

29

RAPCON FUNCTION SELECTION


1999.05.19 SET FUNCTION 10:23:45

NEXT FUNCTION NO =

1. PASSWORD? To reach a function with function 1 to 6 the RAPCON must be in LOCAL mode 2. SET RAPPER TIMES? 3. SET REAL TIME? 4. SET AUTO ON/OFF? Access to functions 2 to 6 possible only if pass word is answered correctly. 5. SET MANUAL ON/OFF? 6. SET PROGRAM SETNO? 7. DISPLAY TIMES? Acess to functions 7 to 11 does not require answering the pass word.

8. DISPLAY REAL TIME?


9. PROGRAMSET NO? 10. RAPCON ADDRESS?

5/24/2012

11. RESET ALARM? Copyright 2006 BHEL, Ranipet

30

To reach next function number either press the required number meant for the function and press enter yes (OR) press set function repeatedly till the required function is displayed.
NEXT FUNCTION NO =

NEXT FUNCTION NO = 7

ENTER YES

7 DISPLAY TIMES ?

5/24/2012

Copyright 2006 BHEL, Ranipet

31

DATA COMMUNICATION CARD FUNCTIONS:

Provides communication path between COMCON RAPCON & BAPCON

Provides Rs-232-C serial communication between P.C. & COMCON.


Provides hardware communication by-pass in case of power failure/unit faulty.

Extends sum - alarm signal for external annunciation. Provides 24V A.C. power supply to COMCON / RAPCON.

Provides isolated 24V DC power supply to relay card & digital buffer
card.

LED indication in case ofCopyright 2006 BHEL, Ranipet fuse failure. 24V DC power supply 5/24/2012

32

RAPCON-24

Supports up to 12 fields Hot-Standby feature Real Time Clock (RTC) User set parameters Stored in NVRAM Labeling of outputs Isolated Inputs and Outputs

5/24/2012

Copyright 2006 BHEL, Ranipet

33

RAPCON-II

RS-485 based network Only Remote operation Concealed inside the panel RTC and NVRAM Lesser components

5/24/2012

Copyright 2006 BHEL, Ranipet

34

Remote Terminal Unit

RTU

Light weight Hand held unit Graphical Display 64x128 pixel LCD Membrane keypad RS-485 network User interface unit for BAPCON-II, RAPCON-II

5/24/2012

Copyright 2006 BHEL, Ranipet

36

RTUsigma

Graphical User Interface 240x128 pixel LCD Tactile membrane keypad Open standard Multi master protocol communication Parameter trending Alarm logging Flash based programming

5/24/2012

Copyright 2006 BHEL, Ranipet

37

Integrated Operating System

NEED FOR COMPUTER CONTROL OF ESPs

Tedious manual tuning of parameters in each control. Status monitoring of large number of fields. Optimisation of ESP parameters. The need of supervision & control of ESP from UCB. Data logging, alarm logging & Graphical representation of precipitator parameters. Communication with plant computer.

5/24/2012

Copyright 2006 BHEL, Ranipet

39

IOS CONSISTS OF ..

BAPCON
RAPCON

BHELs advanced precipitator controller.


Rapper controller.

IOS - PC

Multitasking real time PC.

5/24/2012

Copyright 2006 BHEL, Ranipet

40

FUNCTIONS OF IOS - PC
Controls & monitors BAPCONs & RAPCONs. Closed loop control of ESP through. Opacity algorithm. Rapping set no. Algorithm. Rapping power off algorithm. Rapping time factor algorithm. Optimiser algorithm. Centralised monitoring & control from UCB. Alarm monitoring & print out of status.

5/24/2012

Copyright 2006 BHEL, Ranipet

41

ADVANTAGES OF IOS

Wide C.R suitable for Indian conditions. Automatic optimisation of C.R. base charging. Peak & valley KV measurement. Pre-programmed rapping sequences. Reduces emission & energy consumption. Pays back investment in couple of years. Software on ROM cards. Indigenous Hardware & Software. Upgradable. Maintenance support. Customising to needs.

5/24/2012

Copyright 2006 BHEL, Ranipet

42

IOS SOFTWARE MENUS

BAPCON MENU. RAPCON MENU. PRINTER MENU. SETUP MENU. Opacity basedata. BAPCON basedata. Rapcon basedata. Communication interval time. Algorithm basedata. Password setting. Opacity basedata. Opacity/dust correlation. Precipitator basedata. ALGORITHM. Opacity algorithm. Optimiser algorithm. Rapping factor algorithm. Rapping power algorithm.
5/24/2012 Copyright 2006 BHEL, Ranipet 43

ALGORITHMS IN IOS

Opacity algorithm Rapping power off algorithm Rapping set no. Algorithm Optimizer algorithm Rapping power factor algorithm Auto selection of opacity monitor based on ID fan status.

5/24/2012

Copyright 2006 BHEL, Ranipet

44

RAPPING FACTOR ALGORITHM

1.0 100 75 50 4.0

25 25.5

25% Boiler load min.set 5/24/2012

750% Boiler load max set

100%

Boiler load

Copyright 2006 BHEL, Ranipet

45

OPTIMIZER ALGORITHM
C.R OPTIMISATION S/W

TAKE VI CURVE & TEST FOR VALLEY KV DROPPING FOR OPERATING CHARGE RATIO

YES
DROOPING ?

NO

INCREASE C.R. & SWITCH OFF OPTIMUM REACHED LED.

DECREASE C.R & TEST FOR DROOPING

RET
INCREASE C.R & SWITCH ON OPTIMUM REACHED LED.

YES
DROOPING ?

NO
SWITCH OFF OPTIMUM REACHED LED.

RET

5/24/2012

Copyright 2006 BHEL, Ranipet

RET

46

NT-IOS

Windows based IOS Integrated Datalogging Track Ball & Mouse operation Industrial Computing platform Industrial grade desktop mounting

5/24/2012

Copyright 2006 BHEL, Ranipet

47

NT-IOS
Integrated Operating System on Windows NT platform

Bharat Heavy Electricals Limited, Ranipet

Main features

Graphical User Interface Trend curves display Compatibility with latest printers User friendly help features Information access through Intranet can be upgradable easily

5/24/2012

Copyright 2006 BHEL, Ranipet

49

GUI

User friendly windows screens for giving command to different controllers and displaying the ESP field status.

5/24/2012

Copyright 2006 BHEL, Ranipet

50

Trend curves display

VI curve for each field Line Graphs for Current , Voltage, Spark rate, Opacity and boiler load Bar chart for Analog input of Opacity and boiler load

5/24/2012

Copyright 2006 BHEL, Ranipet

51

Compatibility for Printers

All printers supported by Windows NT can be used for Text log , Graph log and VI curves

5/24/2012

Copyright 2006 BHEL, Ranipet

52

User friendly help features


Help feature covers the Technical and operating details of this package with Images. Context sensitive help for each screen is available.

5/24/2012

Copyright 2006 BHEL, Ranipet

53

Information access through Intranet

ESP field operating parameters like TR ON/OFF , current , voltage, Rapper On/OFF etc. are made available to all intranet users through a JSP software.

5/24/2012

Copyright 2006 BHEL, Ranipet

54

Future upgrade
New customer requirements can be added easily Can be upgraded easily for latest / future versions of Microsoft Windows Operating Systems. ( Eg. Windows 2000 and latest)

5/24/2012

Copyright 2006 BHEL, Ranipet

55

Software Architecture

VB application program Forms & Modules Controls ActiveX controls Device Drivers Windows NT O.S
5/24/2012 Copyright 2006 BHEL, Ranipet 56

Software details

Developed in VB 35 Forms for user input and output 8 modules for start-up & algorithms Active X controls MSCOM for communication Graphics Server for Graphs Dedicated Help Package is used Device driver for Reading Digital & Analog channels
Copyright 2006 BHEL, Ranipet 57

5/24/2012

Salient Features

Pass word protection at two levels Communication channel health monitoring & indication at relevant forms Operators input validation Warning messages Web server to publish WEB page developed in JSP Successfully tested at Mettur TPS & Ramagundam STPS
Copyright 2006 BHEL, Ranipet 58

5/24/2012

NT-IOS HARDWARE ARCHITECTURE

BAPCON1

BAPCON2

BAPCON-n

NT-IOS PC

Boiler load Opacity

RAPCON-n
5/24/2012

RAPCON2

RAPCON-1
59

Copyright 2006 BHEL, Ranipet

Hardware Configuration of NT-IOS


NTIOS
PC
PRINTER
DATALOGGER PC

Boiler load Opacity monitor & calib.input


BAPCO N1

ALI SUPPORT INS HEATER SHAFT INS HEATER 1 ESP BUS SECTION 1 FIELD-2 2 FIELD-1 LOW ESP

HOPPER HEATER ESP 1 2 ALIVE

ESP BUS SECTION 2

FIELD-3 REBO OT FIELD-4

FIELD-5

FIELD-6

FIELD-7

FIELD-8

STATCON-E2
BHEL
ALI SUPPORT INS HEATER SHAFT INS HEATER 1 2 FIELD-1 1 2 LOW ESP HOPPER HEATER ESP ALIVE

BAPCO N2

ESP BUS SECTION 1

FIELD-2

ESP BUS SECTION 2

FIELD-3 REBO OT FIELD-4

FIELD-5

FIELD-6

FIELD-7

FIELD-8

STATCON-E1
BHEL

BAPCO N3

RAPCO N4

BAPCON 24

RAPCO N1

5/24/2012

Copyright 2006 BHEL, Ranipet

60

Hardware Configuration of NT-IOS


Fat
Client

IOS-2
NTIOS
DATALOGGER PC

IOS-1

PC

PRINTER

Boiler load Opacity monitor & calib.input

Thin Client

BAPCO N1

ALI SUPPORT INS HEATER SHAFT INS HEATER 1 ESP BUS SECTI ON 1 FIELD-2 2 FIELD-1 LOW ESP

HOPPER HEATER ESP 1 2 ALIVE

ESP BUS SECTI ON 2

FIELD-3 REBO OT FIELD-4

FIELD-5

FIELD-6

FIELD-7

FIELD-8

STATCON-E2
BHEL
ALI SUPPORT INS HEATER SHAFT INS HEATER 1 ESP 2 FIELD-1 1 2 LOW ESP HOPPER HEATER ESP ALIVE

BAPCO N2

BUS SECTI ON 1 FIELD-2

ESP BUS SECTI ON 2

FIELD-3 REBO OT FIELD-4

FIELD-5

FIELD-6

FIELD-7

FIELD-8

STATCON-E1
BHEL

Any Pc withL an

BAPCO N3

RAPCO N4

BAPCO N24

RAPCO N1

5/24/2012

Copyright 2006 BHEL, Ranipet

61

Opening Screen

5/24/2012

Copyright 2006 BHEL, Ranipet

62

BAPCON Display

5/24/2012

Copyright 2006 BHEL, Ranipet

63

RAPCON Display

5/24/2012

Copyright 2006 BHEL, Ranipet

64

ANALOG Display - BAPCON

5/24/2012

Copyright 2006 BHEL, Ranipet

65

Command Screen

5/24/2012

Copyright 2006 BHEL, Ranipet

66

BAPCON Command

5/24/2012

Copyright 2006 BHEL, Ranipet

67

5/24/2012

Copyright 2006 BHEL, Ranipet

68

RAPCON Command

5/24/2012

Copyright 2006 BHEL, Ranipet

69

5/24/2012

Copyright 2006 BHEL, Ranipet

70

5/24/2012

Copyright 2006 BHEL, Ranipet

71

5/24/2012

Copyright 2006 BHEL, Ranipet

72

SETUP - Selection

5/24/2012

Copyright 2006 BHEL, Ranipet

73

SETUP-BAPCON Base Data

5/24/2012

Copyright 2006 BHEL, Ranipet

74

ALGORITHM SELECTION

5/24/2012

Copyright 2006 BHEL, Ranipet

75

Graph Log - Selection

5/24/2012

Copyright 2006 BHEL, Ranipet

76

Graph Log

5/24/2012

Copyright 2006 BHEL, Ranipet

77

SELECT BAPCON for VI Curve

5/24/2012

Copyright 2006 BHEL, Ranipet

78

VI Curve - BAPCON1

5/24/2012

Copyright 2006 BHEL, Ranipet

79

HELP

5/24/2012

Copyright 2006 BHEL, Ranipet

80

5/24/2012

Copyright 2006 BHEL, Ranipet

81

5/24/2012

Copyright 2006 BHEL, Ranipet

82

5/24/2012

Copyright 2006 BHEL, Ranipet

83

5/24/2012

Copyright 2006 BHEL, Ranipet

84

5/24/2012

Copyright 2006 BHEL, Ranipet

85

DDCMIS

RAPCON MASTER

RAPCON SLAVE

5/24/2012

Copyright 2006 BHEL, Ranipet

86

Hardware Configuration of IOS with Network


Pc - 1

IOS-2 IOS-1
NERWORK RJ45
RS 232 / CURRENT LOOP CONVERTER

Optional NT- IOS PC SERVER


COM 1 COM 2 PRINTER
DATALOGGER PC

RS 232

L A N
Pc - 2

CURRENT LOOP BAPCON 1

Boiler load Opacity monitor & calib.input

BAPCON 2

Pc - in
LAN

BAPCON 3

RAPCON 4

BAPCON2 4

RAPCON 1

5/24/2012

Copyright 2006 BHEL, Ranipet

87

5/24/2012

Copyright 2006 BHEL, Ranipet

88

Common IOS

CENTRALISED CONTROL & DISPLAY FOR MULTIPLE IOSs


CIOS PC

RS-232C TO RS-485 CONVERTOR

IOS #6

IOS #7

IOS #8

IOS #9

IOS #10

IOS #11

5/24/2012

Copyright 2006 BHEL, Ranipet

90

COMMON TERMINAL FOR MULTIPLE IOS

CENTRALISED CONTROL SYSTEM CONTROL & DISPLAY FOR INDIVIDUAL SUB-CONTROLLERS THROUGH IOS INTERFACE : RS-232C TO RS-485 PROTOCOL : MODBUS ( ASCII ) WINDOWS BASED APPLICATION SOFTWARE

5/24/2012

Copyright 2006 BHEL, Ranipet

91

BAPCON COMMAND SCREEN

5/24/2012

Copyright 2006 BHEL, Ranipet

92

RAPCON COMMAND SCREEN

5/24/2012

Copyright 2006 BHEL, Ranipet

93

RAPCON STATUS DISPLAY

5/24/2012

Copyright 2006 BHEL, Ranipet

94

CURRENT LOOP vs MULTIDROP DATAHIGHWAY

By pass relay is required in case controller is removed / fails Network has to be physically re configured if there is a breakage in main communication line. Low protocol overhead, more efficient at low speeds itself. communication frames of varying sizes allowed.

Termination resistance & by pass relay is required in case controller is removed / fails. Network has to be physically re configured if there is a breakage in main communication line. Protocol overhead is high, therefore higher speed is must. Communication frame size standardized. Large message will have to be split.

5/24/2012

Copyright 2006 BHEL, Ranipet

95

Other Developments

Wireless access between controllers Wireless access between sensors & controllers SCADA based IOS

5/24/2012

Copyright 2006 BHEL, Ranipet

96

Thank You

5/24/2012

Copyright 2006 BHEL, Ranipet

97

You might also like