TEMPORARY STORAGE
Material Flow Pattern
Issue of fabric to cutting section: The required
amount of fabric is issued to the cutting section
through fork lifter or the power pallet truck as
per requirement.
Transfer of cut parts to parts section:
The cut parts are transferred to the parts section
through a vertical trolley system. The cut parts
would be lifted by the help of a trolley to the
parts section from where it would be fed to the
respective lines. In the parts section, material is
handled via bins, or racks as per requirement
Transfer of panels to assembly section:
From parts to assembly garments are transferred
through use of various bins, racks or trolleys. And
in the assembly section, garment panels move on
a mover system.
Transfer of garments to finishing section:
Garment is transferred to the finishing section
through the stairs using gravity. There would be
slider provided in the stairs for easy movement of
the bins on the stairs. In the finishing section
garments will move on mover system and racks.
SEWING WORKSTATION DESIGN 1
Area consumed by each
workstation = 1.8 sq
meters
Area consumed by each
workstation = 3.5 sq
meters
2.5 feet space is being
provided for operators
sitting and movement.
Main aisle of 3 feet is
being provided between
two lines.
SEWING WORKSTATION DESIGN 2