You are on page 1of 119

SYSTEM OF WORKING

means the system adopted for the time


being for the working of trains on any
portion of a railway.

faizan nazir
For safe running of trains,
different methods are adopted
to control the train movement
between two given points, say
between two stations, mainly to
ensure that not more than one
train is permitted in to the
block section at a time.

faizan nazir
. In
Indian Railways, six systems of train
working are adopted and they are:

(a) The Absolute Block System


(b) The Automatic Block System
(c) The Following Trains System
(d) The Pilot Guard System
(e) The Train Staff and Ticket System
(f) The One Train Only System

faizan nazir
The
Automatic
Block
System

faizan nazir
What is Automatic Block?
What is the difference between automatic and absolute
system?
Where it is required ?
Why it is required?
What are the requirements ?
What are the essentials?
How it is operated?
What is the role of signaling department ?

faizan nazir
What is Automatic Block?

Space intervals are secured automatically by the use


of Track Circuits or Axle Counters

faizan nazir
What is the difference between automatic and absolute
system?

1)The main difference between absolute block and


automatic block is that in the latter, space intervals
are secured automatically by the use of Track
Circuits or Axle Counters while in the former by
human agencies in the form of 2 Station Masters
located at the ends of a block section.

faizan nazir
2) Normal aspect on signal post

Absolute Automatic

faizan nazir
3) ‘A’ marker board is provided on
signal post

Automatic

Absolute

faizan nazir
4)Semi auto signal post now working as
automatic signal

faizan nazir
4)
Semi auto signal post now working as
manual signal

faizan nazir
Where it is required ?
Section where train frequencies are more.
Examples
1) Mumbai suburban ( from Mumbai CST to Kalyan)
2) Chennai suburban
3) Calcutta

faizan nazir
Why it is required?
To improve the integrity of safe traffic without time
delay.

faizan nazir
What are the requirements ?
1) Continuous track circuit or axle counter
( means to prove the presence of train on track)

2) Three aspect signaling or four aspect signaling.

faizan nazir
The essentials of automatic block system are –

1)The line shall be provided with Continuous Track Circuits or


Axle Counters.

Up

A station B station

Down

faizan nazir
2) The line between two stations may where
required be divided into a series of section known
as "Automatic Block Signalling Section".

Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
3) Entry into each block signalling section is protected by a
colour light Multiple Aspect Stop Signal.

Up

Down

faizan nazir
Up

A station B station

Down

faizan nazir
4)Track Circuits or Axle Counters should controls the
aspects of the Signal such that:

i) It cannot display the `OFF' aspect unless the line is


clear not only up to the next stop signal but also for an
adequate distance beyond it.
{ ‘OFF' aspect can be yellow, double yellow or green. }

ii) The Signal is automatically replaced to `ON' soon after


it is passed by a Train.

faizan nazir
a) Yellow with the minimum clearance of one Block
plus Overlap.

b) Double yellow with minimum clearance of two


Block stations plus Overlap

c) Green with minimum clearance of three Block


stations plus Overlap

faizan nazir
faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
Up

A station B station

Down

faizan nazir
THE END

faizan nazir
Up

A station B station

Down

faizan nazir
faizan nazir
The Automatic Block System

faizan nazir

You might also like