INDUSTRIAL TRAINNING
PRESENTATION
15 NOVEMBER
2006

Prepared by

Mohd Baqa’bi’llahi Bin Mohd


Yussuf
Student ID 56121204018
MMHE IPT 46764
Table of content

Chapter 1 MMHE Previews

 Hull Division Group


 Marine Repair Department

Chapter 2 Project’s Involved

 MT YU TSOA II (OIL TANKER)

 MT QUASAR (OIL TANKER)

 MV FAJAR SAMUDERA (CRUISE VESSEL)


Chapter 3 Current Project

 SPAR TRUSS KIKEH OFFSHORE (MDFT)


MDFT
 FPSO
 TOPSIDE


MDFT = MALAYSIAN DEEP WATER FLOATING TERMINAL
 FPSO = FLOATING PRODUCTIONS STRORAGE
OFFLOADING & OFFSHORE

TOPSIDE = OFFSHORE PLATFORM
Vessel Repair Index
Procedure’s

 Vessel General Arrangement


 Jobs Status Check List (Repair
Specifications)
 Material Certificate (Mill Certificate)
 Work Schedule
 Hull Yard Specification
 Report of Inspection & Survey activities
 Inspection and Testing record
 Request for Surveyor
 Hot Work Certificate
 Lifeboat Test record
Chapter 1 MMHE
Preview’s

 Marine Repair
Department

 Hull Division Group


Chapter 1 MMHE Previews MMHE LAYOUT
Facilities Provided
WORKSHOP

Marine Repair Department


Workshop
DRY DOCK
NO1

Dry Dock NO1 450,000 DWT

Level Luffing Crane 80 Tons


QUAY 7
(LANDBERTH)

Ship Lift 70,000 DWT

Ship Lift Platform is dropping down


QUAY 7

Cradle
Arrangement
STEEL LEG CRANE

Steel Leg Crane and Tug Boat

Steel Leg Crane Lifting


Helideck
DRILL BARGE
VESSEL

Drill Barge

Drill Barge on operation


Chapter 2 Project’s
Involved
Chapter 2 Project’s Involved

 MT YU TSOA II (OIL
TANKER)

 Operations Involved

 CCS Detail Inspection of Hull structure


(WBT)

 Air Pressure Testing (WBT)

 Derrick Crane Load Testing


Operations Involved China
Classification
 CCS Detail Inspection of Hull structure of Shipping
(WBT) (CCS)

Operation explanations

 Intend the China Classification of


Shipping.
 Intend the MMHE QC Personnel.

 Inspection activities covered visual


checking and testing.
 Process inspections at all of hull
structural
joint to identify the corrosion factors.
 Marking at corrode location.
 Process renewal and installation new
hull
structural.
China
Classification
of Shipping
(CCS)
WBT AFT PEAK TANK

Detail Inspection at transverse


bulkhead

Defaults by corrosion (marked)


Operations Involved China
Classification
 Air Pressure Testing of Shipping
(WBT) (CCS)

Operation explanations

 Intend the China Classification of


Shipping.
 Intend the MMHE QC Personnel.

 All of access holes WBT tank its tightly


closed to prevent from air leakage.
 Pump air into tank while in process to
identify the leaking locations.
 Intend MMHE QC in WBT tank to search
the leakage locations by getting
information
from manometer air pressure drop.
 Leaking area will be remarks for repair
purpose.
China
Classification
of Shipping
(CCS)
WBT AFT PEAK TANK

Manometer for
checking
air pressure dropping

Air leakage below of the WBT


tank
Operations Involved China
Classification
 Derrick Crane Load of Shipping
Testing (CCS)
Operation explanations

 Intend the China Classification of Shipping.


 Intend the MMHE QC Personnel.

 Intend the specialist group of crane (MMHE


Staff) to arranged the process.
 Ensure the crane equipment in good
condition.
 Prepared the load test to be tested are
according capacity weight of crane can
lifting up.
 Crane will lifting up and down also turn
around.
 Crane will hold lifting load in 15 minutes to
perform the crane strengthens.
China
Classification
of Shipping
(CCS)
MAIN DECK

Derrick crane lifting


weight

Derrick crane load weight 4


tons
Chapter 2 Project’s Involved

 MT QUASAR (OIL TANKER)

 Operations Involved

 Life boat testing

 Davit Load Testing Analysis

 Vacuum Test (main deck)

 NO 6 WBT ESTIMATION STEEL RENEWAL


Operations Involved

 Life Boat Testing

Davit Load Testing Analysis


(Video provided on requested)

Operation explanations

 Intend the ClassNK Surveyor.


 Intend the MMHE QC Personnel.

 Process to ensure the Lifeboat crane


can
working during lifting down the Load
Test
Panel.
 Ensure all of lifeboat equipment in
good
condition.
 Fixed the Load Test Panel at lifeboat
crane
LIFEBOAT PORT SIDED

MT QUASAR Lifeboat (P)

Lifeboat Crane lifting Load


Panel for Testing
PORT SIDED

Davit Load Test


Analysis

Load Panel lifting down


Operations Involved

 Vacuum Test (main


deck)
Operation explanations

 Intend the ClassNK Surveyor.


 Intend the MMHE QC Personnel.

 Vacuum test are done at main deck and


using
vacuum test machine.
 Using hose to supply the air into vacuum
pump (10psi).
 Brush the welding seam by soap
solutions and
press the handle to vacuum the place to
test.
 If got leakage the welding seam will
shown
MAIN DECK

Vacuum Test
Machine

Vacuum Test brush with soap


solution.
MAIN DECK

Leakage when bubble its


throughout

Vacuum Test Perfects without


leakage
Operations Involved

 COT INSPECTION PROCESS

Operation explanations

 Intend the ClassNK Surveyor.


 Intend the MMHE QC Personnel.

 Inspection activities covered visual


checking and testing.
 Process inspections of hull structures,
centerlines frame (bracket toe),
bottom
longitudinal, stringers and deck
frame.
 Marking at place to be repair and
renewal
the new plate.
CRUIDE OIL TANK (COT)
CENTER TANK

NO.3 COT Access Holes (center


tank)

Ladder access to bottom tank


CRUIDE OIL TANK (COT)
CENTER TANK

COT Tank Structure

COT Tank Hull structural Detail


Inspection
CRUIDE OIL TANK (COT)
CENTER TANK

Centerline Detail Inspection

Frame Bracket Detail Inspection


CRUIDE OIL TANK (COT)
CENTER TANK

Centerlines Bracket Toe Inspection

Bracket Toe Inspection


Tank
cleaning
machine

CRUIDE OIL TANK (COT)


CENTER TANK

Deck frame inspection

Tank cleaning machine equipment


Operations Involved

 NO 6 WBT ESTIMATION STEEL


RENEWAL
Operation explanations

 Intend the MMHE QC Personnel.

 Estimation process involved all of hull


structural renewal new plate.
 Every each of hull structural
installation
should be recorded and estimate for
claim
to the owner of the vessel.
 Detail table estimated are show
every each
of locations install the new plate
structure.
NO 6 WBT STARBOARD

NO 6 WBT (S) access holes

Tank situation with sorting staging


INSTALLATION IN PROGRESS

Bulkhead plate renewal

Bulkhead plate installation


INSTALLATION IN PROGRESS

Longi. bulkhead longi. Installation


process

Deck Longi plate installation


RENEWAL PROCESS COMPLETE

LBL after renewal process

NO6 WBT (S) structural after renewal


process complete
RENEWAL PROCESS COMPLETE

Bulkhead 29 after renewal


Process complete

NO6 WBT (S) structural after renewal


process complete
HULL STRUCTURAL WEIGHT
ESTIMATION

Detail Estimation Weight of Steel Hull


Structural plate Renewal’s on Excel Table
..\No6 WBT (S) final material replacement estimation\No 6 WBT (S).xls
Malaysian
Shipping
Chapter 2 Project’s Involved Classification
(SCM)
 MV FAJAR SAMUDERA (CRUISE
VESSEL)

Operations Involved

 Locate of Zink
Anode

 Painting Process
Malaysian
Operations Involved Shipping
Classification
 Locate of Zink (SCM)
Anode
Operation explanations

 Subcontractors Company (Vital wise).

 Zink anode used to prevent from


corrosion
factors happen in faster by sea water
effects.
 Process locate Zink anode at
outboard of
vessel (under hull).
 Zink anode size depend on size of
vessel
and location to located.
Malaysian
Shipping
Classification
(SCM)
OUTBOARD (AFT STRUCTURE

Process Locate Zink anode (P)

Aft (Port sided)


Malaysian
Shipping
Classification
(SCM)
OUTBOARD (AFT STRUCTURE

Zink Anode Located at Rudder

Zink Anode (1kg)


Malaysian
Operations Involved Shipping
Classification
 Painting Process (SCM)

Operation explanations

 Subcontractors Company (Vital wise).

 Painting coating layer are depend on


Superintendent of the vessel request.
 For normal coating its four layers
only.
Malaysian
Shipping
Classification
(SCM)
STARBOARD SIDED PAINTING

Painting in progress

Starboard sided painting


Malaysian
Shipping
Classification
(SCM)
STARBOARD SIDED (FOREWORD

Starboard sided (foreword) painting


in progress

Starboard sided after painting process


Chapter 3 Current Project

 SPAR TRUSS KIKEH OFFSHORE (MDFT)


(CURRENT PROJECT)

 MDFT
 FPSO
 TOPSIDE
 SPAR TRUSS

 MDFT = MALAYSIAN DEEP WATER FLOATING TERMINAL


 FPSO = FLOATING PRODUCTIONS STRORAGE
OFFLOADING & OFFSHORE
 TOPSIDE = OFFSHORE PLATFORM
 TRUSS SPAR = OFFSHORE LEG
MDFT – FPSO
KIKEH

SPAR TRUSS KIKEH OFFSHORE (MDFT)


(CURRENT PROJECT)

 FPSO


FPSO = FLOATING PRODUCTIONS STRORAGE
OFFLOADING & OFFSHORE
MDFT – FPSO
KIKEH

FPSO KIKEH under Conversion process

MDFT – FPSO KIKEH Conversion


process
MDFT – FPSO
KIKEH

FPSO KIKEH Final Conversion

MDFT – FPSO KIKEH Complete


Conversion
MDFT – SPAR

PLATEFORM

SPAR TRUSS KIKEH OFFSHORE (MDFT)


(CURRENT PROJECT)

 TOPSIDE


TOPSIDE = OFFSHORE SPAR PLATFORM
MDFT – SPAR

PLATEFORM

SPAR TOPSIDE PLATEFORM

KIKEH SPAR
MDFT – SPAR
TRUSS

SPAR TRUSS KIKEH OFFSHORE (MDFT)


(CURRENT PROJECT)

 SPAR TRUSS


TRUSS SPAR = OFFSHORE LEG
MDFT – SPAR
TRUSS

Truss Structure

Truss Section
MDFT – SPAR
TRUSS

SPAR TRUSS Detail Structure

SPAR TRUSS Structure


End of
presentation