Min Thant Maung

Key Points for Learning


(Petroleum Engineering)

Open
Well Completion Fundamentals

Common equipment
• Well objective
• Cost
• Down hole safety valve.
• Ensure the safety of the wells
• Tubing
• Completion/Packer fluid
• Sliding sleeve
• Packer
• Production Casing
• Perforations
• Side Pocket Mandrel.

Open
Methods of Completion

Advantages Disadvantages

Open Hole Completion • Minimize initial expenses • Only thick/homogeneous


• Limited Open Hole damage reservoir can produced.
• Formation needs to be well-
consolidated.
Cased Hole Completion • Selectivity is possible • Necessity of good cement job.
• Completion • Perforation through casing and
unconsolidated reservoirs. cement must be properly
designed.

Various Completion Types Single selective production

Dual production-string completion


Intelligent Completion

Open
Horizontal Wells Completion

Open Hole For short drain

Slotted Liner with external inflatable casing Different zones can be monitored along the
packers horizontal drain

Cemented and perforated liner Good zonal isolation

Open
Perforation

-To penetrate into the formation/create holes in the casing or liner.

Major Efficiencies

• Shot Density
• Penetration into the reservoir

• Packers - annular seals between the tubing and production casing.


• Packer fluid - placed between tubing and production casing above
the packer.

Open
Drill Stem Test

To test the dynamic properties of a reservoir.

Equipment

• Reverse Circulating Sub


• Safety Joint
• Packer
• Perforated tail-pipe
• Pressure recorder.

Open
Thank you for your attention