You are on page 1of 13

STUDY OF NPS IN

COMMERCIAL AREA

ZHAHIDAH HUSNA
GURUMURTHY
IQBAL
ARJUN
IZWAN
QISTINA
BACKGROUND OF THE STUDY

Industrial Accidental or purposive


Water Pollution
development dumping

Effect:
• Negative impacts on health and well-being of humans, plants and animals.
• Contamination of potable water sources

Solution:
• Use Best management practices (BMP) – to prevent pollution
*pollutants is filtered out
*sources is being controlled
OBJECTIVES OF THE STUDY

• Collect & analyze stormwater runoff from commercial area


• Investigate level of pollution for stormwater – by taking sample of no raining day
• Propose recommendations to reduce water pollution level

SCOPE OF STUDY

• Analyze the quality of stormwater runoff located at Taman Universiti

-BOD test
- Total suspended solid (TSS) test
- pH test
METHODOLOGY
STUDY AREA
- Taman Universiti, Skudai
- Near to Ayamas Stall
- Opposite PETRONAS gas
station

WATER SAMPLING
- In situ method
- Use bottle
WATER SAMPLING
WATER SAMPLING TEST
BOD
Dilution sample
Prepare the water prepared for 50ml,
DO of water sample
sample 100ml and 300 ml
of water sample

𝐵𝑂𝐷5
First DO of every Measured DO after
dilution 5 days 𝐷1 − 𝐷2
=
𝐷𝑖𝑙𝑢𝑡𝑖𝑜𝑛 𝐹𝑟𝑎𝑐𝑡𝑖𝑜𝑛
PH

• 100 ml water sample prepared


• Calibrated using pH transmitter
to get the pH value
TOTAL SUSPENDED SOLID (TSS)

TSS = weight of
Weight the filter sample (g) x
paper 1000/volume of
sample (ml) x 10^-3

After 2 hours,
Prepare 20 ml
weight again the
water sample
filter paper

Poured 20ml of Filter paper placed


water sample in TSS in oven for 2 hours
equipment at 95C
RESULTS AND
DISCUSSION

BOD5 TSS
pH
Water Sample
Parameter 300ml 100ml 50ml Average

Initial Final DO BOD5 Initial Final BOD5 Initial Final DO BOD5 BOD5

DO DO DO DO

Baseline 8.36 0.05 8.31 8.71 0.08 25.89 9.66 0.07 57.54 30.58

1 Day Rain 7.13 0.12 7.01 5.90 0.13 17.31 4.36 0.08 25.68 16.67

2 Day Rain 8.19 0.06 8.13 7.39 0.07 21.96 7.32 0.09 43.38 24.49

3 Day Rain 9.20 0.12 9.08 8.58 0.08 25.50 8.28 0.11 49.02 27.87
TOTAL SUSPENDED SOLID
TSS VALUE VS DAY
900
840

800
• Increment From Baseline to 1 Day
700
Rain: NPS pollutant entering
600
• Decrement From 1Day Rain to 3Day
500
TSS Value

Rain: Pollutant washed off by


400
320 previous rain
300

200
125
100 60

0
BASELINE 1DAY 2DAYS 3DAYS
Day
CONCLUSION

• BOD test – within Standard B

• pH test – within Standard B POLLUTION LEVEL IS NOT HIGH

• TSS test – within standard limit

You might also like