You are on page 1of 28

Final year Project

on

Automated feed handling system for


stamping process
At
Chanvim Engineering Industries Pvt. Ltd
Presented By

Mayank Soni
Sagar Kshirsagar
Ankit Jaiswal

8th sem, Mechanical Engg.

23/04/2019
Mentor Faculty 1
Prof. S.R Kulkarni
Chanvim Engineering Industries.
 Established in 1978, "Chanvim Engineering (India) Pvt. Ltd." is
a flagship company of Borana Group of Industries headquater at
Mumbai. CEO of the company is Mr Sanjay Borana . Total number
of employee are more than 1000. Annual turnover is more than
50cr.They are leading manufacturer of aluminum circles, Roll bond
evaporator.

 PRODUCTS: Roll Bond Evaporators, Aluminium Circles,


Aluminium Utensils, Aluminium Sheets, Copper Dryers &
Strainers, Aluminium Copper Joints, Frost Free Evaporators,
Aluminium Press Parts.

 CLIENTS; Godrej, Samsung, LG, Electrolux, Videocon, Rajesh


Cooker . Etc
23/04/2019 www.rknec.edu 2
PRODUCTS

23/04/2019 www.rknec.edu 3
PLANT LAYOUT

Entry

23/04/2019 www.rknec.edu 4
LITERATURE REVIEW

Sr Title Author Name of journal


no•
1 Design and fabrication of Harisha, S. K., Procedia Materials Science, 5,
automatic material handling Biradar, M., Uppar, B. 1540-1549.
system for engraving M/C V. & Kulkarni.
2 Development of Sheet Material Li, Y. R., Niu, Z. W., In Advanced Materials
Stamping Automatic Feeding & Sun, X. P. (2010) Research (Vol. 139, pp. 1915-
. and Pick-Up Device. 1918). Trans Tech Publications.

3 Automation at a stamping Fernando Alejandro 7th WSEAS International


industry Lelo de Larrea de la Conference on Robotics,control &
pena,Muhammad ali Manufacturing Technology
yousuf Hangzhou china April 15-17,2007

23/04/2019 www.rknec.edu 5
PROBLEMS IDENTIFIED

•Improper alignment between work piece to be finished


and die.

•Improper handling system for carrying hot rolled


aluminium sheets.

•Improper work flow and plant layout.

• Manual and inefficient stamping process.

23/04/2019 www.rknec.edu 6
CURRENT INDUSTRY SCENARIO

23/04/2019 www.rknec.edu 7
OBJECTIVES

• To improve the operation cycle time of stamping process.

• To reduce the work force involved for particular


operation.

•To achieve continuous and smooth work cycle.

23/04/2019 www.rknec.edu 8
METHODOLOGY
1. Problem identification
2. Literature review
3. Conceptual design
4. Engineering design
5. CREO modeling & Analysis
6. Procurement of raw materials and costing.
7. Fabrication
8. Testing and validation
9. Rework if required
10. Use of formwork on site
23/04/2019 www.rknec.edu 9
COMPONENTS OF THE
ASSEMBLY
1. BASEPLATE
2. DIEBACK
3. DIE
4. TABLE TOP PART 1
5. TABLE TOP PART 2
6. PUSHERPLATE
7. STACKHOLDER
8. STEP MOTOR
9. COUPLER
10. DISC
11. BALL BEARING

23/04/2019 www.rknec.edu 10
Assembly of components

23/04/2019 www.rknec.edu 11
SELECTION OF STEPPER MOTOR

Outer Diameter of the hollow Disc (Do) = 250 mm


Inner Diameter of the hollow Disc (Di) = 240 mm
Aluminium Disc (Da) = 230 mm
Base plate Diameter (D b.p) = 1000 mm
Thickness of hollow disc (th) = 20 mm
Thickness of Aluminium circle (ta) =4 mm
Diameter of Rod (d) = 20 mm
Motor selected= Nema 17 bipolar.

23/04/2019 www.rknec.edu 18
SELECTION OF LINEAR
ACTUATOR

T = Total linear force


T = Ff + Fa+ Fg +Fp
Ff = Frictional force
Fa= Acceleration Force
Fg= Gravity Force
Fp = Applied Force
n = No. of platesStacked on one table top part 2.
Pneumatic actuator with time delay valve

23/04/2019 www.rknec.edu 19
Action Plan – Phase 2

1. Time study for current stamping process.


2. Costing of final assembly comparing and
selecting linear actuator and stepper motor
3. Procurement of raw materials
4. Fabrication of parts for testing.
5. Testing and validation.
6. Result and analysis.
7. Rework if required.
8. Thesis writing.
23/04/2019 www.rknec.edu 20
Raw materials:
Components Quantity price
Ms plate 40*40 cm 300/-
Wooden block 30*30 cm 400/-
Plywood 20*10 cm 200/- Total cost=
3490/-
8” hexagonal 4 60/-
bolt
3” hexagonal 6 30/-
bolt
Nema 17 1 650/-
Bipolar motor
Arduino Uno 1 450/-
12v adaptor 1 200/-
Jumper wires 10 100/-
Cables for 1 100/-
aurdino
23/04/2019 www.rknec.edu 21

Machining cost - 1000/-


Circuit daigram

23/04/2019 www.rknec.edu 22
During fabrication

Cnc plasma Wooden


cutting component

23/04/2019 www.rknec.edu 23
Final assembly

23/04/2019 www.rknec.edu 24
Cost justification
Conventional Improved technique
technique
Labours involved=3 Cost of whole setup
Salary=10000 pm Approx=40000/-
Total salary=30000pm

As the total setup cost is 40000/-


We can see that cost of this project will be justified within 45
days of installation.

23/04/2019 www.rknec.edu 25
Result and analysis.

Following results were obtained after doing the stop watch


study.
Whole work was divided into work elements and time required
for operation was calculated.

Conventional Improved technique


technique
13 secs 5 secs
Overall reduction in 62%
time=

23/04/2019 www.rknec.edu 26
References
1. Research Article on Design and Development of Stepper Motor Position
Control System, International Journal in Emerging Research in Management
& Technology., vol2, Iss.12
election. Mechanism and Machine Theory, 46(5), 647-661.
2. “Design and fabrication of automatic material handling system for
engraving machine” by International conference on advances in
manufacturing and materials engineering AMME 2014

3. Poole, A. D., & Booker, J. D. (2011). Design methodology and case studies
in actuator selection. Mechanism and Machine Theory, 46(5), 647-661.

4. Engineering Mechanics , S.S Bhavikatti.

23/04/2019 www.rknec.edu 27
THANK YOU

23/04/2019 www.rknec.edu 28