RES217BUILDING SERVICES

case study : CASUARINA HOTEL MERU,IPOH

AIR-CONDITIONING SYSTEM
MUHAMAD AIMAN B. MOHD FARIDI YUSLI 2014488374
WAN NUR LIYANA BT. DARSANI 2014250516
NUR FARHANA BT. SHAFIE 2014680088
CHE WAN MADIHAH BT. CHE WAN MAHMOD 2014285168
1
PRINCIPLES OF THE SYSTEM

2
COMPONENT USED IN THE SYSTEM

3
(1) Water Tank
Storage the water

(5) Duct Piping (2) Cooling Tower


Distribute the cool air Heat transfer- atmosphere

DAY-TO-DAY
OPERATION
(4) Compressor (3) Water Pump
Cooling cycle The flow of water

4
MAINTENANCE Monthly
Air filters
Day-to-day
Pipework
Thermostat
Belting

Main Switch Wiring

Water level- Cooling Screw- Compressor


tower

Refrigerant

5
COMMON PROBLEMS ENCOUNTERED & REMEDIES
Film fill Air Handling Unit (A.H.U)
• - Fouled with algae. • - Many application ductwork in 1 room.
• - ↓ efficiency heat transfer = unbalanced water
• - Leakage - capillary tube/ductpipe.
• flow.
• - Bacterial of scale forming = corrosive spots → • - Remedies : regularly maintenance
• corrosion
• Remedies : chlorine

Belting Air filters


• - Wear & tear. • - Lower heat exchange rate = wasted energy, ↔
• - System will breake down its function. • equipment life, and ↑ energy bills.
• - Dirty/ plugged filters = overheating & system
• - Life span - 3 months • damage/ fire.
• - Remedies : change belting • - Remedies : change filter

6
ADVANTAGES
COMFORT

QUIET

AESTHETIC

CONTROL

7
DISADVANTAGES
DUCTWORK

COST

POLLUTION

HEALTH

8
CONCLUSION
▪ Identify what types of principles used.
▪ Describe day-to-day operation of the system
used.
▪ Required maintenance - common problems
encountered.
▪ More advantages than disadvantages –
system used save cost & economical.
9

You might also like