Final Presentation
of Internship Program
FINAL PRESENTATION
Semberah
Badak
Nilam
Pamaguan
Mutiara
Semberah Field also contains multiple oil and gas reservoirs, with production from depths
of 1000 feet to 10,000 feet. To date 107 wells have been drilled. The peak oil rate was
14,700 BOPD in 1995 and gas rate at 180 MMSCFD in 2000.
There are 2 Station (Semberah Plant-13 and C-09 Mini Plant) within the Semberah
Operations area. Semberah Plant-13 covers Southern Semberah Well and C-09 Mini
Plant placed in the middle of Semberah Field as a booster to cover well in area within
Plant-13 and Plant-14. Northern Semberah well will directly flow to Semberah Plant-14
(Central Plant).
VLP Separator
Semberah 13 Plant
VLP Separator
MP Comp.
216# - 752#
MP Separator Dehydration
WHC. Unit
MP 12# - 102# Degassing
Well Boot
VLP
Separator Heater
VLP Comp. Treater
21# - 301#
Ligature Pipe Line to Export
Tangki
Crude
WHC.
VLP 12# - 102# VLP Comp.
Well 21# - 301#
VLP
Separator
Semberah 14 Plant
The total dynamic head is the total pressure when water is flowing in
the system. It includes pressure needed to overcome elevation
differences, and friction losses in the pipes in order to produce a
required operation pressure at the outlets.
2,2 m
API Separator
2,6 m
Box Control
0,7 m
3m
API Separator
0.3 m
3m
2,6 m
150
TDH (ft)
140
130
120
110
100
90
80
0 10 20 30 40 50 60 70 80 90 100
Flow rate (GPM)
One Team One Direction VICO Indonesia
Orifice
Larger Impeller
Diameter
D = 64,6919 ft = 19,731 m
Burn
Pit
Pump
D = 64,6919 ft = 19,731
m