Professional Documents
Culture Documents
Fieldwork
Discontinuity Surveys
Dr. A. Mamuse
May 2017
• Each group will be allocated a road cutting exposure undertake a discontinuity survey
• Each group should collect and sign for the following equipment:
– 1 Measuring tape
– 1 geological compass
– 1 geological hammer
– 1 GPS unit
– 3 data logging sheets
• Write up: write a geotechnical report (3 pages typed text) of the survey, including:
– Photographs
– Stereographic plots
– Slope stability assessments
– Engineering measures to curb instability
– All other relevant information
– Purpose of discontinuity surveys
– Errors associated with the surveys and how these maybe corrected