Renewable Energy Sources

Solar PV System
PV system integration with building architecture
CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
Renewable Energy System
Design

RE System
Electrical Consultant RE System
Design
Design

HVAC Consultant
RE
Consultant
RE System
RE System
Architect Performance
Performance
Simulation
Simulation
Critical Inputs for RE System Design

Available
Total load to
area Land /
be connected
roof / façade

Energy Solar
generation radiation
requirements Data
Net Metering
Grid Connection Feed in tariff : >1MW
Solar PV System Size at Point of interconnection: 33kV or higher
<10 kWp 240 V
10 kWp to <15 kWp 240 V / 415 V Incentives: Generation based incentive [for
>5MW plants]
15 kWp to <50 kWp 415 V
50 kWp to <100 Accelerated Depreciation
kWp 415 V
>100 kWp 11 kV Tariff determination: CERC guidelines

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
PV PANELS LOAD FOR ROOFTOP MOUNTING

Wind
Load/Lif
[subject to site
wind profile]

Dead weight: 1 – 2 kg/f2


[ 10 – 20 kg/m2]

Code of Practice for Design Loads for Buildings and Structures Part 2 Imposed Loads
Flat, sloping or curved roof with slopes up to and including 10 degrees: 1.5 kN/m2
≈150 kg/m2
RETscreen
RETscreen
Simulation
Simulation

THUMB RULES

Annual
Generation

≈ 1500
Assuming
kWh/kW
16%
efficiency
Installation Area
Required
≈ 10 m2/kWp
Conventional Practices

• System Design
• Generally hot water system is lef out
during the design stage
• Installed as add on to the building
• No consideration for water quality
• No consistency with building plumbing
systems

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
Thermo siphon system
(<3000 LPD) Forced circulation system
(> 3000 LPD)

System with heat exchanger


Flat plate collector.
40ºC to 80ºC
Evacuated tube collector
80ºCto 120ºC

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
FPC ETC
≈2 sq. m . ≈1.50 sq. m.
absorber of absorber
area for 100 area for 100
litre tank litre tank
capacity capacity
system system

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
THUMB RULES

100 lpd system


collector area ≈2 sq.m
Rooftop area  ≈ 3 sq.m

Average Electricity Saving  ≈ 5 units/day


≈ 1200
units/year

Dead Load on Roof


2 sq m collector weight: 50 kg
Water Tank : 1.2 kg/L

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
EXAMPLE

Total hot water requirement = 10100 LPD


Case SHW Annual Energy % offset Points
sizing saved by SHW of annual
At 60 oC system energy
(LPD) (MWh) consumpti
on
Case1 2020 25.5 21% 1

Case2 5151 64.9 51% 1+1

Case3 7171 90.4 71% 1+2

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
RETscreen
RETscreen
Simulation
Simulation

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE