Subject : Construction Practice
Subject Code : C406
Topic : Roofs and Floorings
Duration : 100 min
Sub -Topic : Ceilings
Teaching Aids : PPT,Visuals, Animations
Revised by : GVVL Satyanarayana
9C406.31 to 32 1
Objectives
• Definition of ceiling
• Functions of ceiling
9C406.31 to 32 2
Recap
9C406.31 to 32 3
Ceiling
9C406.31 to 32 4
Functions of Ceiling
9C406.31 to 32 5
Requirement of Ceiling material
9C406.31 to 32 6
Requirements of ceiling material
9C406.31 to 32 7
Types of Ceilings
• Fixed type
9C406.31 to 32 8
Suspended ceiling
A ceiling attached to a frame work suspended from
the main structure
Fixed ceiling
9C406.31 to 32 9
Parts of ceiling
• Plaster of Paris
• Fiber glass.
9C406.31 to 32 10
• Gypsum boards, etc..
Frame work for ceiling
The Frame work consists of
• Aluminum tees and angles (or) Suitable wooden frames
Secured to the under side of the roof
Fig:1 9C406.31 to 32 12
Types of ceilings
• Plywood ceiling
9C406.31 to 32 13
Plaster board ceiling
Consists of
9C406.31 to 32 14
Fixing
9C406.31 to 32 15
Plasterboard ceiling
Fig 1
9C406.31 to 32 16
Fibre board ceiling
9C406.31 to 32 17
Fibre board ceiling
9C406.31 to 32 18
Plywood ceiling
9C406.31 to 32 19
Plywood ceiling
Fig : 2
9C406.31 to 32 20
Fibre board ceiling
Used where :
9C406.31 to 32 21
Fixing
• Surface distempered
9C406.31 to 32 22
Fibre board ceiling
FIBER BOARD
Timber battens CEILING
Fig 1
9C406.31 to 32 23
Ceiling with plaster of paris or gypsum
9C406.31 to 32 24
Fixing Part (B)
rows
9C406.31 to 32 25
Fixing Part (C)
9C406.31 to 32 26
Fixing Part (D)
9C406.31 to 32 27
Plaster of paris ceiling
Fig : 2
9C406.31 to 32 28
Summary
• Definition of Ceilings
• Functions of ceilings
• Parts of ceilings
9C406.31 to 32 29
Quiz
a) Walls
b) Frame work
c) Form work
9C406.31 to 32 30
2.Frame work for providing ceiling consists of
C. A and B of above
9C406.31 to 32 31
3. A Ceiling covering is supported on a
a) Walls
b) Frame work
c) Form work
9C406.31 to 32 32
4. Frame work for providing ceiling consists of
C. A and B of above
9C406.31 to 32 33
5. In plaster board ceiling Hessain scrim is
used for
a) Fixing boards
9C406.31 to 32 34
6. In plywood ceiling joints are covered with
A. Aluminum beading
B. Luppam
C. Paint
D. None of the above
9C406.31 to 32 35
Frequently asked Questions
boards.
9C406.31 to 32 36
Frequently asked Questions in Examination
9C406.31 to 32 37
Frequently asked Questions
Paris
9C406.31 to 32 38