LINES, ELECTRIC / TELEPHONE CABLES ETC BEFORE START OF
EXCAVATION.
EXCAVATED MATERIAL TO BE KEPT AT LEAST 1.5 METERS OR
HALF THE DEPTH OF THE PIT, WHICHEVER IS MORE, AWAY FROM THE EDGE OF THE PITS.
BOULDERS ETC. TO BE STACKED AWAY TO AVOID FALLING
BACK INSIDE THE PIT. STEPPED OR SLOPED EXCAVATION IN SANDY /LOOSE SOIL
LOCATIONS.
THE AREA TO BE FENCED WITH WARNING SIGNS( LUMINOUS IF
NECESSARY) CLOSE TO VILLAGES .
HEAVY MACHINERY TO BE PLACED AWAY FROM THE EDGE OF
THE PITS AND ANCHORED.
VIBRATORS SHOUD BE PLACED ADEQUATELY AWAY FROM
PITS AND ANCHORED.
WHEEL BLOCKS TO BE PROVIDED TO THE CONCRETE MIXERS.
PIT SHOULD BE THOROUGHLY CHECKED DAILY BY AN EXPERIENCED AND COMPETENT PERSON FOR DEVELOPMENT OF CRACKS .
LONE WORKER NOT TO BE ALLOWED TO WORK IN EXCAVATION
AND FOUNDATION AREA.
ALL WORKMEN WORKING INSIDE THE PIT MUST WEAR SAFETY
HELMETS, GUM BOOTS, HAND GLOVES ETC.
SHORING AND SHUTTERING TO PREVENT PIT COLLAPSE,
WHERE NECESSARY.
SLOPE CUTTING TO BE DONE AT COLLAPSING SOILS.
USAGE OF SHALLOW FOUNDATIONS IN COLLAPSING SOILS IF
NECESSARY ( IN CONSULTATION WITH CC/RHQ ENGG.) JACKS ARE TO BE PLACED ON LEVEL GROUND.
SAND BAG TEMPLATE SUPPORTING JACKS ARE TO BE
PLACED EVENLY AND AWAY FROM THE EDGE OF THE PIT.
SUPPORTS TO BE PLACED BELOW THE JACKS FOR EVEN
DISTRIBUTION OF LOAD.
CHECK FOR LEVELS AND DIAGONALS BEFORE CONCRETING
DAILY
DEWATERING PUMP TO BE PLACED ADEQUATELY AWAY AND
ANCHORED. LADDERS ARE TO BE POSITIONED PROPERLY.
USAGE OF STEEL LADDERS WITH ADEQUATE LENGTH FOR
EASY MOVEMENT OF WORKMEN IN AND OUT OF THE PIT.
LADDERS ARE TO EXTEND AT LEAST ONE METRE ABOVE
GROUND LEVEL.
WORKMEN WORKING ABOVE PROTRUDING
REINFORCEMENT BARS SHOULD PROTECT THEMSELVES.
FIRST- AID BOX SHOULD BE AVAILABLE AT SITE.
AVOID TIME DELAY BETWEEN EXCAVATION AND
FOUNDATION ACTIVITIES. SUFFICIENT AREA FOR FREE MOVEMENT OF MEN AND MATERIAL.
ERECTION GANG SHOULD HAVE SUFFICIENT SKILL AND
EXPERIENCE FOR THE JOB.
COMPETENT AND EXPERIENCED SUPERVISORS/GANG LEADERS
SHOUD BE AVAILABLE WITH EACH GANG .
DERRICKS AND OTHER LOAD BEARING T & P S MUST BE OF
GOOD QUALITY, OF SUFFICIENT CAPACITY FOR THE JOB.
T&P SHALL BE TESTED AND HAVE PROPER TEST CERTIFICATES.
FOUNDATION TO BE PROPERLY BACK FILLED AND COMPACTED.
REVETMENT WORKS SHOULD BE COMPLETED IN ALL ASPECTS
BEFORE START OF STRINGING. EARTHING OF TOWER MUST BEFORE STARTING STRG. ACTIVITY.
DERRICKS ARE TO BE PROVIDED WITH THREE GUY
ROPES(AND NOT TWO AS IS BEING FOLLOWED).
T & P’s AND PPE’s ARE TO BE THOROUGHLY CHECKED FOR
THEIR HEALTHINESS DAILY BEFORE USE.
ALL PPES SHOULD BE AVAILABLE AT SITE AND CHECKED
FOR THEIR CONDITION DAILY.
ALL SUPERVISORS/WORKMEN AT ERECTION SITE MUST
ALWAYS WEAR SAFETY HELMETS. SAFETY BELTS TO BE WORN PROPERLY.
ALL SAFETY EQUIPMENT MUST BE CE / ISI MARKED.
ASCENDING ON AND DECENDING FROM THE TOWER SHOULD BE
THROUGH STEP BOLTS ONLY.
WORKMEN HAVING ANY INJURY MUST NOT BE ALLOWED TO
WORK ON TOWER.
TOWERS ARE TO BE ERECTED IN A SEQUENTIAL MANNER.
ONLY ONE MAIN LEG SECTION SHOULD BE ERECTED AT A TIME.
GUYS ARE TO BE ANCHORED TO A STRONG ANCHORAGE POINT.
ONE ANCHORAGE POINT MUST NOT SUPPORT MORE THAN ONE
GUY. MAXIMUM ANGLE FOR THE GUY ROPE IS 450.
MAIN LEG MEMBERS ARE TO BE LIFTED ALONG WITH STEP
BOLTS, FULLY TIGHTENED ( WHERE APPLICABLE ).
ALL NUTS SHALL BE HAND TIGHTENED FULLY BEFORE BEING
HOISTED, DURING ERECTION .
ASCENDING ON AND DESCENDING FROM THE TOWER SHOULD
BE THROUGH STEP BOLTS ONLY.
HEAVY SECTIONS SHOULD PREFERABLY BE LIFTED WITH THE
HELP OF TRACTORS.
PRIOR TO ERECTION OF UPPER SECTION , TOWER SECTION
SHALL BE COMPLETELY BRACED. PRIOR INFORMATION ABOUT HOSPITAL / DOCTORS IN THE VICINITY SHALL BE AVAILABLE WITH SITE SUPERVISORS.
ALL SITE ENGINEERS/ SUPERVISORS/ GANG
INCHARGES SHALL BE PROVIDED WITH MOBILE PHONES, FOR ANY EXIGENCY. ALL PLAN DIOGONALS OF RELEVANT SECTION SHALL BE IN PLACE PRIOR TO ASSEMBLY OF UPPER SECTION .
SUPPORT OF A STRONG ANCHORAGE POINT TO PREVENT
SLIPPAGE DURING MANUAL LIFTING.
WORK SHOULD NOT BE CONTINUED UNDER INCLEMENT
WEATHER CONDITIONS.
PROTECT WIRE ROPE / PP ROPE WRAPPED AROUND
TOWER MEMBERS BY USING GUNNY BAGS.
IN THEFT PRONE AREAS TACK-WELDING OF B/N TO BE
TAKEN UP IMMEDIATELY AFTER ERECTION SRAINING OF MEMBERS SHOULD NOT BE ALLOWED.
HAMMERING OF BOLTS MUST BE AVOIDED – REF. FDN
LEVELS & DIAGONALS
FIRST-AID BOX SHOULD BE AVAILABLE AT SITE.
AT LEAST TWO MEMBERS OF EACH GANG MUST HAVE
BEEN TRAINED IN FIRST-AID.
ONE VEHICLE SHOULD BE AVAILABLE AT EACH SITE
FOR ANY EMERGENCY. CHECK FOR COMPLETION OF ERECTION AND TIGHTENING & PUNCHING OF BOLTS NUTS OF TOWERS.
ANY OTHER POINTS – Revetment, Earthing etc.
SUFFICIENT AREA FOR FREE MOVEMENT OF MEN AND
MATERIAL.
STRINGING GANG SHOULD HAVE SUFFICIENT NO. OF SKILLED
AND EXPERIENCED MANPOWER FOR THE JOB.
EACH GANG SHALL BE HEADED BY COMPETENT AND
EXPERIENCED ENGINEERS / SUPERVISORS .
TSE AND ALL OTHER LOAD BEARING T & PS MUST BE OF GOOD
QUALITY, OF SUFFICIENT CAPACITY FOR THE JOB, TESTED AND HAVE PROPER TEST CERTIFICATES. T & P’s ARE TO BE THOROUGHLY CHECKED FOR THEIR HEALTHINESS DAILY BEFORE USE.
ALL SUPERVISORS/WORKMEN AT ERECTION SITE MUST ALWAYS
WEAR SAFETY HELMETS.
WORKMEN WORKING ON TOWER ARE TO ALWAYS USE SAFETY
BELTS.
SAFETY BELTS TO BE WORN PROPERLY.
ALL SAFETY EQUIPMENTS MUST BE CE / ISI MARKED.
WORKMEN HAVING ANY INJURY NOT TO WORK ON THE TOWER.
TENSIONER AND PULLER MUST BE PROPERLY ANCHORED AND EARTHED.
RELIABLE AND EFFICIENT COMMUNICATION ARRANGEMENT.
STRINGING SHOULD NOT BE TAKEN UP IF COMMUNICATION
EQPT. IS NOT AVAILABLE/NOT WORKING AT SITE.
SAFE LOADING / UNLOADING OF CONDUCTOR / EARTH-WIRE
DRUMS AT SITE USING CRANES.
PROPER POSITIONING OF CONDUCTOR DRUMS.
RUNNING BLOCK (EARTH) TO BE PROVIDED FOR BOTH
CONDUCTOR AND EARTHWIRE DURING PAYING OUT.
EARTHING OF TOWERS IN THE SECTION TO BE COMPLETED
BEFORE TAKING UP STRINGING. FOR STRINGING ON ONE SIDE OF THE SECTION PROPER GUYING AND BACK-STAY TO BE PROVIDED.
GUYING AND BACK-STAYING OF ALL TENSION TOWERS.
GUYING AND BACK-STAYING IS TO BE DONE BY 16 MM DIA. STEEL
WIRE ROPE ONLY WITH ANCHORING ADEQUATELY AWAY FROM TOWER – 45 Deg.
IF GUYING AND BACK-STAYING IS TO BE LEFT FOR A LONG
DURATION, THE ANCHORING AREA IS TO BE FENCED AND WATCHMAN TO BE POSTED.
GUYING AND BACK-STAYING SHALL BE PROVIDED FOR IS FOR
OF D –TYPE TOWERS ALSO. GUYING AND BACK-STAYING - PROVISION FOR ADJUSTMENT OF TENSION OF THE GUY WIRES USING TURN BUCKLES ETC.
GUYING AND BACK-STAYING - TO BE CHECKED PERIODICALLY.
AS FAR AS PRACTICABLE, SOME JUMPERS ARE TO BE LEFT
DISCONNECTED.
SEQUENCE OF PAYING OUT SHOULD BE FROM TOP TO DOWN
FOR D/C LINES.
FOR S/C TOWERS INNER PHASE SHALL BE STRUNG BEFORE
TAKING UP OUTER PHASES. NO WORK SHOULD BE CONTINUED IF THUNDER STORM IS EXPECTED.
PROTECT WIRE ROPE / PP ROPE WRAPPED AROUND
TOWER MEMBERS USING GUNNY BAGS ETC.
CONDUCTORS SHOULD NOT BE LEFT IN SUCH A POSITION
THAT IT MAY CAUSE DANGER TO GENERAL PUBLIC.
RANDOM INSPECTION OF HARDWARE FITTINGS.
EXTRA PRECAUTIONS WHILE SAGGING SHORT SPANS/ SINGLE SPAN REACHES.
LOCAL VILLAGERS, ESPECIALLY CHILDREN SHOULD BE
FORE-WARNED.
DURING FINAL SAGGING AFTER THE LOAD IS TRANSFERRED
TO THE TOWER, SUFFICIENT TIME MUST BE ALLOWED FOR THE LOAD TO BE STABILISE.
FOR CROSSING ANY EXISTING CHARGED LINE, SHUT DOWN
AND PTW FOR THE EXISTING LINE MUST BE TAKEN.IT SHALL BE ENSURED THAT THE LINE IS EARTHED AT BOTH SUB- STAIONS AND LOCALLY AT SITE. SAFETY ASPECTS TO BE FOLLOWED WHILE STRINGING RAILWAY CROSSINGS EHT LINE CROSSINGS
ALL THE INSULATOR STRINGS SHOULD BE
THOROUGHLY CHECKED BEFORE LIFTING.
FOR WORKING ON THE CONDUCTOR OR
INSULATOR STRING, SAFETY BELTS WITH TWIN- LANYARDS TO BE USED. 1. ADDITIONAL PRECAUTIONS FOR STRINGING IN THE VICINITY OF CHARGED OVERHEAD LINES AND IN AREAS WHERE INDUCED VOLTAGE IS ANTICIPATED
ALL WINCHES, PULLEYS AND TSE MUST BE PROPERLY
EARTHED.
CONDUCTOR RUNNING BLOCKS ARE TO BE EARTHED.
ALL THE CONDUCTORS AT BOTH ENDS OF THE SECTION
ARE TO BE EARTHED THROUGH RUNNING EARTHS.
SCAFFOLDS ARE TO BE STRONG ENOUGH, SHOULD BE
ADEQUATELY EARTHED, PROVIDED WITH ANTI-CLIMBING DEVICES AND WARNING SIGNS.
SUFFICIENT CLEARANCE MUST BE MAINTAINED FROM
EXISTING CHARGED LINES AFTER ROUGH SAG . PROVISION FOR BRAKING OF PAYING OUT OF CONDUCTOR AT ANY POINT.
EARTH WIRE SHOULD BE EARTHED BEFORE EARTH BOND IS
FITTED.
NYLON OR PP ROPES SHOULD BE USED FOR HAULING /
CONTROLLING SPACERING CYCLE. 2.- PRECAUTIONS WHILE CROSSING LT LINES NETWORK OF THE LT LINES IN THE VICINITY IS TO BE THOROUGHLY CHECKED AND ADEQUATE PRECAUTIONARY MEASURES TAKEN.
IT SHALL BE ENSURED THAT THERE IS NO BACK FEED ON
THE LINE UNDER PTW.
FOR CROSSING THE LT LINES, SHUT DOWN AND PTW FOR
THE LT LINE.
ONLY TAKING OF SHUT DOWN AND PTW WILL NOT BE
SUFFICIENT. THE POINT(S) OF ISOLATION OF THE LT LINE MUST BE PROPERLY PROTECTED BY MANNING.
THE POINT(S) OF ISOLATION MUST BE KEPT UNDER LOCK AND
KEY.
BOTH SIDES OF THE WORKING AREA MUST BE PROTECTED BY
PROVIDING WITH TEMPORARY EARTHS.
PROPER QUALITY OF DISCHARGE RODS ARE TO BE USED.
DISCHARGE RODS TO BE FIXED PROPERLY.
EARTH END AND CONDUCTOR END TO HAVE SOLID CONTACTS.
HANGING THE HOOK OF THE DISCHARGE ROD LOOSELY ON THE
CONDUCTOR NOT TO BE ALLOWED. DISCHARGE RODS TO REMAIN CONNECTED TO THE LT LINE UNTIL ALL MEN AND MATERIAL ARE REMOVED.
NO ONE TO TOUCH THE LT LINE AFTER THE DISCHARGE RODS
HAVE BEEN REMOVED, EVEN IF THE LT LINE IS UNDER SHUT OWN.
DISCHARGE RODS TO CONFORM TO THE RELEVANT IEC
STANDARDS.
ELECTRICAL RESISTANCE HAND GLOVES TO BE PROVIDED
AND USED.
LT LINES TO BE CROSSED AND ON WHICH SHUT DOWN NEED
TO BE AVAILED, SHOULD BE SHORT CIRCUITED AND EARTHED AT BOTH SIDES OF THE AREA OF WORK IMMEDIATELY AFTER TAKING THE SHUT DOWN.