INTRODUCTION
OVERHAUL PROCESS DOCUMENT REQUIRED TIME LINE TOOLS
INTRODUCTION
OVERHAUL PROCESS DOCUMENTS REQUIRED TOOL AND EQUIPMENT TIME LINE
INTRODUCTION
The landing gear system on a conventional aircraft tricycle configuration consisting of a nose landing gear and left and right main landing gear. Each landing gear includes a shock strut with two wheel and tire assemblies. Each main landing gear wheel is equipped with a brake assembly with anti-skid protection and it is located in the lower left and right wing area adjacent to midfuselage. The nose landing gear is steerable and it is located in the lower forward fuselage.
Your Partner in Competitive Solutions
INTRODUCTION
INTRODUCTION
OVERHAUL PROCESS DOCUMENT REQUIRED TOOL AND EQUIPMENT TIME LINE
OVERHAUL PROCESS
ENTRY
DISASSEMBLY
CLEANING
INSPECTION
OVERHAUL PROCESS
REPAIR/REBUILT
ASSEMBLY
TESTING
PACKING
OVERHAUL PROCESS
STEP 3
Parts are cleaned and bushings removed from those parts that have bushings. All bushings are removed and discarded.
STEP 4
Paint is removed utilizing a blast cabinet and the media used is plastic chips which only remove the paint. The cadmium will be removed later by chemical strip.
STEP 5
Parts are inspected and a detailed ICR (incoming condition report) is made and compared to the design allowances. The engineering department after review of the ICR selects those operations necessary to repair the part and prints a routing for that
Your Partner in Competitive Solutions
STEP 6
Parts are sent based on their specific routing to the machine shop or plating as required. Chrome-plated surfaces are inspected and replated with the correct specification process if needed.Then, the parts are shotpeened and stripped and thus being inspected by magnetic particle again.
OVERHAUL PROCESS
STEP 7
New bushings are installed. The new bushings are made to the exact size for the part after all of its rework. If the landing gear components are found Part is prime painted and top coat painted and thus being sent for assembly.
STEP 8
All the landing gear hydraulic system components are tested after final assembly. The landing gear is put in a special hydraulic press to compress the shock for testing proposes. After the testing procedure, the shock absorber is deflated to a reduced pressure for shipping.
STEP 9 The landing gear are being packed using bubble wrap to avoid
from vibration and as surface protection.
INTRODUCTION
OVERHAUL PROCESS DOCUMENTS REQUIRED TOOL AND EQUIPMENT TIME LINE
DOCUMENTS REQUIRED
ENTRY
CONTRACT
DOCUMENTS REQUIRED
INSPECTION
REPAIR/REBUILT
INTRODUCTION
OVERHAUL PROCESS DOCUMENTS REQUIRED TOOL AND EQUIPMENT TIME LINE
FORKLIFT
ARDROX 6085
BORE MACHINE
BUBBLE WRAP
INTRODUCTION
OVERHAUL PROCESS DOCUMENTS REQUIRED TOOL AND EQUIPMENT TIME LINE
TIME LINE
NO.
1.
DESCRIPTION ENTRY:
DOCUMENT
OPERATOR HOURS
1 day
2 2 2 3
3.
4.
INSPECTION: MPI/DPI
INSPECTOR LEVEL 2 CHECK
5.
REPAIR/REBUILT:
TIME LINE
NO.
6.
OPERATOR HOURS
1 day
2.
1 day 1 day
2 2
3.
THANK YOU