PP C HNG CN BNG
FEATURES OF CONTINUOUS BRIDGE BUILT BY CAST-
IN-PLACE BALANCED CANTILEVER METHOD:
Lend span = (0.60.7) Lmain span
Side spans consist of:
Segment of constant height cast on stationary
falsework, Lconst. seg. = (0.150.2) Lmain span;
Cantilever end span segments;
Girder soffit curve:
Parabolic curve
Third-degree curve
FEATURES OF CONTINUOUS BRIDGE BUILT BY CAST-IN-
PLACE BALANCED CANTILEVER METHOD (cont.):
Spans arrangement:
Continuous beam bridge;
T-frame bridge;
Beam-frame bridge;
Cross section
Segmental division:
Pier segment (pier table): 1012m
Cantilever segment: 3.55m
Closure segment: 1.52m
FEATURES OF CONTINUOUS BRIDGE BUILT BY CAST-
IN-PLACE CANTILEVER METHOD (cont.):
Pre-stress strands:
Top fiber
Bottom fiber
Deck slab, diaphragm
Ducts, anchorages
Bearings:
Temporary
Permanent
FOUR MAIN STAGES OF CBCM:
1. Cast pier segments Ko on pier heads;

2. Balanced cantilever stages;

3. Cast end span segments on fixed


falsework;
4. Cast closure segments;
CAST Ko SEGMENTS:
1. Stationary falsework for spreading pier heads
(bracket);

2. Permanent & temp. bearings (gi chnh, tm);

3. Maccalloy bars (thanh CC);

4. Ko segment structure: length (1012m),


diaphragm (3m thk), manhole, etc. ;
CANTILEVER SEGMENTS:
1. Form traveler;

2. Segment structure: length (3.55m);

3. 57 days per segment;


END SPAN SEGMENTS:
1. Stationary falsework;

2. Segment structure:

length (0.120.15)Lmain span;


CLOSURE SEGMENTS:
1. End (external) span closure;

2. Internal span closure;

3. Sequence of closure;
CONSTRUCTION SCHEDULE:
1. Rolling (cun chiu);

2. Parallel (song song);


FALSEWORK FOR PIER SEGMENT:
1. Installed both sides of pier bridge
longitudinally (lp 2 bn thn tr theo phng
dc cu);
2. Dimensions:
Transversal width:
bottom slab width + 2m each side;
Longitudinal length at each pier side:
cantilever length of segment + 2m;
FALSEWORK FOR PIER SEGMENT:
1. Beams spanning on temp. pier (dng dm
k trn tr tm);
2. Bracket standing on pile cap (chng xin
xung b mng);
3. Bracket mounted on pier (gin cng xon
trn nh tr);
FALSEWORK FOR PIER SEGMENT:
DESIGN
FALSEWORK FOR PIER
SEGMENT:
1. Applied loads (ti trng);

2. Content of structure checking (ni dung


tnh duyt);
Pier shapes
T-frame bridges
FORM TRAVELERS (FT xe c):
Overhead (treo trn);
Beam
Truss
Underslung ( di);
SAFE AGAINST OVERTURNING MOMENTS
(n nh chng lt):
Causes for cantilever imbalance (nguyn
nhn gy mt cn bng);
Method against overturning (bin php
chng lt);
METHOD OF CASTING PIER SEGMENT ():
Install permanent bearings, Maccalloy bars;
Formwork: soffit, external, internal;
Rebars, ducts;
Concrete placement;
METHOD OF CASTING PIER SEGMENT ():
INSTALL & MOVE FORM TRAVELER ():
Install;
Move;
CANTILEVER CAST ():
Form;
Ducts;
Anchorages;
Pre-stressing
STRESSING PROCEDURE ():
Install strands;
Stressing;
Grouting;
CAMBER ():
;
;
;
CONSTRUCTION OF END SPAN SEGMENTS:
CONSTRUCTION OF END SPAN SEGMENTS:
METHODS OF CLOSURE ():
End span closure;
Internal span closure;
METHODS OF CLOSURE ():
End span closure;
Internal span closure;
CONSTRUCTION ORGANIZATION ():
Site arrangement & concrete supply;
Sequence of closuring;
CONSTRUCTION ORGANIZATION ():
CONSTRUCTION ORGANIZATION ():