You are on page 1of 10

National Highway Division Kolhapur

PRESENTATION ON PREPARATION OF
DETAILED PROJECT REPORT
FOR UPGRADATION OF
KOLHAPUR-GAGANBAWDA-TALERE ROAD
IN THE STATE OF MAHARASHTRA

August 2017 AICONS ENGINEERING PVT. LTD.


National Highway Division Kolhapur

LOCATION MAP OF THE PROJECT ROAD


National Highway Division Kolhapur

EXISTING FEATURES
• ROAD NAME: Kolhapur-Gaganbawda-Talere (Proposed National Highway)

• START POINT: Talere Junction on Mumbai-Goa NH 66 (Km 287.200 of NH-66) at


Km 53.600 of the existing road

• END POINT: At Km 138.360 of the existing road near Phulewadi (at the start point
of Kolhapur Municipal limit)

• CONNECTIVITY Connects Mumbai-Goa (NH-66) and Pune-Bangalore (NH-4)

• EXISTING LENGTH 83.950 Km

• EXISTING C/W WIDTH 5.5m to 7.0m

• EN-ROUTE DISTRICTS Sindhudurg (30.150 Km) & Kolhapur (53.800 Km)

• NO. OF BUILT-UP Connects 25 Nos. of roadside built-ups

• MAJOR BUILT-UPS Vaibhavwadi, Gaganbawda, Aslaj, Salwan, Kale, Koparade, Balinge

• TERRAIN Plain – 5.650 Km, Rolling – 68.900 Km & Steep – 9.400 Km

• LENGTH OF GHAT SECTION 9.400 Km (from Km 75.350 to Km 84.750)

• RIGHT OF WAY AVAILABLE Varies between 6.0 m to 59.0 m


National Highway Division Kolhapur

PROPOSED FEATURES
• PROPOSED LENGTH: 82.440 Km (Design Km 0.000 to Km 82.440)

• PROPOSED LANE: 2-lane Paved Shoulder (Paved Carriageway 10.0m)

• PROPOSED PAVEMENT TYPE: Plain Jointed Rigid Pavement (CC)

• PROPOSED CRUST THICKNESS: PQC-280mm, DLC-150mm, GSB-150mm, Subgrade-500mm

• MAJOR REALIGNMENTS/ BYPASS: RUB realignment near Kokisare (LC-21, Rly Km 287/9) and
Major Bridge Realignment over Bhogawati river near Balinge.

• PROPOSED PACKAGES 3 Packages

• TOTAL LAND TO BE ACQUIRED 27.50 Hectare


National Highway Division Kolhapur

Packaging of the Project Highway


The project section is proposed to be divided into 3 number of sub sections for
improvement as given below -

Package: I – Starting from Talere Junction at Km 53.600 (Design Ch. 0.000) to


Ch. Km 85.450 (Design Ch. 30.670) before Gaganbawda, design length 30.670
Km,

Package: II –from Ch. Km 85.450 (Design Ch. 30.670) to road end near
Phulewadi at Ch. Km 138.360 (Design Ch. 82.440), design length 51.770 Km,

Package: III – Construction of RUB near Kokisare on new alignment from Ch.
Km 64.850 (Design Ch. 10.830) to Ch. Km 67.000 (Design Ch. 12.900) of length
1.670 Km and construction of major bridge over Bhogawati river near Balinge on
new alignment from Ch. Km 135.200 (Design Ch. 79.300) to Ch. Km 135.700
(Design Ch. 79.800), design length 0.530 Km, i.e. total design length 2.200 Km.
National Highway Division Kolhapur

Alignment of Pkg-I & II on Google Earth


National Highway Division Kolhapur

Alignment of RUB Realignment on Google Earth


National Highway Division Kolhapur
Major Bridge Realignment on Google Earth
National Highway Division Kolhapur

Package wise Civil Cost Details


Packages Proposed Length (Km) Civil Cost (Cr.)

Package-1 30.670 197.95

Package-2 51.770 382.19

Package-3 2.200 23.50


Thank You…