VIDYA BHAWAN POLYTECHNIC COLLEGE, UDAIPUR (RAJ.

)
BOARD OF TECHNICAL EDUCATION RAJASHTHAN, JODHPUR

A PRESENTATION OF TRAINING
AT
UDAIPUR BYPASS SIX LANE GREENFIELD PROJECT
(DEBARI TO KAYA) (RAJ.)
FROM 3RD JUNE TO 4th JULY, 2018
Submitted To: Submitted By:
(Mrs. MANISHA SHARMA) HARSHVARDHAN,
AKSHAY,
ARUN
UDAIPUR BYPASS SIX LANE GREENFIELD PROJECT
 TOTAL COST OF PROJECT - 891cr.
 TOTAL LENGTH OF ROAD - 23.883Km
 TOTAL LENTH OF SERVICE ROAD - 12.5Km
 2 ROB (RAIL OVER BRIDGE)
 NH76 - NH8 ( 2 INTERSECTION DEBARI TO KAYA)
 2 INTERCHANGE ( DEBARI AND KAYA)
 MAJOR BRIDGE - 3
 MINOR BRIDGE - 10
 UNDERPASS - 12
 VUP (VEHICLE UNDERPASS) - 2
OVERPASS - 1
BOX CULVERT - 30
Railway Over Bridge
1. MAJOR BRIDGE

 TOTAL LENGTH - 1083m

 TOTAL NO. OF PIER - 70

 TOTAL NO. OF PIER IN ABUTMENT - 4

 RMC PLANT - CP30

 CAMBER - 2%
CHAINAGE 8+150
RMC PLANT CP30
RAFT FOUNDATION
CONCRETING IN PIER SHAFT OR PIER
CURING OF PIER SHAFT
CONCRETING IN PIER CAP
PEDESTAL
Casting Yard (on Site)
Concrete girders
plays very important
role in a bridge ,
These mainly gives
support to deck .
These are the part of
Superstructure.

Concrete Girder
Length – 29.250 M
Reinforcement for
Girder
I section bar like
structures are made
of reinforcement.
There are 171
Sections in one
Girder .
Dia of steel bars : -
Upper and lower
rings are made of
10 mm .
And to join both
rings 12 mm bar is
used ,
12 mm bars are
used in Web .
16 mm binders
are
used .
Reinforcement
Spacing : -
On the both sides of
a girder up to 2400
mm,spacing is
designed 100mm
between two I
sections and after
2400 mm the
spacing between
two I sections is
designed 200 mm ..
40 mm
Covers
are
used
and of
M35.
H T Cables
High tension
cables are main
part of a girder
as they bears
load and make
girder more
strength .
Diameter of ht
cables is 12.7
mm .
PRE-TENSIONING
GIRDERS : -
In this process profiling of
high tension cables is done
and then load is given to
cables according to design,
Now concrete casting is
done and during this
period cables are in
tension load
After 7 days of casting we
will release loads .
Note- if we do not get the
desired compressive
strength (50mpa) then we
will release load in 3 days .
FINISHING OF FORMWORK
Casting of
Girder
After completing work of
reinforcement and
formwork ,
Now the time comes to
do concreting of the
desired girder
Casting of girder is done
with the help of boom
placer which works on
hydraulic pressure .
Compaction
We are
using
Needle
vibrator.
Details of A Girder
DOC :-
Date of
Casting .
Sprinkle and
Membrane type of
curing is done for 14
days from DOC ,
these details also
give info. for
checking strength
and launching.
DIAPHRAGM OF GIRDER
Perpendicular
steel is for
joining two
girders in
parallel and
this is known
as diaphragm
Reinforcement
is of 8mm .
SHIFTING AND TRANSPORTATION
BEARING USED IN GIRDER
LAUNCHING OF GIRDER
PLANK
It is the
surface of a
bridge,and is
one structural
element of the
superstructure
of a bridge.
The deck used
here in
construction is
of
steel and
concrete.
Reinforcement :-
10,12, mm
Depth - 190 mm
Length- 2460mm
Breadth- 2100 mm
Longitudnal bar – 12 mm
Transverse Bar- 10 mm
There are total 48 rings
in a plank .
CASTING OF PLANK
Grade of
Plank
is M-50 .
During
casting its
Slump is
120 mm
.
Culvert
Layout of Wing Wall
Culvert

Weep Hole
90 mm,1m spacing staggered
Given to retain soilfill
Culvert
Laying of bars
Lab
Daily Progress Report
To ensure quality assurance a daily
progress report is made.
Lab
Admixtures
MRA for curing
Lab
MDD
19 mm sieve
3 Kg mass : 2.5 kg rammer & 31 cm fall
6 Kg mass : 3.9 kg rammer & 45 cm fall
Lab
MDD
Lab
Flexural strength of beam
Dimension : 70*15*15 cm
Marking : 5 cm from both sides and in
between 3 portions of 20 cm
Embankment
Dumping of earth
Embankment
Levelling of dumped earth to grade by angle dozer
Embankment
Watering for getting
optimum moisture
content for compaction
Formula for water sp :
Embankment
Rolling by vibratory roller of 12 ton
Soil compactor : 34 ton with vibration
Batching Plant
Crusher Plant
Capacity is to produce 150 ton/hour