You are on page 1of 18

SUMMER TRAINING REPORT ON

Renewal of ODR
● PRESENTED BY
NISHAN SINGH
B.TECH CIVIL 7TH SEM
1503500019
Trainee period
●26 june 2018 to 29 july 2018
□ Training under
engg.
◇ Ex. en. D.P.
SINGH
-8057994684
○ A.E. S. K. GUPTA
P.W.D
.
-9411016958
○ J.E. S. K. SHARMA
 CONTENT











 Public work department (PWD) , under the ministry
of state government , is the pioneer in
construction area in over country
 The PWD conducts the construction ,
improvements, strengthening and , maintenance
of road and bridges .
 Mr. KESHAV PRASAD MAURYA is the current PWD
minister Uttar Pradesh .
 INTRODUCTION







 THE STATUS OF ROAD NETWORK IN INDIA IS DESCRIBED BELOW :
Types of Road Length (IN kms)
EXPRESSWAYS 1208
NATIONAL HIGHWAYS 101011
STATE HIGHWAYS 176166
DISTRICT ROADS 561940
OTHER DISTRICT ROAD 4762968
TOTAL LENGTH OF ROAD 5603293
 ASPHALT CONCRETE

UNITED KINGDOM REPUBLIC


OF IRELAND COMPOSITE MATERIAL
ROADS PARKING LOTS AIRPORTS
EMBANKMENT DAMS
 MINERAL AGGREGATE BOUND ASPHALT

EDWARD DE SMEDT


 COMPOSITION OF BITUMINOUS CONCRETE
● At site we found the composition of B.C. as :

● Aggregate @size 6mm


33%
● Aggregate @size 10mm
33%

● Brick dust ● Hot Bitumen VG-30


34% Approx. 4-6.5% of total
composite as per design
 Grade of Bitumen
 DRUM MIX PLANT
 B.C. TEMPERATURE TEST
 Tracking Temperature is key to successful
Asphalt paving

  In the test of temperature we got the bituminous


concrete up to 134°C which in alright .
BITUMEN EXTRACTION TEST
 THE BITUMINOUS MATERIAL SHALL BE ASPHALT CEMENT, MEETING AASHTO M20
SPECIFICATION WITH 85/100 PENETRATIONS. MIXTURE PROPORTIONS: ASPHALT CEMENT.
THE PERCENTAGE OF BITUMINOUS MATERIAL, BY WEIGHT, SHALL BE WITHIN THE RANGE OF
5.0 TO 8.0 PERCENT .

 In the Bitumen Extraction test , we got


5.3 % Bitumen content .
 BITUMEN CONTENT CALCULATION

518 GM
497 GM
2 GM

518 – (490 + 2)
Percentage of binder in the total mix = ---------------------- x 100
. 490

Bitumen Content = 5.306%


 THICKNESS TEST

 25 MM

 CONSTRUCTION SITE


 CONSTRUCTION SITE

 ● B.C. Layer
thickness
: 25mm
 TRAINING ASSESSMENT

You might also like