HSE Management Meeting

Drilling & Well Servicing Department

Total E&P Yemen


February 2006
12 months Drilling Activity

24-May-06
21-Aug-05

20-Sep-05

21-Nov-05

21-Dec-05

21-Feb-06

23-Mar-06
21-Jan-06

24-Jun-06
21-Oct-05

23-Apr-06

8-May-06

24-Jul-06
5-Sep-05

5-Nov-05

6-Dec-05

9-Aug-06
5-Feb-06

8-Mar-06
6-Jan-06

8-Jun-06
6-Oct-05

8-Apr-06

9-Jul-06
HTC-3
KHA 406 WI
KHA 3-07
Jathma-1
KHA 1-07.G1
Jathma-3
KHA1-14
KHA Bast
KHA Bast
ZPEB 906
Jathma-2
KHA1-11TH
KHA1-13 TH
KHA1-13 UBD
KHA1-11 UBD
KHA Bast
KHA Bast
KHA Bast
NABORS 214
Atuf 8
Atuf 9
Atuf 10
Atuf 11
KHA1-12
KHA1-15
KHA Bast
KHA Bast

2 Rigs performance – January 2006


Past 6 months HSE Actions – Drilling – (1/2)

• Ensured the transition from 1 to 3 Drilling Rigs


 Without increase in core staff personnel (Sanaa Office, HSE site)
 With Multi-Cultural Contractors (Yemeni, Chinese, American)
 With 75% new supervision (12 out of 16 are new to TEPY)
 No LTI…but 1 Fatality due to a road accident.

• Managed to achieve 870 days WO/LTI on HTC-3 rig

• Managed to drill the 2nd water well without LTI


 Due to the urgency to have a 2nd WW it was drilled with a “Delta” rig.
 Extremely poor equipment and incompetent personnel
 Huge effort from TEPY personnel.

3 Rigs performance – January 2006


Past 6 months HSE Actions – Drilling – (2/2)
• Implemented strict measures & procedures for rig moves
• 2 MODUSPEC inspections of HTC-3 rig, 2 of ZPEB 906 Rig
• Lifting gear Color Coding & inspection in hands of DC
• Improved POB control (T-card system).
• Improved HSE inductions (coaching of DC HSE officers).
• Basic HSE training program on HTC-3 rig for HTC personnel.
• Improved Maintenance and inspection records system on HTC-3 rig.
• Installation of dedicated man-riding winch in HTC-3.
• Hired 2 Chinese / English interpreters for ZPEB 906 rig.
• Reclamation of old mud pits, locations restoration, thanks to Civil
Works team (DO/NP).
• Reviewed all personnel training needs to comply with Company
Rules.
• Monthly safety meetings in all rigs with Sana’a DO/F Participation.

4 Rigs performance – January 2006


Past 6 months HSE Actions – Completion & WS
• 100% of Supervision team new to TEPY

• Continue working in Cooper 550 camp…

• Performed MODUSPEC inspection on Cooper 550


Report ongoing

5 Rigs performance – January 2006


HSE Actions for the next 6 months
• Arrival of dedicated OSL scheduled in April.
(Operation Safety Leader, compulsory for a 3 rig operation)

• Achieve to have a Bridging document with ZPEB


(ZPEB HSE Procedures need some improvement)

• Implement an HSE training program on ZPEB 906 rig

• Continue regular rig inspections

• Start implementation of training plan to improve compliance with


CR. All personnel, to follow basic training as identified in the HSE
matrix.

6 Rigs performance – January 2006


End of Presentation

Thank you

7 Rigs performance – January 2006