BAYAH CEMENT PLANT LINE #2

SUMMARY PROGRESS
A u g u s t , 0 1 st ~ 0 6 th, 2 0 1 8
DRAWING STATUS 08.08.2018 ~ 13.08.2018
F73B-BAYAH 10000 TPD CEMENT PLANT PHASE II WITH 2X15MW WASTE HEAT POWER GENERATOR

Revision and APPROVED Total Drawing


SN Dept code Dept. name Total resending Have Been
needed Approved Information Received
Approved
as noted only

1,049 15 47 187 1 250

I General Lay out 0 0 0 0 0 -


II Main Process Department 747 13 34 98 0 145
III Ventilation And Dynamical Department,Fuel Handling System 26 0 0 0 0 -
IV Water Treatment And Sewerage 54 0 8 31 0 39
V Waste Heat Power Generation 209 0 4 24 0 28
VI Auxiliary Production Workshop 8 2 1 10 1 14
VII Others 4 0 0 24 0 24

TOTAL DRAWING 1,049 15 47 187 1 250


VIII

TOTAL PERCENTAGE (%) 100% 1.4% 22.4% 23.83%


IX
Reduce running noise of OLBC
PROBLEM ACTION PLAN PROGRESS PIC REMARKS

1. Cover steel roller survace DK3M proposal:


1. Receive proposal
with rubber ( need 279736.3 Purchase and 1. 6 months trial
from DK3, review and
cm2 to cover 92 carrier dan Project team 2. workmanship warranty 1 year
waiting quotation
return rollers) 3. noise reduction - 8 %

1. Catroller had site visit on Friday,


2. Waiting proposal August 3
Reduce noise on 2. Replace steel roller with and quotation from Purchase and 2. Catroller will be submit quotation on
OLBC near plastic roller type ( 72 carrier
Catroller and Rollent Project team August 19 2018 (Technical and
community rollers and 20 return rollers)
Indonesia Commercial Cost)

1. Rollent Indonesia had site visit on


Friday, August 10 2018
3. Replace steel roller with
2. Waiting proposal 2. Rollent Indonesia already check on
plastic roller type ( 72 carrier Purchase and
and quotation Rollent site and will be submit quotation on
rollers and 20 return rollers) Project team
Indonesia August 19 2018 (Technical and
HMDPE Roller
Commercial Cost)
Reduce running noise of OLBC

HMDPE ROLLER TYPE


INFORMATION
Sub-Supplier
No. Item List Line #2Suppliers
China Brand Status Remarks feedback 3

Need details about how the compartment


isolation would be achieved. Please send
11 Bag house of coal mill Zhejiang Jiehua For Approval
drawing and isolating functiom
explanation to CG.

please make sure all the spare parts can


be common used at both line. Like
support roller, bushing, bearing housing,
12 Kiln Sinoma For Approval
girth gear, pinion gear, driving
gearbox…and so on. Under this
precondition can be approved.

13 Cooler Fans Jiangsu Jintongling For Approval Approved


Pan Conveyor from line 1 to
14 Sinoma For Approval Approved
line 2
15 Kiln dust feeding system Hanzhou Qiaoxing For Approval sub-supplier of BAYAH Phase 1 Approved
1. Reply of motor:We can accept WEG for all normal LV motors. But for MV motors under 1500 kW we can accept WEG only in Waste Heat Recovery Project
(instead of TECO).
Note:
However actually in the 1st line Bayah Power Plant we have no issue with TECO MW motors. In Bayah Cement Plant Line-2, we prefer to use the same MV motor
like Bayah Cement Plant Line-1 (to use ABB / Siemens).
Activity

Gantry Crane test run Foundation for bending roller machine Foundation for extention support of l
cable rail