Professional Documents
Culture Documents
CA Evolution
• DL 5CC CA • UL 2CC CA
• Flexible CA
Fast CA
Everywhere CA
Flexible CA
750Mbps
intra-site CA capable area
IPRAN UL 2CC CA
60%
IPRAN CA area
• Qualcomm: 2016Q2
Feature: LAOFD-080201 Inter-eNodeB CA based on Dependency :The LBBPc board cannot serve the PCC.
Relaxed backhaul Cells on micro eNodeB (except BTS3911E) cannot serve
4T4R CA VoLTE Video WTTx Basic Performance
Time Sync is hard for most scenarios X2 Time Delay can’t meet requirement
98.29%99.87%
100%
89.30%
22% 90%
80%
70% 62.60%
60%
78% 50%
36.32%
40%
30%
1ms 4ms 8ms 10ms 20ms
• Only 22% hardware can support 1588V2 • Only 63% scenario meets IPRAN UL CA
Time Synchronization by software upgrade requirement;
4T4R CA VoLTE Video WTTx Basic Performance
• 1U
IPCLK500 • 64 clients
EPC
Feature: LOFD-121212 eNodeB Supporting Dependency :This feature requires LOFD-00301302 IEEE1588 V2 Clock
4T4R CA VoLTE Video WTTx Basic Performance
Direct X2@IPSEC
IPcore
IPcore
Direct IPSec enables adaptive direct X2@IPSEC and support security rules between eNodeB
VoLTE
eRAN8.1 TTIB, RoCH, VoLTE CoMP Extended Delay Budget, More Retransmission
+2dB
+1dB
Frequency Selection Scheduling for TTIB Retransmission
+4dB
Freq
L1800
2nd Trans.
4th Trans.
G900 +0.5 ~1dB
3rd Trans.
1rs Trans.
Time
2
Init Tx Retrans1 Retrans2 Retrans3 Retrans4
R12 1
eTTIB R8 TTI Bundling
0
R12 HARQ = 12
R8 HARQ = 16
Path Loss
• Qualcomm: 2017H1
4.5
EVS
20 Hz
50 Hz 50 Hz
300 Hz 4
AMR-WB
3400 Hz 9.6kbps 24.4kbps
7K Hz
12.65kbps 23.85kbps
Code Rate
* 3GPP EVS Characterization Test Result: Mixed / Music, P.800
20K Hz 20K Hz DCR test methodology
MOS
+1dB
MOS 5
EVS-SWB 24.4
EVS-SWB 13.2
4.5
+0.5
EVS-SWB 9.6
4
VoLTE Rate Control
3.5
Path Loss
3
140 141 142 143 144 145
• There are Two UE EVS-SWB capability suit {24.4,13.2, 9.6} and PathLoss(dB)
{24.4, 13.2CAM}
24.4k 9.6k EVSC1
Feature: LEOFD-121202 EVS Rate Dependency: UE should support EVS in R12, and support
4T4R CA VoLTE Video WTTx Basic Performance
4.5G Evolution
From 4.5G to 5G
CloudAIR
Hotspo Cell CIoT LiTRA
t Edge
3D 3D Flexible
PSM IOPS Coordinatio
Beamformi Coordination Bandwidth
n
ng
Go Giga Go Vertical Go Cloudification
100%
8T4P Cell1
Cell0 Cell1 Cell0
8T4P
50% Cell
Feature: LEOFD-121204 3D Dependency : The baseband board should be UBBPex1 or UBBPex2; The RRU should be
Go Giga Go Vertical Go Cloudification
IPRAN
Relaxed Backhaul
(IPRAN ,one way delay < 100ms)
Cell 2 Cell 3
Transmit
power
Coordinated Power Control Interference
PUSCH
RB
Cell 1
Allocate Band
Cell 2
Protected Band
Cell 3 Relaxed Backhaul
(IPRAN ,one way delay < 8ms)
UE1 to cell0
UE0
Benefit User0 Interfering User1
CELL1
CELL2
CELL0
CELL0 CELL1
X2
• Handover Region
CloudBB
PDSCH change to
better SINR cell.
PDCCH
2Cells Joint
PDSCH
Trans. to UE1
• Imbalance Network
PDSCH change to
Low load cell.
Cell1 Cell2
UE1
Feature: LAOFD-120201 DL Dependency : UE shall support R11 TM10,LBBPc not supported. Micro Site not supported. Lampsite
Go Giga Go Vertical Go Cloudification
f3
A better SINR chance in
inter-band is omitted
No chance for
MLB based Experience
on resources improvement Users with traffic will always move to optimal frequency
based on SINR
System always gets best spectrum efficiency