Professional Documents
Culture Documents
Introduction
Design Methodology
Design Output
Conclusion
1. Introduction
Geometric design of highway can be carried out into various stages; Collecting survey data, Horizontal alignment
design, vertical alignment design & cross-section of road, which combines to give a 3D layout of Corridor.
Survey data is needed to be collected from the site by means of various survey techniques which is further used to
create a detailed terrain model in Infraworks 360/ Civil3D
Horizontal alignment is defined and located in the plan view. It defines the top view of our highway, which includes
three important elements namely; Tangents, Circular Curves & Transition curves.
Vertical alignment is the longitudinal view of the highway displaying the important components; summit curves, valley
curves & the gradient connecting these curves along the levels of the highway.
Highway cross-section shows the details of the roadway such as the number of lanes, width of road and thicknesses of
the layers of the carriageway, Drains and the right of way (ROW) of highway.
Survey and Data Collection
Design criteria
2. DESIGN
Flow chart of the Design Procedure for
METHODOLOGY Infraworks & AutoCAD Civil 3D
Designing Horizontal alignment of highway.
3. Design Output
Typical Cross-section/Assemblies
3D model of corridor in Civil 3d 3D model of corridor in Infraworks 360
• After performing the complete design of
the highway, we can conclude by saying
that these designing tools helped a lot
4. Conclusion in designing and the efficiency of work
has been increased drastically, which
makes the completion of work much
faster
Thank You