Supervisor: Assoc. Prof. Dr. Rosnah Mohd Yusoff
Introduction
In the workplace today, the second greatest reason
for lost workdays is injuries that are due to
overexertion when performing lifting procedures
(Snook, 1988).
A number of recent studies have indicated that there
is a relationship between occupational tasks involving
frequent bending, as in repetitive lifting tasks, and
increased risk of low back disorders (National
Academy of Sciences, 2001).
Problem Statement
Current method = High level of risks
Substandard design of work system/procedures
The tool used = Still harm
Occurrence of MSD to the workers.
Objective
To study the manhole slab lifting operation.
Develop work procedures for lifting the concrete slab
of manhole cover.
Design tool for lifting the manhole cover.
Musculoskeletal Disorders
Musculoskeletal disorders are injuries or dysfunctions
affecting muscles, bones, nerves, tendons, ligaments,
joints, cartilages, and spinal discs.
Sprains, strains, tears, pain and connective tissue
injuries
Recent Tools
Methodology
STAR
T
Visit
Result Analysis
END
Result and Discussions
Questionnaire Analysis (PLIBEL)
1 2 3 4 5 6 7 8 9
Question
Neck Shoulders Upper Elbows Lower Wrists Hip/Thigh Knees Ankles/Feet
Back Back
Tool or equipment 3 5 4 2 5 3 1 3 2
unsuitable fitted?
Fatigue because of 1 3 3 3 5 1 1
operation most
often?
Ever consult 3 3 5 1 1 1
Paramedic
because of physical
problem?
Ever experiences 3 2 4 2 1 1
Affect your job?
Recent Procedure Analysis
RULA Analysis = Recent
RULA Analysis = Recent
Tool Design
Set the selector switch
Push or pull the
to the “LOWER”
tool
position and release
the PML.
Push or pull
the tool
Pull handle of PML
out and rotate to Set the selector
“ON” position. switch to the
“LOWER”
position and
Set the selector
release away
switch to the neutral
from manhole
position and spools
slab.
the chain freely until
it in stable position.
Pull handle of
PML out and
Set the selector switch
rotate to
to “UP” position and
“OFF”
use the hoist’s handle
position and
to pull or raise the
release the
manhole slab.
manhole to its
origin
position.
RULA Analysis = New Tool
RULA Analysis = New Tool
Comparison of RULA Score
Recent Procedure / Tool Improved Procedure / New Tool
FURTHER
FURTHER
Move the manhole slab cover to 1.T-Hook 1.T-Hook 1.Push or pull the tool to move
another site /origin position Bad Shape Handle T-Shape handle the slab to another site.
Handle made by plastic Rubber handle
Unsuitable Length Adjustable length
Conclusion
The study observed the new tool design can help in
reducing the risk factor among the workers with
providing the lever hoist, permanent magnet lifter
(PML) and tire features on the new tool design.
As the conclusion, the objectives of this project have
been achieved.
Recommendations