Professional Documents
Culture Documents
Engineering Documentation
• Drive Loop Diagrams
– Used to generate wiring diagrams and cable schedules
using automated systems
– Used in C2 commissioning as a checklist for the
installation
– Used by the production support engineers and technicians
for fault-finding and modification
• Older operations will have traditional switchgear circuitry
• Newer operations will have “intelligent” switchgear with
networked drives
“As-Built” document key requirement for
maintenance
Field Marshalling & PLC Equipment Cabinets
Motor Switchgear MCC Bucket Marshalling PLC
Starts Healthy
Start
Ethernet PLC
Stop Card Processor