CARBON CEMENT
PLANT DESIGN: HEAT INTEGRATION
GROUP
ADITHA32
OKTARIANY
FITRIANI MEIZVIRA
IVA RAUDYATUZZAHRA
RICKY
YUGO WIDHI NUGROHO
ZHOFRAN BINTANG
CHAPTER 1
HEAT INTEGRATION
Heat Exchanger
Network
There are two
In heat exchange
kind of methods
network, the
which can be
streams
used to
arrangement,
determine the
such as which
pinch from all
streams can
heat exchangers
exchange heat,
in a plant:
can be
composite curve
determined from
and problem
a method called
table cascade.
heat recovery
pinch.
Energy Integration in Cement Plant
By knowing the Total Mass, Fuel Requirement column will calculate mass needed for
each fuel.
UTILITY: ELECTRICITY
EQUIPMENT ELECTRICITY REQUIREMENT
Usage Power Energy Required
No. Equipment Tag number Qty
Time (h) (kW) (kWh)
1 Jaw crusher CR-101 1 24 110 2,640
2 Rod mill MI-101 1 24 2500 60,000
3 Ball mill MI-102 1 24 120 2,880
4 Blending machine BR-101 3 24 20 1,440
5 Electrostatic precipitator EP-101 1 24 75 1,800
6 Cyclone for preheater CY-101 1 24 190 4,560
7 Rotary kiln RK-101 1 24 315 7,560
8 Grate cooler E-101 1 24 120 2,880
9 Air cooler E-102 1 24 120 2,880
10 Fuel crusher CR-102 1 24 55 1,320
11 Fuel mill MI-104 1 24 132 3,168
12 Flash dryer DR-101 1 24 22 528
13 Screw conveyor (no tag number) 1 24 146.95 3526.8
Overall Duty 95,182.8
Daily plant operation electricity requirement = 95,182.8 kWh
NB:
1 year = 330 days
Electricity price = IDR 1,112.00/kWh (I-1/3500 VA-14 kVA)
OFFICE ELECTRICITY REQUIREMENT
Power
Working Hour Power per
No Type of Electricity Amount per Hour
per Day Day (kWh)
(kW)
1 Lighting 800 10 and 24 3.2 and 22.4 570
2 AC 20 10 0.75 7.5
3 Computer 15 10 0.25 2.5
4 Control System Room 10 24 0.25 8
Office Equipments
5 10 10 0.1 1
(Printer, Scanner)
Total 589
DETAILS FOR LIGHTINGS ELECTRICITY
REQUIREMENT
=
E = Illuminance
= Total of lumen
LLF = Light Loss Factor = 0.8 (SNI)
UF = Utility Factor = 0.8 (SNI)
n = Number of lamp each lamp point
A = Area of the building (m2)
Lighting Details Daily office and lighting
Parameters Office Plant electricity requirement = 589
Hours operating 10 24 kWh
Fluorescent Fluorescent
Type of light lamp PL-C lamp PL-L 40 Annual office and lighting
26 Watt Watt electricity requirement =
214,985 kWh
Lighting lumen (Lm) 1800 3500
Lighting illuminance (lux) 192 224 Annual office and lighting
Power per lighting unit (kW) 3.2 22.4 electricity cost = IDR
Total energy required (kWh) 32 537.6 239,063,320.00
NB:
1 year = 365 days
Electricity price = IDR 1,112.00/kWh (I-1/3500 VA-14 kVA)
UTILITY: WATER
The main process of the plant has no need for water. Water as
utility will be discussed in the scope of human needs for
sanitation and consumption.
Total Needs
No. Activity Qty Unit Information of water
(m3/day)
Drinking Assumed there are 5000
1. 2 Liter/day 10
water employees
For total annual number of water needs of 37, 960 m3, the
annual water expense is IDR 383,391,000.00.
NB: The calculation for water expense is simulated monthly via its own website.
THANK YOU