PRESENTACIÓN DE ACTIVIDADES

REALIZADAS DURANTE PRÁCTICAS PRE


PROFESIONALES
UNIDAD
PRESENTADO POR: MINERA
ANDAYCHA
César Estrella Bazán GUA

ÁREA:
Productividad/ Perforación & Voladura
DURACIÓN:
SETIEMBRE DEL 2017 A FEBRERO DEL 2018

Yauli, 07 de Marzo del


1
2018
CONTENIDOS
Introducción
Objetivos
Actividades realizadas
Análisis de resultados
Conclusiones
Recomendaciones

2
INTRODUCCIÓN

The capital and operating costs of an open pit mine are significantly
influenced by the cost of material haulage. Costs of the truck haulage
can be as much as a half of the total mining costs, with the major
expenditures attributed to fuel, lubrication, tires and maintenance.
There is a need to examine alternative transport systems. The best
solution seems to be conveyor transport, as it is efficient and
economical in power consumption. A comparison of operating costs for
these two systems favours the conveyor transport in most cases. The
evaluation of an all truck transport system versus a conveyor transport
system is a very complex problem. To perform this task, a detailed cost
analysis is required, over the whole period of a mine life.

3
OBJETIVOS

Objetivo General:

- Technical-economic evaluation of both haulage and transportation


systems.

Objetivos Espec

 Assess the social and environmental impact of both hauling and


transportation systems.

 Determine the operating cost of both haulage and transportation


systems.

 Make a decision to opt for one of these carry and transport


4
IN PIT CRUSHING AND CONVEYING SYSTEM

Diagram of an operation in Open Pit with a hauling IPCC system

5
IN PIT CRUSHING AND CONVEYING SYSTEM

 What is meaning IPCC?


IPCC is a system that combine the work of semi-
mobile crusher, belt conveyor and spreader to
remove materials from the open pit mine.

6
IN PIT CRUSHING AND CONVEYING SYSTEM

The following table shows the features and functions of IPCC.

SEMI-MOBILE CRUSHER BELT CONVEYOR SPREADER


The crusher stations are The belt conveyor is Spreaders are mobile
located inside in pit. located inside in pit. continuous operating
discharge machines.
The crushing mechanism is The distance between the Spreader discharges to
a gyratory crusher semi-mobile crusher and waste dump.
the conveyor belt trunk
line:50 meters.
Throughput: 3500 TPH Maximium lump size is 20% of Throughput: 3500 TPH
Efficiency of the system is the weidth of the belt
74% conveyor.

Relocated every 3 year. Weidth belt conveyor is 1.8 m

7
ADVANTAGES AND DISAVANTAGES
OF THE IPCC SYSTEM

• ADVANTAGES
1. Operating costs per ton / km are low.
2. Electric energy is used instead of diesel fuel, resulting in lower CO2
emissions.
3. The number of operators is reduced
4. Safety in operation is greater than truck system.

8
ADVANTAGES AND DISAVANTAGES
OF THE IPCC SYSTEM

• DISADVANTAGES
1. The location of the transport system must follow the progress of
the mine.
2. Low flexibility.
3. A period of time is needed for the relocation.
4. The system mainly depends on the crusher.

9
Mining truck haulage system
Diagram of an operation in Open Pit with a conventional hauling system (Trucks System)

Drilling Blasting Load

Stockpile
Haulage

Waste dump

Metallurgical
plant
10
Advantages and Disadvantages of Trucking
Hauling System

Advantages of Truck Hauling Disadvantages of Trucking System


System
• High operating and
• Low investment cost. maintenance costs.
• Greater flexibility. • Large number of trucks for large
• There is no restriction on the quantities of production.
size of the material to be • Large number of operators.
transported. • High maintenance cost of
transport routes.
• Not safe for the operator.
• Slow cycle of carry.

11
Characteristics of the material to be transported

Characteristics of the material to be


transported
The granulometry recommended is
approximately 6”-8” in diameter.

It is desirable that the fragments of the material


fired have a suitable granulometry so that the
truck can transport to maximum capacity.

12
Operational characteristics of the pit

Ramps
The gradients of the ramps should be in the range of 8% - 12%.
• On two-way tracks, the width of the ramps should not be less
than 3 times the width of the largest equipment in the mine.
• On one-way tracks, the width of the ramps should not be less
than 2 times the width of the largest equipment in the mine.

Safety berms
All elevated road must be provided with berms, to avoid the
fall of vehicles that circulate by these to lower levels in case of
loss or slip of the vehicle.

13
Operational characteristics of the pit

Maintenance of roads
Good conditions of the haulage routes Bad conditions of the haulage routes

 Longer useful life of the tire.  Lower useful life of the tire

 Less possibility of damage to equipment.  Longer haulage time.

 Less possibility of accidents occurring.  Higher fuel consumption.

 Shorter haulage time  Excessive wear of equipment components.

 Greater security.  More repairs

 Lower security.

14
15
C. Matos A. 16
A Hypothetical open pit mine
Principal Characteristics:
- Located in the south of Peru, at 3500
meters over the sea level.
- Close to the interconnected electrical
system
- Has 518.9 millions of tons of inferred
resources, 0.63 % Cu
- Production rate of 70,000 tons of ore per
day

17
Mine trucks system

Secuencia de movimiento de material


140000 4
120000 3.5
100000 3
80000 2.5
2
60000 1.5
40000 1
20000 0.5
0 0

Mineral a planta Mineral a stock Desmonte


Stock a Planta Ratio de desbroce

18
Economical Aspect
Item Value Units Item Value Units

Top mine trucks fleet 37 units Total Investment Cost 236 MUS$

Top mine shovel fleet 5 units Average Mine Cost 4.4 $/t

Top mine front end


1 units
loaders fleet

Accumulated Present Value and Present Value by period


2,500.00 350.00

300.00
2,000.00
250.00
1,500.00 200.00
KUS$

1,000.00 150.00

100.00
500.00
50.00

0.00 0.00
1 2 3 4 5 6 7 present
Accumulated 8 9 value
10 11 12 13 Value
Present 14 15 16 17 18
19
IPCC system

Rock Movement Sequence


150000 5

4
100000
3

2
50000
1

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Mineral a planta Tonelaje (Kt) Mineral a stock Tonelaje (Kt) Desmonte Tonelaje (Kt)
Stock a Planta Tonelaje (Kt) Ratio de desbroce
C. Matos A. 20
Economic Aspect
Item Value Units
Top mine trucks fleet 21 units Item Value Units
Total Investment Cost 308 MUS$
Top mine shovel fleet 5 units

Top mine front end loaders Average Mine Cost 3.3 $/t
1 units
fleet

Present Value and Accumulated Present Value by period


2,500.00 400.00
350.00
2,000.00
300.00
1,500.00 250.00
KUS$

KUS$
200.00
1,000.00 150.00
100.00
500.00
50.00
0.00 0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Accumulated Present Value Present Value

21
RESULTS

22
CONCLUSIONS

• According to technical-economic evaluation of both haulage and transport


systems carried out, concluded that the IPCC system offers the best
technical and economical advantages, justifying its implementation.
• According to the calculations, it was determined that the total mining cost
for the haulage and trucking system is $ 4.4 / t and for the IPCC system it is
$ 3.3 / t, concluding that there is a reduction of 25 % of total costs in the
IPCC system.

HAULAGE AND TRANSPORT


COST $/T
SYSTEM
Trucks System 4.4 $/t

In Pit Crushing and Conveying 3.3 $/t


System
23
CONCLUSIONS

• According to the social assessment carried out, the IPCC system was
identified as the one that offers the least impact in the community.
• According to the technical-economic evaluation, it was determined that
the maximum number of trucks in the conventional system is 37 trucks in
the IPCC system, which only requires 21 trucks at most, having a reduction
of 43% in number of trucks.
• According to the environmental assessment IPCC System generates lower
environmental impact due to the reduction of CO2 gas emission, concluding
that the IPCC system offers the best characteristics for sustainable mining.

24
CONCLUSIONS
REDUCTION OF THE NUMBER OF
REDUCTION OF CO2 EMISSION
TRUCKS
5 19%

8 29%

16 48%

• According to the results of the calculations, it was determined that the


investment for the trucking and trucking system is US $ 236,000,000.00 and
for the IPCC system of US $ 308,509,500.00, concluding that IPCC System
requires 31% more investment than Trucks System.

HAULAGE AND TRANSPORT


INVESTMENT (US$)
SYSTEM
Trucks System US$ 236,000,000.00
In Pit Crushing and Conveying
US$ 308,509,500.00
System
25
CONCLUSIONS

• According to the economic evaluation carried out for both haulage and transportation systems, it
was obtained that the NPV for the conventional truck system is US $ 1,721,520,034.95 and for the
IPCC system it is US $ 2,043,373,752.97, concluding that the IPCC system generates 19% more
profitability.

Accumulated present value


2,500,000,000.00

2,000,000,000.00

1,500,000,000.00

1,000,000,000.00

500,000,000.00

0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

VP ACUMULADO CONVENCIONAL VP ACUMULADO IPCC

26
BIBLIOGRAPHY

• Toledo Salas, W. (2013). Transporte en minas a cielo abierto camiones versus


sistema de chancado semi-movil dentro de tajo transportado por fajas (tesis
de pregrado). Universidad Nacional de Ingeniería, Lima, Perú.

• Loli Morales, W. (2016). Metodología de planificación a cielo abierto


considerando incorporación de in pit crusher and conveyors (tesis de
magister). Universidad de Chile, Santiago de Chile, Chile.

• Radlowski, Jacek K. (1988). In-pit crushing and conveying as an alternative to


an all truck system in open pit mines, Cracow, Polonia.

• Metso. http://www.metso.com/

• Caterpillar. http://www.caterpillar.com/
27
BIBLIOGRAPHY

• Alibaba.https://www.alibaba.com/showroom/mining-conveyor-system-belt-
price.html

• Machine Trader. https://www.machinerytrader.com/listings/construction-


equipment/for sale/list/?Manu=CATERPILLAR&Mdltxt=793F

• Cardozo, B., Trigueiro, W. & Medeiros,J. (2015). Feasibility Project for


implementation of conveyor belts in an iron ore mine. Study case: Fabrica
Mine in Minas Gerais State, Brazil.

• Toledo, W. & Tovar, R. Sistema In – Pit Crushing and Conveying (IPCC)


Alternativa para optimizar el proceso de carguío/transporte en minado por
Open Pit.
28