Professional Documents
Culture Documents
Process
Met two times per month for two years Analyzed existing zoning and Sustainable Northampton Plan Conducted focus group meetings with neighborhood groups, developers, etc. Held five public forums Accepted public comment at every meeting
Zoning Revisions Process
KEY RECOMMENDATIONS
Concentrate development and allow for a wide range of housing types and work spaces in walkable, mixed-use neighborhood, village and commercial centers Minimize development in areas that lack infrastructure or have significant environmental, open space or agricultural resources Promote environmental performance, including energy and resource efficiency Make the zoning code more user-friendly and processes more transparent Promote design that fits into neighborhoods so that new development makes the city a better place.
Key Recommendations
Long-term:
Invest in a comprehensive effort to restructure and rewrite the entire zoning code
Medium-term:
Address parking in dense residential neighborhoods (e.g. through onstreet residential parking permits AND changes to parking requirements in zoning)
Short-term:
Revise urban agriculture provisions (backyard chickens) Revise Home Business Provisions Revise Accessory Apartment Provisions Revise Planned Development Provisions Revise Dimensional Standards for URC, URB, and URA Establish design standards for larger projects Develop a non-binding design guidebook to encourage compatible design in Northampton Take steps to make the zoning easier to understand
Home Businesses
Overview of Current Regulations
A home occupation does not require Special Permit only if: No clients or customers are seen on site There is no sign for the business There are no sales of goods from the premises You dont meet or work with other people in your house
If home business activity doesnt fit this narrow definition, then a Special Permit is required to allow a small sign, sale of goods from the home, or one other person to work with you
Strategies
Regulate auto traffic instead of clients and customers seen Do not distinguish between types of visits (by client, employee, delivery person, contractor, etc.)
Reduces
Traffic and use of nonrenewable resources Cost of doing business in Northampton Regulations - fewer special permits required
(Slide # 10)
Does not cause any outward manifestation that is uncharacteristic of or an additional disturbance to the neighborhood
e.g. traffic, parking congestion, noise or air pollution, outdoor materials storage, public service or utility demand
Does not include any clinical medical/dental practice, veterinary hospital, restaurant, retail or wholesale supply shop or store, or mortuary. Other uses may be excluded on a case-by case basis.
(Slide # 11)
It does not produce noise, obnoxious odors, vibrations, glare, fumes or electrical interference detectable to normal sensory perception beyond the lot line The structure conforms to all applicable fire, building, and health codes. A one square foot sign, attached to building and not lighted, is allowed If in an accessory structure, structure must conform to setback requirements for accessory structures in that district, unless a Finding by the ZBA in accordance with 350 9.3 is made Must be registered with the city including business hours, vehicle trips, etc.
Other than providing these additional options by Special Permit, ALL OTHER PROVISIONS FOR HOME BUSINESS BY RIGHT STILL APPLY (See Slides 10 & 11)
Why Does this Matter? - Zoning doesnt match our existing neighborhoods - We have great urban neighborhoods that can never be built again!
*Non-Conforming refers to a property that is used or structures that are built in a way that is not permitted by the zoning for the property. The use is grandfathered, or permitted to continue, because the land was being used in such a fashion before the zoning law was passed. **This analysis looked only at conformance with lot size requirements. An analysis of properties that also meet minimum setback, frontage and other requirements would yield even higher rates of non-conformance
84%
Lot Size: 5,183 Square Feet Today, would need 12,000 SF to build this home Would need 8,000 SF to even build a single family home
Infill
Infill is rose to the Surface as a Critical Issue for Sustainability Infill is new construction or redevelopment that 'fills in' empty lots or adds units or uses in areas that are already developed Infill is an important tool for concentrating development in walkable neighborhoods, rather than sprawling into undeveloped areas Infill is the historic pattern of development in Northampton
Parking Lots
Economy:
More residents to support nearby businesses, both existing and new (and more businesses nearby will make neighborhoods even more walkable) Rental income for property owners More disposable income due to lower car expenses (more walking = less driving)
Equity:
More variety of in-town housing = more people can afford to live here
Dimensional Averaging
Medium term: Consider parking permits and parking requirement reductions, with provisions for snow emergency parking See memo to Parking Committee Proposed standards based on traditional neighborhood design and assessment of existing conditions, e.g lot size proposal based on existing lots in URC: 70% percent of properties have lot sizes of 3,750 and above.
Lot size proposal based on existing lots in URB: 50% percent of existing 2-family properties have lot sizes of 4,400 and above
Lot Size based on existing lots in URA: 76% percent of existing 1-family properties have lot sizes of 10,000 sq. ft. and above.
Questions?
Thank you for giving us the opportunity to serve our community!
Sincerely, The Zoning Revisions Committee: Dennis Bidwell Stephen Gilson Danielle McKahn Peter McLean Jim Nash Bob Reckman Dillon Sussman Tom Weiner