2018
Primary and Secondary Crushing
Reduction Plant

Feed
bin

Apron Feeder
Jaw Crusher

CVB 2 Double deck


Screen, 28mm CVB 8 +50mm hand sorting pad
50mm
Stock Primary
pile screen
CVB 9

Symons
Crusher

Cone crucher

Secondary
ROMore is Fed into the Primry section where ,fed is Screen 28mm

reduced to -100mm size .The ore is furthure reduced


to -28mm size fraction in the secondry crushing
circuit
Bin

Stockpile dms feed Stock pile


Dense Medium Separation Section
Ore+Fe3O4
Dilute Fe3O4

Process Dicharge
Fe3O4
Feed Preparation
Screen

Wing-Tank

S/Magnet P/Magnet

CY1 CY2
CY1

Fines Stockpile

Float Screen Sink Screen

Floats stockpile Sink


product
stock pile

Demagnetising coil

Tailings
Dilute Densifying Dilute Sump
sump sump Cyclone
Sump

3/2 3/2 6/4 4/3


Spillage
Sump 3/2 3/2

Tailings to thickener

3/2

Dense Medium Separator 1 ,processes the cser fraction of (-)28m to +6mm from the reduction section.Average feed
rate is 100tph .Recovers the target lithium bearing minerals (Petalite and Spodumene) by separating from the
unwanted minerals through exploiting differences in SG.
Dense Medium
Cyclones

Desliming
Cyclones

Float
Product

Sink Product

Ore
FeSi + Ore
FeSi
Water
Circuit discharge
Feed
Dry Grinding Plant 1
bin

Water
pond

Loesche dryer
mill

oil

Heat Gas burner


exchanger

water gas from gas plant


fan

Bag filter
chamber

cyclone

1 2 5
Drum
magnet
3 4

Rotex screen
Magnetics

1 2
Feed
hoppers

bag
Final Product
3 4
Dry Grinding Plant 2

Feed
bin

Water
pond

dryer
Loesche
mill

Gas
burner
oil Heat
exchanger

Gas from gas


plant dust

fa
n

Bag filter
chamber
Bin

bin

cyclone

Rotex screen

undersize oversize

Feed
hoppers Product Bag
Tantalite Processing Plant
VSI

30m³ Water 43m³


41.32m³ SPRAY
SCRUBBER SLURRY WATER

FEED BIN

1MM P/SCREEN
30TPH

84.32m³
3/2
l

CLEANERS
P/ROUGHERS
SCAVENGERS

0.8MM S-
SCREEN

S/ROUGHERS

FLOAT OVERFLOW

Sump Sump Sump


o/f
CLEANER RECYCLE TAILS

30tph O/F WATER

12tph 45Kpa

3/2 3/2 3/2

STACKING CYCLONE

Flotation Tails
u/f
RFT SFT 18tph

THICKENER
FLOTATION CELL

1½-1
4/3 Lepidolite Concentrate U/F 50% SOLIDS

RCT SCT

TAILINGS TO TAILS DAM

1½-1

(-)28mm lepidolite rich feed is fed into the crushing circuit of the ta plant at a target feed rate of 10tph.-850micron feed
size rate is pumped into the concentrating spirals and ultimately shaking tables.A Tanatlite concentrate of target 25% is
recovered from the shacking tables