RISK ASSESSMENT IN BLOCK CAVE


MINING
ALUMNOS:
ANGELES PABLO, ROSSANA
LEON MENA, HANS
TINTAYA MEDINA, VIC TOR
VEGA GOMEZ, DARWIN

1
INGLES TECNICO II

CAVE MINING METHODS

These methods of caving in mining are classified into 3 categories:


long-wall mining, sublevel caving and block caving. We require for this
a large mineral body.
When exploited in a massive way, there is a risk of waste dilution and
ore loss.

2
INGLES TECNICO II

VOCABULARY
CAVING: hundimiento
SUBLEVEL CAVING: Hundimiento por subniveles, derrumbamiento de
subnivel.
BLOCK CAVING: Hundimiento por bloques, mtodo de explotacin en
minera, consistente en delimitar un bloque de una gran masa y por
voladuras en la base, ir obteniendo el mineral al mismo tiempo que se
produce el hundimiento por gravedad.
ORE BODY: Cuerpo mineralizado
GRADES: Leyes
WASTE DILUTION: Dilucin de desechos

3
INGLES TECNICO II

BLOCK CAVING METHOD


It is a massive mining system where extraction depends on gravity, where
large proportions of ore are broken, where it is stored and caving by
gravity.
This method of exploitation is low cost but high initial investment. We
require drilling and blasting for the production operation, where large
blocks of 1000 m2 are formed.
The mineral is fragmented by the action of gravity forces and pressure
between blocks which allows extraction through draw points.
Being a massive method, block caving results in a lower extraction cost
per ton than any other underground method.

4
INGLES TECNICO II

VOCABULARY
THE MINING LEVEL: Nivel en minera
ORE: mena, mineral, metal en bruto
DRILLING: Perforacin
BLASTING: Voladura
CROSS SECTION: Seccin transversal
UNDERCUT: Corte hacia abajo, socavar.
SLOT: Cara libre
ROCK MASSES: Roca masiva
DRAW POINTS: Puntos de extraccin
UNDERGROUND MINING METHOD: Mtodos de extraccin subterrnea

5
INGLES TECNICO II

ADVANTAGES DISADVANTAGES
Block preparation requires more
It turns out to be more economical.
money.
Centralized production allows for
Keeping tasks can be expensive
greater labor supervision.
When we vary the production we need
Less complex ventilation control.
more time to prepare the blocks
Production remains relatively high. Low mineral recovery.
Appropriate system for low grade ore The change to another underground
bodies. method is difficult.

6
INGLES TECNICO II

VOCABULARY
TIMBERING: Apuntalar las excavaciones de las minas con maderos o
armazones metlicos
VENTILATION: Ventilacion
DRIFTS: Galeria en paralelo del cuerpomineralizado
ORE DRAWING: Mineral extraido

7
INGLES TECNICO II

CONCLUSIONS

Mining projects due to various parameters and sources of


uncertainty in whole of their life cycle are always considered as high
risk projects.
In time and proper identification, assessment and then management
of risks in these projects leads to decrease the danger of losing
sources (capital, time, human), increases the chance of a
successful operation and hence will extend the application of such
projects.