Professional Documents
Culture Documents
No.
1. 2.
Parameter
Selling Price (Rs per metre) Variable costs: a) Wages paid to weavers (Rs per metre) b) Yarn cost (Rs per metre)
60 x 40 lungis
Rs 10.90 Rs 4.50 Rs 5.50 Rs 0.90 5 m. 60 gms 40 gms
40 x 40 shirting
Rs 6.60 Rs 1.50 Rs 4.50 Rs 0.60 12 m. 100 gms -
3. 4. 5.
Contribution (Rs per metre) Production rate: No. of metre per loom day Yarn consumption: (in gms per metre) a) 40s yarn b) 60s yarn
3/23/2012
Proble 1 Formulation Lungis in Shirting in meters meters Objective Constraint Lungis Constraint Shirting Constraint avaiability Constraint avaiability Constraint capacity
Max salable
Max salable 40s yarn
60s yarn
production
As per constraint solution Lungis in meters =6711.052 Shirting in meters =19973.37 Profit= 18023.97 As per previous production Lungis in meters =11000 Shirting in meters =9600 Profit= 15660 So Difference in profit = 2363.97
3/23/2012
3/23/2012
Proble 2 Formulation Lungis in Shirting in meters meters Objective .9 0.3917 0 <= 11000 meters
Constraint Max salable Lungis 1 Constraint Max salable Shirting 0 Constraint 40s yarn avaiability .06 Constraint 60s yarn avaiability .04 Constraint production capacity .2 Constraint of minimum wage rate .4 Constraint Minimum Wage Constarint 4.5
1
.1 0 .083 -.2083 1.5
<=
<= <= <= >= >=
22000 meters
2400 kg 480 kg 3000 loom days 0 61500
3/23/2012
As per wage condition solution Lungis in meters =8347.582 Shirting in meters =16029.92 Profit= 13791.74 As per previous production Lungis in meters =6711.052 Shirting in meters =19973.37 Profit= 18023.97 So decrease in profit = -4160 Rs Our production decision doesn't change
3/23/2012
3/23/2012
Proble 3 Formulation Lungis in Shirting in meters meters Objective Constraint Max salable Lungis Constraint Max salable Shirting Constraint 40s yarn avaiability Constraint 60s yarn avaiability Constraint production capacity Constraint of Cash Availability 0.9 1 0 0.06 0.04 0.2 10 0.3917 0 1 0.1 0 0.0833 6 <= <= <= <= <= <=
Paath Section1 Group2
11000 meters 22000 meters 2400 kg 480 kg 3000 loom days 150000
3/23/2012 9
As per constraint solution Lungis in meters =1800 Shirting in meters =22000 Profit= 14820 So we are going to produce more of Shirtings
3/23/2012
10
3/23/2012
11