Professional Documents
Culture Documents
Concrete Pavement
Concrete pavement is categorized under item 311 of
DPWH standard specification, which provides that:
20 ¾" 0-10 - -
Dowel Bars
Joint Fillers
• Joint fillers should be mixed asphalt and
mineral or rubber filler.
• The pre-formed joint fillers are punched to
admit the dowels.
• Filler for each joint should be furnished in
a single place for the full depth and width
of the joint.
Storage of Cement and Aggregate
The storage house for cement should be
waterproof with raised floor from the ground to
protect the cement from rain or dampness.