Professional Documents
Culture Documents
VRV III
Product Selection
Piping selection
Selection Considerations
• Cooling Load calculations • Noise Levels
• Heating Load calculations • Pipe Runs
• Internal and Ambient temp • Unit Dimensions
• Building layout drawings
• Aesthetics
• Orientation
• Planning Restrictions
• Room Usage
• Possible future site expansion
• Fresh Air Requirements
• Air and temperature distribution
Cooling only Heat pump Heat recovery Maximal connectable Mininum Maximum
FXCQ
Based on High Fan Speed
Correction factors to calculate the unit 's capacity at low fan tap.
N
Room A
8.0kw Sensible Cooling 6m
3m 3m
Room E Room D
3m 1.65 kw 2.5 kw
Sensible Sensible Room C Room B
2.1 kw 4.2 kw Sensible 6m
Sensible
Room A - General Office
Room B - Meeting Room
Room C - Manager
Room D - Small office
Room E - Reception 3m 6m
Rooms A, B and E 400mm ceiling void
Internal design 23 deg C db Room C 200 mm ceiling void
16 deg C wb Room D no void (restricted floor space)
Ambient design 29 deg C db Ceiling Height 2.7m
Possible Solution
Note:
The low speed duties were calculated based on the correction factors shown in
the previous table.
Daikin Europe, Consulting sales section
Da ik in E u r o p e Ac a d e m y
Learning, our way
• Positioning
• Noise levels
Room A
6m
Room E Room D
3m FXAQ40M Room B
FXSQ32M Room C
6m
FXLQ40M FXSQ80M
Required Corrected
Sensible
Total Sensible
Room A = 3 x FXFQ40M 8.0 kW High Speed 9,66kW 8,04kW
Table RXYQ10P
18 m
Room A
6m
Room E Room D
3m FXAQ40M Room B
FXSQ32M Room C
6m
FXLQ40M FXSQ80M
30 0.95
0.98
20
1.0
10
20
0.98
30
If selected fan coil unit corrected duty is too low, then that unit has
to be re-selected and the complete procedure repeated
Room A
Room E
Room D
FXLQ40M FXSQ80M
Meeting Room
Daikin Europe, Consulting sales section
Da ik in E u r o p e Ac a d e m y
Learning, our way
Room E
Room D
Selection by
VRV Express
VRV Express
VRV Express
VRV Express
VRV Express
VRV Express
VRV Express
Indoor unit details
Rq Tmp Rq Av Soun MC Wg
Name Model Tmp C Av TC Rq SC Av SC Airflow WxHxD
TC H HC HC d A ht
°C kW kW kW kW °C kW kW l/s dBA A mm kg
First Floor - Room 101 FXFQ50M 22.0 4.0 4.9 3.5 3.8 21.0 2.0 4.5 183-267 27-32 0.3 840x246x840 24
First Floor - Room 102 FXFQ50M 22.0 4.0 4.9 3.5 3.8 21.0 2.0 4.5 183-267 27-32 0.3 840x246x840 24
First Floor - Room 103 FXFQ80M 22.0 5.5 7.8 4.9 5.5 21.0 3.2 7.1 250-333 31-36 0.5 840x246x840 25
First Floor - Room 104 FXFQ80M 22.0 5.5 7.8 4.9 5.5 21.0 3.2 7.1 250-333 31-36 0.5 840x246x840 25
First Floor - Room 105 FXSQ80M 22.0 5.5 7.8 4.9 6.2 21.0 3.2 7.1 358-450 37-43 1.4 1400x300x800 51
First Floor - Room 106 FXSQ40M 22.0 3.0 3.9 2.5 2.9 21.0 2.0 3.5 150-192 32-38 0.6 700x300x800 30
Second Floor - Room 201 FXSQ40M 22.0 3.0 3.7 2.5 2.8 21.0 2.0 3.6 150-192 32-38 0.6 700x300x800 30
Second Floor - Room 203 FXSQ80M 22.0 6.0 7.5 5.2 6.0 21.0 4.5 7.2 358-450 37-43 1.4 1400x300x800 51
Second Floor -Room 204 FXSQ80M 22.0 6.0 7.5 5.2 6.0 21.0 4.5 7.2 358-450 37-43 1.4 1400x300x800 51
Second Floor - Room 205 FXAQ40M 22.0 3.0 3.7 2.5 2.9 21.0 1.8 3.6 150-200 34-39 0.4 1050x290x230 14
NEVER install
Daikin Europe,aConsulting
joint after a section
sales header !
Da ik in E u r o p e Ac a d e m y
Learning, our way
…..Horizontally
+ 30°
Possibly
prototypes
match pipe and refnet
using adaptors
A
For level differences
above 50m; 40M 15M
• One size up of
main liquid pipe
• Option kit
90M 165M
•Total piping length = 1000M
190M
•No Oil traps
Max
EQUIVALENT
•No Liquid traps
LENGTH
•No Solenoid valves
•No Sight glasses
•No Driers
•No Additional oil
•Max pressure test 38.5 bar
Can be
RXYQ…P 4. For the total piping calculation the actual length of b, c, d, e
is counted double
40m
165m
a
b c d e
90m NEVER
j k INSTALL A
f g h l n JOINT AFTER
A HEADER
15m
FXLQ….M FXLQ….M FXLQ….M
REYQ….M
150m
40M
50m
BSVQ. .M BSVQ. .M BSVQ. .M BSVQ. .M BSVQ. .M BSVQ. .M
BSVQ. .M
Please note: all the above connections are flared other than the gas pipe connection on
the 200 an 250 models beingDaikin Europe,
brazed style Consulting sales section
Da ik in E u r o p e Ac a d e m y
Learning, our way
RX(Y)Q5P7
To indoor
units
= Liquid Line
= Gas Line
Daikin Europe, Consulting sales section
Da ik in E u r o p e Ac a d e m y
Learning, our way
To indoor
units
Pipe limitations
between modules forming a Condensing unit
A
B
32 40 25 80
40 40 2 2 2
R S T
15m
40 40 40