PROYEK JALAN TOL

SERPONG-BALARAJA SEKSI 1A
(AREA GALIAN 2+100 RAMP ON&OFF)
PLAN PROFILE DB 7-8

STA 2+100
LONG SECTION
16.5
17
17.5
DB-08
18 18
Lempung Silt Abu
Kedalaman 18.5
NSPT Konsistensi Deskripsi
(m) 19
0 0 Very Stiff
19.5
0.5
20 21
1
20.5
1.5 Soft
2 3 21
Silt Lempung Pasir Abu
2.5 21.5
Hard
3 22 34
3.5 22.5
4 5 Lempung Silt Merah Coklat 23
Medium Medium dense Pasir Halus Hijau Abu
4.5
23.5
5
24 24
5.5
6 4 24.5
6.5 25
7 25.5
Soft
7.5 26 60
8 4 26.5
8.5 27
9 Hard Cadas Silt Abu
27.5
9.5
28 58
10 11
Silt Pasir + Lempung Coklat 28.5
10.5
11 29
11.5 29.5
12 12 30 51
12.5
13
Stiff
13.5

DATA BORLOG DB -8
14 12
Silt Lempung Coklat
14.5
15

STA 2+109
15.5
16 13
16.5
17
PARAMETER PLAXIS

E g un g sat C Ø Ksat
No Parameter N-SPT v
(kN/m )2
(kN/m ) 3
(kN/m ) 3 2
(kN/m ) () (m/day)
1 Timbunan 11 11000 16 19 5 20 0.043 0.3
2 Agregat CBR 60% - 5.00E+04 20 21 1 35 1 0.2
3 Concrete - 2.10E+07 23 23 1 35 0 0.15
PELAPISAN TANAH PADA PLAXIS
Soft Clay N 4
Medium Clay N 6
Soft Clay N 4
Stiff Clay N 12

Very Stiff Clay N 19


Medium Dense N 24
Hard Clay N 60
DETAIL PEMODELAN PLAXIS
On Ramp Dummy 10 cm Off Ramp Replace 1 m

Galian
Pembebanan 35 kN/m2

Timbunan

Concrete Agregat CBR 60%


Pembebanan 90.4 kN/m2

Soldier pile D 100


ANALISA PLAXIS
(1 TAHUN SETELAH AKHIR KONSTRUKSI)

Horizontal Displacement = 0.137 m Horizontal Displacement = 0.204 m


Total Displacement = 3.34 m

SF = 1.86

Bending Moments = -2.15*103 kN.m Bending Moments = -2.46*103 kN.m


PEMODELAN PLAXIS
(REPLACE 1 M +SOLDIER PILE) Off Ramp
On Ramp

Soft Clay N 4 Replace 1 m


Medium Clay N 6
Soft Clay N 4 Soldier pile D 100
Stiff Clay N 12 c/c 1.5 m Panjang 28 m

Very Stiff Clay N 19


Medium Dense N 24
Hard Clay N 60
ANALISA PLAXIS
(1 TAHUN SETELAH AKHIR KONSTRUKSI)

Horizontal Displacement = 0.043 m Horizontal Displacement = 0.049 m


Total Displacement = 2.81 m

SF = 2.40

Bending Moments = 3.03*103 kN.m Bending Moments = -3.5*103 kN.m


PEMODELAN PLAXIS
(REPLACE 1 M +SOLDIER PILE) Off Ramp
On Ramp

Soft Clay N 4 Replace 1 m


Medium Clay N 6
Soft Clay N 4 Soldier pile D 100
Stiff Clay N 12 c/c 1.5 m Panjang 28 m

Very Stiff Clay N 19 Beam


Medium Dense N 24
Hard Clay N 60
ANALISA PLAXIS
(1 TAHUN SETELAH AKHIR KONSTRUKSI)

Horizontal Displacement = 0.036 m Horizontal Displacement = 0.043 m


Total Displacement = 2.02 m

SF = 2.42

Bending Moments = 3.66*103 kN.m Bending Moments = -3.94.103 kN.m


CROSS SECTION STA 1+975
PENANGANAN SOLDIER PILE + UPPER BEAM
KESIMPULAN
Horizontal Bending Moment
Tahapan Konstruksi Safety Factor
Displacement (m) (kN.m)

Replace 1 m + Soldier
0.622 -2.46*103 1.86
Pile 20 m
Analisa 2+100 (Area
Replace 1 m + Soldier
Ramp on/off + Main 0.049 -3.5*103 2.40
Pile 28 m
Road
Replace 1 m + Soldier
0.043 -3.94*103 2.42
Pile 28 m + beam

Keterangan :
1. Pemodelan dilakukan pada STA 2+100 (Setelah Area OP Raya Serpong) dengan RoW > 60
m dengan tinggi galian +/- 6.4 m (Kondisi tanah eksisting terdapat soft soil sedalam 3 m, 2m
medium, dan 4 m soft )
2. Untuk panjang Soldier Pile 1/3 free standing dan 2/3 tertancap di tanah
3. Replace 1 m dilakukan pada ramp on dan ramp off