Professional Documents
Culture Documents
COPQ
•Profits
Examples include:
• Quality planning
These are all
• Quality training planned,
• Engineering design proactive
• Preventive maintenance activities
The costs associated with evaluating or auditing
products or services to assure conformance to
quality standards and performance requirements.
Examples:
Incoming inspection/test
Calibration of inspection/test equipment
Final inspection/test
All costs resulting from products or services
not conforming to requirements or customer/user
needs which occur BEFORE delivery/shipment of
product, or the furnishing of a service.
Examples include:
• Scrap/rework
• Reinspection/retesting
• Material Review Board
Increased Competitiveness
Effective Quality Improvement
Which Leads to
It all Starts Here!
Higher Quality
Which Leads to
Increased Productivity
Which Leads to
Increased Competitiveness
OTHERS TRUCKS
Flat Tire
DEFECT =
Late Deliveries
Rain or snow,
Landslide, flood Too Slow
earthquake
Poorly trained