Plant Overview

3. System/Process Outline
1st : July 08 & 09, 2008 2nd : July 12 & 13, 2008 TOSHIBA PLANT SYSTEMS & SERVICES CORPORATION

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

Plant Overview

3. System/Process Outline
1. 2. 3. 4. 5. 6. 7. 8. 9. Condensate System HRSG HP and LP System Feedwater System Main and Auxiliary Steam System Extraction Steam System Turbine Bypass System CW & ACW System CCCW System Condensate Drain System
Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

Plant Overview

Condensate System (1)


1. Function of System
Makeup Water

PRE HTR

HPSH#2

HPSH#1

HP ECO

HP EVA

LP EVA

LPSH

Stack

The purpose of Condensate System is mainly to Condense the ST exhaust steam or dumpedDea HP LP steam by the Turbine Bypass System Feed the condensed water to the HRSG
ST GS System

Recirc. Pump

MP Line ( SLP ) LP Line ( SLP )

This system is comprised of the following lines ;BFP Mainstream Recirculation Line Spray Line MP Line ( LCP ) Gen GT Comp. Steam Turbine Gen Seal Water line
M M

Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent

BD Tank (Intermittent)

ST LP Casing Spray

2. Outline of System

CP LP Line ( LCP )

GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

Plant Overview

Condensate System (2)


2.1. Condensate System Mainstream (1) Function of the line
Makeup Water Recirc. Pump

BD Tank (Intermittent)

This system contains the following major equipment ;


M

MP Line ( LCP )

MP Line ( SLP ) LP Line ( SLP )

Main Condenser Gen GT Comp. Steam Turbine Gen Vacuum Pumps Condensate Pumps (CPs) ST Gland Steam Condenser (GSC)

ST LP Casing Spray

CP

GSC

LP Line ( LCP )

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

Dea The purpose of Condensate System is to ; HP LP Condense the ST exhaust steam Condense dumped steam by the Turbine Bypass System Startup BD Tank BD Tank ST GS System Vent (Continuous) (Intermittent) Startup Feed the condensate water to the Deaerator BFP Vent
HPSH#2 HPSH#1 HP ECO HP EVA LP EVA LPSH

PRE HTR

Stack

Plant Overview

Condensate System (3)


2.1. Condensate System Mainstream (2) Major Equipment Information
Equipment
Main Condenser

Type
Circular/ Axially Mounted/ Two Pass/ Divided Liquid Ring Vertical

Capacity, Design
Heat Load:37415kJ/s, Tube Material: SA249 TP316L 2x100% 2x100%, Flow:107m3/h, Total Head:193m @990kg/m3 1x100%

Manufacturer
Larsen & Toubro (India)

Vacuum Pumps Condensate Extraction Pumps ST Gland Steam Condenser

Tsurumi (Japan) Torishima (Japan)

Shell & Tube

Siemens (Czech) This is a part of ST System


5

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

Plant Overview

Condensate System (4)


2.1. Condensate System Mainstream (3) Hotwell Level Control
Makeup Water Recirc. Pump

Condenser Hotwell is controlled by the HP CV at the Deaerator Inlet.


HPSH#2 HPSH#1 HP ECO

Dea LP
PRE HTR LP EVA Stack

ST GS System

BD Tank (Intermittent) BFP

M M

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

Note The Makeup-water CV at DeaeratorStartup inlet BD Tank BD Tank Vent (Continuous) (Intermittent) is used for the level control of the LP Startup Vent Drum.
LPSH

HP EVA

Plant Overview

Condensate System (5)


2.2. Condensate Recirculation Line
Makeup Water

PRE HTR

HPSH#2

HPSH#1

HP ECO

HP EVA

LP EVA

In general, this system is provided to secure minimum required water flow for either condensate pump or GSC (gland HP steam condenser).
ST GS System

Recirc. Pump

Dea LP
Stack

Vent (Continuous) (Intermittent) In SLP case minimum requirement Startup Vent comes from GSC (Min. Required Flow : 25 t/h) BD Tank BD Tank
M M

Startup

BD Tank (Intermittent) BFP

MP Line ( LCP )

Recalculation flow goes back to the Gen GT Comp. Gen Condenser Hotwell Pneumatic actuated FCV and FT are provided for this purpose

Steam Turbine

MP Line ( SLP ) LP Line ( SLP )

ST LP Casing Spray

CP LP Line ( LCP )

GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

Line is tapped from GSC outlet

LPSH

Plant Overview

Condensate System (6)


2.3. Condensate Spray Line

Makeup Water

This line feeds spray water to the following system/equipment ; Recirc. Pump

ST GS System

After the tapping point, Ystrainer is installed. Differential pressure is monitored MP Line ( LCP ) Gen Comp. by DCS. GT Gen
M M

Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Vent

BD Tank (Intermittent) BFP

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

LP Extraction Steam DSH HP ST LP Casing Spray ST Gland Steam System Spray HP and LP Turbine Bypass DSHStartup
HPSH#2 HPSH#1 HP ECO HP EVA LPSH

Dea LP
PRE HTR LP EVA Stack

Plant Overview

Condensate System (7)


2.4. Condensate Seal Water Line
Makeup Water

This line feed seal water to the following equipment/system ; Vacuum Pump Seal Line HP

Recirc. Pump

Dea LP
PRE HTR LP EVA

ST GS System

The following need seal water to avoid air entering inside the devices;
Startup Vent
M M

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent

BD Tank (Intermittent) BFP

MP Line ( SLP ) LP Line ( SLP )

Condenser Drain Valve MP Line ( LCP ) Condensate Pump Inlet Isolation Valves Gen GT Comp. Steam Turbine Gen Minimum Flow Control Valve Outlet Isolation Vacuum Breaker Outlet Pipe
LP Line ( LCP )

ST LP Casing Spray

CP

GSC

P&ID LINK

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

The valves which downstream or upstream is connected to vacuum lines.


HPSH#2 HPSH#1 HP EVA HP ECO LPSH

Stack

Plant Overview

2. HRSG HP and LP System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

10

Plant Overview

1. General

HRSG (1)

One (1) - natural circulation, horizontal gas flow, dual pressure heat recovery steam generator (HRSG) is provided to produce superheated steam by exchanging the heat from the GT exhaust gas. All the devices/equipment of the HRSG (both HP and LP) are controlled by plant DCS.

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

11

Plant Overview

2. LP System 2.1. LP System Main Equipments/Lines


HRSG LP System mainly consists of ; Heat Exchanger Preheater LP Drum with Deaerator Associated System/Equipment - Preheater Recirculation Line* - Preheater Bypass Line* Makeup Water Line to Deaerator* Pegging Steam Line* Chemical Injection Line Intermittent Blowdown Line LP Startup Vent (on outlet piping)
Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

HRSG (2)

LP Evaporator LP Superheater

12

Plant Overview

HRSG (3)
2.2. Preheater and Associated System (1) Preheater Recirculation Line
This system is provided for the purpose of maintaining the tube outer surface temperature of the Preheater above dew point of HP exhaust gas.
HPSH#2 HPSH#1 HP ECO HP EVA LPSH

Inlet Temp 50C

Makeup Water

Recirc. Pump

Dea LP
PRE HTR LP EVA Stack

ST GS System

BD Tank (Intermittent) Inlet Water Temp < 50 C Startup BFP Vent The system will be online. Inlet Water Temp 50C BD Tank (Continuous) BD Tank (Intermittent)

Startup Vent

Preheater outlet water is returned to the inlet


M

MP Line ( LCP )

2x100% Recirculation Pumps are provided. Gen GT Comp. ARC Valve is provided for the control of minimum required flow.
GSC Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project CP Gen Steam Turbine

ine P)

ne P)

ST LP Casing Spray

ST GS System Spray

13

LP Line ( LCP )

Plant Overview

HRSG (4)
2.2. Preheater and Associated System (2) Preheater Bypass Line
This system is provided for the purpose of avoiding steaming at downstream of the Hotwell Level CV HP Valve before Deaerator.
HPSH#2 HPSH#1 HP ECO HP EVA

Drum Temp - 1C
Recirc. Pump

Makeup Water

Dea LP
PRE HTR LP EVA Stack

ST GS System

BD Tank (Intermittent)

Vent

BFP

Water temp after the confluence is controlled by the bypass flow.


M M

MP Line ( LCP )

Water temp before the CV is controlled at ; Gen GT Steam Turbine Gen LP Drum Comp. Temp - 1 C

ine P)

ne P) GSC Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project CP LP Line ( LCP )

ST LP Casing Spray

ST GS System Spray

Preheater Outlet Temp LP Drum Temp Startup BD Tank BD Tank Vent (Intermittent) (Continuous) will be online. The system Startup

LPSH

14

Plant Overview

HRSG (5)
2.3. LP Drum with Deaerator and Associated System (1) Make-up Water Line to Deaerator
To handle large amount of makeup water that need deaeration, the Make-up Water HP Line is connected to the Deaerator.
HPSH#2 HPSH#1 HP ECO HP EVA
ST GS System Startup Vent BD Tank (Continuous) BD Tank (Intermittent) Makeup Water Recirc. Pump

Dea LP
PRE HTR LP EVA LPSH Stack

Deaerator is installed on the LP Drum


Startup Vent

BD Tank (Intermittent) BFP

Deaerator is designed to reduce DO (Dissolved Oxygen) content down to a maximum of 7 ppb.


M M

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

15

Plant Overview

HRSG (6)
2.3. LP Drum with Deaerator and Associated System (1) Make-up Water Line to Deaerator (Continue)
LP Drum water level is controlled by the make-up water flow CV.
Note The CV at Deaerator inlet is used for the level control of the Condenser Hotwell.
HPSH#2 HPSH#1 HP ECO HP EVA
Startup Vent BD Tank (Continuous) BD Tank (Intermittent) Makeup Water Recirc. Pump

Dea LP
PRE HTR LP EVA LPSH Stack

HP

ST GS System

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

16

Plant Overview

HRSG (7)
2.3. LP Drum with Deaerator and Associated System (2) Pegging Steam Line
Makeup Water Recirc. Pump

Dea HP
HPSH#2 HPSH#1 HP ECO HP EVA LPSH

LP
PRE HTR LP EVA Stack

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

MP Line ( SLP ) LP Line ( SLP )

Pegging Steam Line is provided to utilize auxiliary steam for water heating and deaerating the LP drum water prior to and during unit start.
Steam Turbine CP GSC

LP Line ( LCP )

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

17

Plant Overview

3. HRSG HP System 3.1. HP System Main Components/Lines


HRSG HP System mainly consists of ; Heat Exchanger HP Economizer HP Drum HP Evaporator HP Superheater#1 HP Superheater#2 Associated System/Equipment - Continuous Blowdown Line - Intermittent Blowdown Line - Desuperheator (between #1 and #2) - HP Startup Vent (on outlet piping) - ST Gland Steam Supply Line* (on outlet piping) (Common for HP and LP System)
Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

HRSG (8)

Blowdown System

18

Plant Overview

HRSG (9)
3.2. HP Steam System and Associated System (1) ST Gland Seal Steam Supply System
Gland seal steam for the ST is supplied from HPSH outlet Dea Required Steam Condition for the LP Steam Turbine is as follows ;
Recirc. Pump Makeup Water

HP
HPSH#2 HPSH#1 HP EVA

PRE HTR

HP ECO

LP EVA

LPSH

Stack

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent

BD Tank (Intermittent)

BFP

M M

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

Pressure : Min. 20 bar(g) Temperature : Min. 320 C

ST GS System Spray

19

Plant Overview

3. Feedwater System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

20

Plant Overview

Feedwater System (1)


1. Function of System
The purpose of the Feedwater System is mainly to supply the feedwater from the HRSG LP Drum to the HRSG BD Tank ST GS System HP Section.
HPSH#2 HPSH#1

Makeup Water

Recirc. Pump

Dea HP
HP ECO HP EVA LPSH

LP
PRE HTR LP EVA Stack

Startup Vent

(Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

21

Plant Overview

Feedwater System (2)


2. Outline of System

ST GS System Startup Vent Makeup Water

This system is comprised of the following lines ; Mainstream Recirculation LineHP Spray Line BFP Balance Line
HPSH#2 HPSH#1 HP EVA

Recirc. Pump

Dea LP
PRE HTR HP ECO LP EVA LPSH Stack

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

22

Plant Overview

Feedwater System (3)


2.1. Feedwater System Mainstream
Makeup Water

Startup Vent

(Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

This system includes following equipment ;


MP Line ( LCP ) MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP )

Boiler Feed Water Pumps (BFPs)


Gen GT Comp. Gen Steam Turbine

ST LP Casing Spray

GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

The purpose of the Feedwater System Mainstream is to supply feedwater from the HRSG LP Drum to the HRSG HP Section. Tank BD ST GS System
HPSH#2 HPSH#1

Recirc. Pump

Dea HP
HP ECO HP EVA LPSH

LP
PRE HTR LP EVA Stack

23

Plant Overview

Feedwater System (4)


2.1. Feedwater System Mainstream (2) Major Equipment Information
Equipment
Boiler Feed Water Pumps

Type

Capacity, Design

Manufacturer

Multistage 2x100%, Torishima Centrifugal Pump Flow:92.6 m3/h, (Japan) Total Head:888 m @931kg/m3, Diff Press : 81barG

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

24

Plant Overview

Feedwater System (5)


2.2. Feedwater Recirculation Lines
Makeup Water

This system is provided to secure minimum required water flow for Boiler Feedwater HP Pump.
HPSH#2 HPSH#1 HP ECO HP EVA

Recirc. Pump

Dea LP
PRE HTR LP EVA LPSH Stack

The recirculation flow goes back to LP Drum. Pneumatic actuated FCV MP Line ( LCP ) Gen GT Comp. and FT are provided on each Recirculation Line.

Startup Vent

(Continuous)

(Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP )

ST LP Casing Spray

CP LP Line ( LCP )

GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

The lines are tapped from BD Tank ST GS System each pump discharge.BD Tank

25

Plant Overview

Feedwater System (6)


2.3. BFP Balance Lines
The pump is equipped with a thrust balancing mechanism HP inside the pump. Inside the pump, part of the discharge water goes into this BD Tank BD Tank ST GS System (Continuous) (Intermittent) mechanism, then discharged Startup Vent outside the pump.
HP EVA HPSH#2 HPSH#1 HP ECO LPSH

Makeup Water

Recirc. Pump

Dea LP
PRE HTR LP EVA Stack

Startup Vent BFP


M M

BD Tank (Intermittent)

The outlet nozzle of the balance line is connected to LP MP Line ( LCP ) drum for Gen GT recovery. water Comp.
MP Line ( SLP ) LP Line ( SLP )

Gen

Steam Turbine

ST LP Casing Spray

CP LP Line ( LCP )

GSC

BFP Section

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

26

Plant Overview

Feedwater System (7)


2.4. Feedwater Spray Lines
This line feeds spray water to the following system ;
HP EVA

Makeup Water

Recirc. Pump

Dea LP
PRE HTR LP EVA LPSH Stack

HP to MP Extraction System MP Extraction Steam System


HPSH#2 HPSH#1 HP ECO

HP

BD Tank ST System GSAfter the tapping (Continuous) Startup Vent point, Y-strainer is installed

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

Differential pressure MP Line ( LCP ) Gen is monitored GT DCS. by Comp.


MP Line ( SLP ) LP Line ( SLP )

Gen

Steam Turbine

ST LP Casing Spray

CP LP Line ( LCP )

GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

27

Plant Overview

4. Main & Aux. Steam System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

28

Plant Overview

Main & Aux. Steam System (1)


1. Function of System
Makeup Water

HP
HPSH#2 HPSH#1 HP ECO HP EVA LPSH

PRE HTR

The purpose of Recirc. Pumpsystem is this mainly to supply HRSG Dea production steam to the Steam LP Turbine.
LP EVA Stack

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

29

Plant Overview

Main & Aux. Steam System (2)


2. Outline of System
Makeup Water

This system is comprised of the following lines ;


HP
HPSH#2 HPSH#1 HP ECO HP EVA LPSH

Recirc. Pump

PRE HTR

LP EVA

Stack

Dea HP Main Steam Line LP LP Main Steam Line HP to MP Steam Bypass Line
Startup Vent BFP
M M

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

30

Plant Overview

Main & Aux. Steam System (3)


2.1. HP Main Steam Line
Makeup Water Recirc. Pump The purpose of the line is to Dea supply HPSH outlet steam to the LP Steam Turbine HP Section.
PRE HTR HP ECO LP EVA LPSH Stack

HP
HPSH#2 HPSH#1 HP EVA

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

( SLP ) This line contains the HP steam isolation valve ; LP Line ( SLP ) Isolation for HP main steam Valve) bypass line for HP turbine warming LP Line ( LCP MP Line

ST LP Casing Spray

CP

GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

31

Plant Overview

Main & Aux. Steam System (4)


2.2. LP Main Steam Line
Makeup Water Recirc. Pump The purpose of the line is to Dea supply the LPSH outlet steam to LP the Steam Turbine LP Section.
PRE HTR HP ECO LP EVA LPSH Stack

HP
HPSH#2 HPSH#1 HP EVA

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

32

Plant Overview

Main & Aux. Steam System (5)


2.3. HP to MP Bypass Line
Makeup Water Recirc. The purpose of thePump is to line Dea deliver the HPSH outlet steam LP to the Extraction System by bypassing the Steam Turbine.
PRE HTR LP EVA Stack

HP
HPSH#2 HPSH#1 HP EVA HP ECO LPSH

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent

This line conains the following ; BD Tank


(Intermittent)

HP to MP PRDS
M M

BFP

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

33

Plant Overview

5. Extraction Steam System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

34

Plant Overview

Extraction Steam System (1)


1. Function of System
The purpose of this system is to feed the Steam Turbine extraction steam. HP
HPSH#2 HPSH#1 HP ECO HP EVA LPSH

Makeup Water

Recirc. Pump

Dea LP
PRE HTR LP EVA Stack

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

35

Plant Overview

Extraction Steam System (2)


2. Outline of System
MP Extraction Steam Line
HPSH#2 HPSH#1 HP ECO HP EVA

Makeup Water

This system is comprised of the following lines ;


Dea LP
PRE HTR LP EVA LPSH

Recirc. Pump

LP Extraction Steam Line


ST GS System Startup Vent BD Tank (Continuous) BD Tank (Intermittent) Startup Vent

HP

Stack

BD Tank (Intermittent) BFP

M M

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

36

Plant Overview

Extraction Steam System (3)


2.1. MP Extraction Steam Line
Makeup Water

The line is equipped with DSH to meet the temperature Dea requirement at T.P.
HP
HP EVA

Recirc. Pump

ST GS System

Startup BD Tank BD Tank BD Tank Vent Interconnection Line is (Intermittent) provided with LCP. (Normally isolated) (Continuous) (Intermittent) Startup Vent BFP

T.P. Press : 26.0 barG M T.P. Temp : 243.1 C M(Sat. temp + 15 C)


MP Line ( LCP ) Gen GT Comp. Gen Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

No PCV is provided on the line Pressure is controlled by the Steam Turbine. (Internal Extraction Pressure Control)
PRE HTR HPSH#2 HPSH#1 HP ECO LP EVA LPSH Stack

LP

37

Plant Overview

Extraction Steam System (4)


2.2. LP Extraction Steam Line
Makeup Water

The line is equipped with PRDS to meet the pressure/temperature Dea requirement at T.P.
PRE HTR HPSH#2 HPSH#1 HP ECO HP EVA LP EVA

Recirc. Pump

Interconnection Line is provided with LCP. (Normally isolated)


LPSH Stack

HP

LP

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP

BD Tank (Intermittent)

T.P. Press :M9.8 barG T.P. Temp :M203.3 C (Sat. temp + 20 C)


MP Line ( LCP ) Gen GT Comp. Gen Steam Turbine MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP )

ST LP Casing Spray

GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST GS System Spray

38

Plant Overview

6. Turbine Bypass System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

39

Plant Overview

Turbine Bypass System (1)


1. Function of System
The purpose of Turbine Bypass system is to dump excess steam to Condenser.

This system is used in the cases that steam pressure at the Steam Turbine inlet needs to be controlled, namely ;
Steam Turbine Start-up or Shutdown Steam Turbine Trip

The system is controlled by plant DCS.

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

40

Plant Overview

Turbine Bypass System (2)


2. Controlled Parameters
The Turbine Bypass System contains pressure reducing valves and desuperheaters to control the following parameters ; Controlled Parameter HP Turbine Bypass Line LP Turbine Bypass Line ST Inlet Press. Cond. Inlet Temp. ST Inlet Press. Control Device HP PRDS (control valve part) HP PRDS (desuperheater part) PCV

Cond. Inlet Temp.

DSH

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

41

Plant Overview

Turbine Bypass System (3)


3. System Capacity
HP TB System Capacity : 100 % HP
HPSH#2 HPSH#1 HP ECO HP EVA LPSH

Makeup Water

Recirc. Pump

Dea LP
PRE HTR LP EVA

LP TB System Capacity : 100 %


Stack

ST GS System Startup Vent

BD Tank (Continuous)

BD Tank (Intermittent)

Startup Vent BFP


M M

BD Tank (Intermittent)

MP Line ( LCP )

Gen

GT

Comp.

Gen

Steam Turbine

MP Line ( SLP ) LP Line ( SLP ) CP LP Line ( LCP ) GSC

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

ST LP Casing Spray

ST GS System Spray

42

Plant Overview

7. CW & ACW System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

43

Plant Overview

CW & ACW System (1)


1. Circulating Water System (CW System) (1) Outline of System
The purpose of CW System (Circulating Water System) is to supply cooling water to the Main Condenser. This system contains the following major equipment ; Cooling Tower Circulating Water Pumps (CWPs) Condenser Tube Cleaning System
Ball Separator Cooling Tower Main Condenser

CWPs

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

44

Plant Overview

CW & ACW System (2)


1. Circulating Water System (CW System) (2) Major Equipment Information
Equipment
Cooling Tower

Type
Mechanical/ Induced Draft/ Counter Flow Centrifugal Pump

Capacity, Design
2x60% (2 Cells), 4750 m3/h 2x100%, Flow : 4442m3/h, Total Head : 21.8m @993kg/m3 -

Manufacturer
ICS (USA)

Circulating Water Pumps (CWPs) Condenser Tube Cleaning System

Torishima (Japan)

On-load Ball Cleaning

GEA (India)

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

45

Plant Overview

CW & ACW System (3)


2. Auxiliary Cooling Water System (ACW System) (1) Outline of System
The purpose of ACW System (Auxiliary Cooling Water System) is to supply cooling water to the following systems. CCCW* System for Gas Turbine CCCW* System for Steam Turbine Vacuum Pump Seal Water Cooler The line is directly tapped from the Cooling Tower Basin. Cooling water for the above system is circulated by dedicated pump (Auxiliary Cooling Water Pump). The return line is connected to CW line before Cooling Tower inlet.
(*)CCCW = Closed Cycle Cooling Water
Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

46

Plant Overview

CW & ACW System (4)


2. Auxiliary Cooling Water System (ACW System) (1) Outline of System (Continue) Main Condenser
Ball Separator Cooling Tower
Vac. Pump Seal Water Coolers

CWPs

ACWPs

CCCW System for Gas Turbine CCCW System for Steam Turbine

The line is directly tapped from the Cooling Tower Basin. Aux. cooling water is pumped up and supplied by dedicated pump (Auxiliary Cooling Water Pump). Interconnection line is provided for water filling of CW System. The return line is connected to the CW line before the Cooling Tower inlet.
Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

47

Plant Overview

CW & ACW System (5)


2. Auxiliary Cooling Water System (ACW System) (2) Major Equipment Information
The system contains the following major equipment ;
Equipment Type Capacity, Design Manufacturer

Aux Cooling Water Pumps (ACWPs)


CCCW Heat Exchangers for GT CCCW Heat Exchangers for ST

Centrifugal Pump

2x100%, Flow : 400m3/h, Total Head : 40m @1000kg/m3


Heat Exchange :2026kW Heat Exchange :1147kW

Torishima (Japan)

Plate

Hisaka (Japan)

Plate

Hisaka (Japan)

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

48

Plant Overview

8. CCCW System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

49

Plant Overview

CCCW System (1)


1. Outline of System
The purpose of CCCW System (Closed Cycle Cooling Water System) is to circulate cooling water for the following heat exchangers. The system is comprised of following the two circuits.

CCCW System for Gas Turbine


CCCW System for Steam Turbine & BOPs

Heat from the equipment is absorbed in the CCCW system. Then the heat is transferred to ACW System by the CCCW Heat Exchangers. (Indirect contact heat exchange)

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

50

Plant Overview

CCCW System (2)


2. CCCW System for Gas Turbine & Auxiliaries
Cooling System for the GT related components are independently provided. Cooling water is circulated by a shaft driven pump of the GT. A dedicated Head Tank for this circuit is provided.
Makeup (Demin Water)

GT Package
Generator Coolers

Head Tank for GT

CCCW HEX for GT 2x100%

Lube Oil Coolers Flame Detectors Chemical Pot GT Support Legs

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

51

Plant Overview

CCCW System (3)


3. CCCW System for Steam Turbine & BOPs
This system supplies cooling water for the other components than the GT components. A dedicated Head Tank for this circuit is provided.

Head Tank for ST Chemical Pot

STG Lube Oil Coolers ST Generator Coolers BFPs


HRSG Preheater Recirc. Pumps

CCCW HEX for ST 2x100%

Sampling Rack Cooler

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

52

Plant Overview

9. Condensate Drain System

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

53

Plant Overview

Condensate Drain System (1)


1. Outline of System
The purpose of this system is to collect drains from the Steam Turbine and transfer those back to the Condenser Hotwell by pumps.

The system is contains the following equipment ;


Condensate Drain Flash Pipe

Condensate Drain Pumps

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

54

Plant Overview

Condensate Drain System (2)


1. Outline of System (Continue)

Steam Turbine

Main Condenser

Condensate Drain Pumps (2x100%)

Flash Pipe

Upper piping of the Flash Pipe is connected to the Condenser tube bundle zone. Flash Pipe drain is transferred to the Condenser Hotwell.
Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

55

Plant Overview

End of 3. System/Process Outline

TOSHIBA PLANT SYSTEMS & SERVICES CORPORATION

Classroom Lecture for SLP 60MW CCGT Power Plant Expansion Project

56