Group Members: Usama Fareed UE-027 Tanveer Rehman UE-053 Rizwan UE-040 Shahbaz Rehmat UE-021
Department of Urban & Infrastructure Engineering NED University of Engineering & Technology
Content:
Introduction Spot speed Traffic mix Delays LOS Illegal Parking Illegal movement Cause of accidents
Introduction:
Location Map
Introduction:
Spot Speed:
Methodology:
Formula: Speed =
Data Sheet
Spot Speed:
Results:
Bound East Speed N Mean 15th Percentile 85th Percentile N Mean 15th Percentile 85th Percentile N Mean 15th Percentile 85th Percentile N Mean 15th Percentile 85th Percentile Cars 27
18.7958 14.2170 24.1254 27 24.8358 16.6984 31.6616 27 39.7187 31.8272
Bikes 27
24.5867 18.0640 32.8862 27 32.6281 24.1094 39.9122 27 38.3380 30.0280
Rickshaws 27
17.6517 12.3840 20.5084 27 23.5320 16.8254 31.6028 27 32.3754 22.7970
Buses 27
15.5983 10.5380 18.9656 0 0 0 01 27 26.0364 17.7216
Trucks 27
12.1423 7.7750 15.9462 27 15.9378 10.8634 21.5060 27 28.0609 21.0056
West
North
49.1896
27 26.4177 20.7188 31.9720
46.5570
27 27.1180 20.3964 35.1296
42.3422
27 23.8091 18.1162 28.4906
32.6152
27 20.6844 16.4524 24.5342
34.4534
27 20.7033 13.0150 30.2604
South
Traffic Volume:
Methodology:
Data Sheet
Traffic Volume:
Results:
Bound East Direction Straight Right Left Straight Right Left Straight Right Left Straight Right Left Peak Hour Factor 0.645 0.609 0.734 0.915 0.656 0.875 0.850 0.859 0.688 0.950 0.878 0.898
North
West
South
Traffic Volume:
Results:
Delays:
Methodology: Formula: ds=Vs*20/V
Delays:
Results:
Bound
East North West South
Delays (sec/veh.)
43.141 41.226 63.825 42.748
LOS
D D E D
LOS A B C D E F
Formula:
Y= (3600* Total No of Observations) ( (a/3)+(b/4)+(c/5)+(d/6) )
964.308
1176.783 1397.467 1322.268
Video:
This intersection has the capacity to serve at LOS C if following measures are taken into account: Proper Road Marking (Zebra Crossing, lanes) Signal Timing is very wrong it must be revised according to the present traffic volume. The surface of road is dismantled at every leg, patching should be done. Signals must be operated by solar energy in order to have full day working. Illegal Stands of Edhi and Cheepa must be removed in order to facilitate the pedestrians. Illegal Parking and Illegal movement must be controlled by strict management.