FLYOVER
A report on Construction of Flyover at SEMRIYA CHOWK SATNA
By:
LALIT DWIVEDI
DHARNEESH SINGH PARIHAR
ANKIT SINGH
MRAGENDRA SINGH BAGHEL
VIVEK SHUKLA
VIKAS SINGH BAGHEL
VINAY PATEL
CONTENTS
2. What is Flyover
HISTORY:
• In INDIA the first flyover was constructed in
MUMBAI on 14th April 1965.
• It was 48 ft.(15m).
• It segregates the North-South and East-
West traffic at the junction.
Reason Behind Going For a Flyover
As the traffic on the road goes on increasing and we don't have
any space to regulate traffic then the only option left will be go
to provide a three-way junction that is done through flyover
construction.
DIFFERENT STAGES OF PROJECT
The main purpose of traffic survey are; traffic monitoring ,control and
management. The purpose of carrying out traffic volume count are
designing, improving traffic system, planning and management etc. In
this project flyover is designed to meets the requirement of traffic for next
30 years.
TRAFFIC CENSUS AND PCU
1.TRAFFIC CENSUS:-
2-WHEELER
3-WHEELER
CAR
BUS,TRUCK
CYCLE
TRACTOR
PASSENGER CAR UNIT(PCU)
1.PCU(Per Hour):-
2-WHEELER
3-WHEELER
CAR
BUS, TRUCK
CYCLE
TRACTOR
TOTAL PCU:-
GOETECHNICAL SURVEY
It is very necessary to carry out through soil investigation
of the site as the whole load of the structure is ultimately
taken by soil through foundation. Feasibility, design and
safety of the structure all depend upon load bearing
capacity of the soil strata.
• Pile
• Pile Cap
• Piers & Abutments
• Girders
• Deck slab
• Bearings
SALIENT FEATURES
Agency PWD
Date of commencement
contractor
consultant
PHYSICAL FEATURES & PLAN
Total length of
flyover
Width of flyover
Length of column
Length of pile
No. Of spans
No. Of piles
No. Of piers
No. Of girders
Since the bridge has to carry a big live load and its
dead weight is also very large .So we cannot go for a
simple foundation but pile foundation .Pile foundation
is a type of deep foundation .It is used where the good
soil is at higher depth(10-15 m) or low bearing
capacity of soil .Pile is used for heavy structure .In this
foundation the load coming from the super structure to
the pile cap and equally distributed in no. Of piles and
pile transfers this load into the soil.
Process of pile foundation
PILES
PILE CAP
• A thick concrete
mat that rests on
piles collectively to
provide a suitable
stable foundation is
pile cap.
• This pile cap
distributes the load
to piles uniformly.
• It is 1.8m thick and
5.2m wide.
PIER
• A Pier is a
reinforced ,raised
structure in the
form of pillars
typically supported
by pile cap .It
transfers the loads
from deck to pile
cap.
• In this flyover
hammerhead pier
is constructed.
ABUTMENTS
7.Excavator
8.Hydraulic crane