You are on page 1of 6

8” 8” 10”

8”
Secondary Loop

6” 8”

8” 6”
8”
8” 8”

Primary
8” Pumps
8” 10”

To chiller #2
6”
6”
From To chiller #3
Chiller 8”
#1 6”
EXISTING
CHILLER #3 EVAP
TRANE CENTRAVAC- 300Ton
EXISTING CHILLER #3
6” CHILLED WATER PIPING
6” ISOMETRIC DIAGRAM
BETHESDA CENTRAL PLANT
CHILLER WILL BE SITE-CLEARED
BY OTHERS- FREE-COOLING
7/29/10 SYSTEM W/ HEAT EXCHANGER
TRENT WILL BE INSTALLED IN THIS LOCATION
Return to Marley
cooling towers

10”
6”

10” 10”
from CT Pumps

6”

From new
8” 400 Ton
Chiller

CHILLER #3 COND
8”
6”
6”
TRANE CENTRAVAC-300Ton
8” EXISTING CHILLER #3
From new
400 T
COOLING TOWER WATER PIPING
Chiller by 6” ISOMETRIC DIAGRAM
others BETHESDA CENTRAL PLANT
CHILLER WILL BE SITE-CLEARED
BY OTHERS- FREE-COOLING
7/29/10
SYSTEM W/ HEAT EXCHANGER
TRENT
WILL BE INSTALLED IN THIS LOCATION
30 HP CHW Circ
Pump CURRENT 300 TON Chilled Water
CHILLER PAD-3” Deep Return
Chilled Water
Supply – must be
8”
8” service from
8” header above Return Source must be
8” HEAT- Future From 8” header above
8” EXCHANGER Expansion
60”
8”
8”
8”
143” Plate & Frame
Heat Exchanger
Cooling Tower Assembly ( Insulation &
Supply & Return 30 HP CT Circ jacketed in the field)
Pump
Service must be tapped
From 8” headers above
FUTURE 400 TON
92” CHILLER PAD-3”Deep
(In place for Install)

175”
PROPOSED
FREE-COOLING SYSTEM
7/29/10
PLAN VIEW
TRENT BETHESDA CENTRAL PLANT
TO HOSPITAL
10” 10” 10”
10”
10”
10” SECONDARY LOOP
10” 10” 10”

RUHRPUMPEN IR 6X9 SB 8”
IMP 9.55” IMP 8.582”
BG 1510 8”
6BC 9.375”
1200 GPM AT 60’HD 1350 GPM 1875 GPM
25HP 1800 RPM 30HP 1775 RPM AT 65’HD
8”
40 HP 1775 RPM
10”
8” 8”
FREE COOL SYSTEM CHILLER#2
400T
10”

6” 6”
NEW CHILLER #3-300T
10”

8” 8”

8”
FROM 8”
HOSPITAL

TO HOSPITAL CHILLER #1- 400T CHILLER SYSTEM


WITH FREE-COOLING
PROVISION
7/29/10 8” CHILLED WATER
TRENT FLOW DIAGRAM
CHILLER SYSTEM
WITH FREE-COOLING
PROVISION
COOLING TOWER WATER
FLOW DIAGRAM
CHILLER #2
PENDING REPLACEMENT
WITH EVAPCO BG 1510
USS-212-524 TYP 2 6BC 8.75”
TOWER 1800 GPM
SET #1 AT 50’HD
30 HP 1775 RPM
MARLEY

8”
FREE COOL SYSTEM
BG 1510
8” 6BC 9.375”
1875 GPM
AT 65’HD
CHILLER #3 40 HP 1775 RPM
TOWER
SET #2
EVAPCO TYP 2
CHILLER #1 SST-112-612

7/29/10
TRENT
Source at PRV Station Discharge below in BR
CV 15# Steam Condensate
2” CV Service 3” Return 2”
For Each 2 Tubular Steam Heating Coils
2”
All other Piping 2 Heater Typical for each tower basin
Sch 40 CS Screwed Circuit 2” 2”
2”
2” Tower Service 2”
2”
Piping CV
T T T

25’ Roof edge 40’

Sump Drain All Piping in


Basin Sch 10
304/316 SS
25’ 23’ Sump Drain
CT Basin

CT Basin
Roof edge

All Specialities
Existing Evapco Towers Existing Marley Trap/Strainer/
Towers (dotted) Valves
PLAN VIEW OF ROOF New Evapco Towers
For Each Tube
to be installed soon
CHILLER PLANT Bundle
by Owner
W/ CONCRETE TOWER BASINS 7/29/10