PRE ENGINEERED BUILDINGS
Tailor made building based on
clients requirement & actual
design calculations using tapered
sections.
A combination of built up section,
hot rolled section, cold formed
elements and profiled sheets
Designing and casting is done in
factory
Building components are brought
to site
Then fixed/jointed at the site
All connections are bolted.
CONVENTIONAL STEEL BUILDINGS
Very common in industrial steel
structure & actual design
calculations using plain section
given by IS.
A combination of built up section,
hot rolled section, and profiled
sheets
Designing and casting is done
partially or fully factory
Then fixed/jointed at the site
Connections are welded or bolted
which is as per requirement.
BRIEF HISTORY OF PEB
Steel was very expensive item in WORLD.
The concept of PEB originate in USA.
The idea was that section should be provided as per
B.M.D.
This lead to the saving in steel and development of PEB
concept.
APPLICATIONS OF PEB and CSB
Industrial Buildings
Warehouses
Commercial Complexes
Showrooms
Offices
Schools
Indoor Stadiums
Outdoor Stadiums with canopies
Gas Stations
Metro Stations, Bus Terminals, Parking Lots
Primary Health Centers, Angan wadis
And many more
P E B vs CSB CONT.
Industrial Building

Railway Station
P E B vs CSB
High rise Building

Ware house
P E B vs CSB

ADVANTAGES of PEB over CSB


Aesthetic Appeal
Faster Completion
Economical
Seismic Resistance
Ease of Expansion
Maintenance Free
Large Clear Spans
Controlled Quality
Hassle Free
Self weight Self weight
30% lighter More heavy
Primary Member is Primary members are
tapered section Hot rolled I section
Secondary members Secondary members
are light weight rolled are I or C section
framed Z and C which are heavy in
section weight.
Delivery average 6 to 8 Delivery- average 20 to
weeks 26 weeks
Foundation-simple Foundation- expensive,
design, easy to construct heavy foundation
& light wt. required.
Erection cost and time- Erection cost and time-
accurately known 20% more than PEB
Erection process is easy, Erection process is slow
fast, step by step and extensive field labor
is required.
Seismic Resistance- low Seismic Resistance- rigid
weight flexible frames heavy weight structures
offer higher resistance to do not perform well in
seismic forces seismic zones
Overall price -30%lower Overall price - Higher
architecture-achieved at Price per square meter.
low cast Architecture- achieved at
higher cost
P E B vs CSB

OBJECTIVES OF STUDY
To prepare a report on Characteristic performance
of Pre Engineered building Vs Conventional Steel
building.

To set the Economic advantages of both the


building.

To liberate the Strength and Durability


characteristic of both the building.

To make the comparatives studies of PEB and


CSB.
SCOPE OF STUDY
IN TODAYS CONSTRUCTION INDUSTRY, PROJECT
ARE IMPLEMENTED ON FAST TRACK BASIS.

SELECTION OF MATERIAL PLAYS CRUCIAL ROLE


IN FAST TRACK BASIS PROJECT.

STEEL IS A BEST OPTION FOR DESIGNER, IT


PROVIDE FLXIBILITY, DUCTILITY, STRENGTH ETC.

IN STEEL MATERIAL, DESIGNER CAN GO FOR PEB


OR CSB.
GUIDELINES FOR PEB DESIGN AT PROPOSAL
STAGE
ALL DESIGNS SHALL BE AS PER MBMA AMERICAN
STANDARDS UNLESS CLIENT SPECIFIES AS PER IS
CODE
LIVELOAD AS PER AMERICAN CODE = 0.57
KN/M^2 AND AS PER IS CODE = 0.75 KN/M^2.
(REDUCTION IN LIVE LOAD TO BE INCORPORATED
FOR BUILDINGS HAVING HIGHER SLOPES)
AS PER AMERICAN CODE :HORIZONTAL
DEFLECTION = L/180 & VERTICAL
DEFLECTION=Eh/100 FOR MAIN FRAMES.
WIND TERRAIN CATEGORY 3 IS TO BE SELECTED
UNLESS MORE DATA IS AVAILABLE.
CONTD

IN AMERICAN DESIGN , WIND COEFFICIENTS TO BE


FOLLOWED AS GIVEN IN MBMA.
IN IS DESIGN, INTERNAL & EXTERNAL BUILDING
WIND COEFFICIENTS AS PER IS -875 (PART-3).
GENERALLY BUILDINGS ARE TO BE DESIGNED AS
PINNED EXCEPT FOR BUILDING SPAN >30M OR
CRANE CAPACITY OF MORE THAN 5 TONS OR
HEIGHT GREATER THAN 9 M
STANDARD PURLIN LAPS SHOULD BE 385 mm
Steps of Design
Wind load calculation
Purline Design
Girt Design
Design of Main Frame
Base Plate
Anchor Bolt design for Moment Condition
Anchor Bolt design for Shear Condition
Gable column design
Design of connection plate
Cranes Design
CONCLUSION
Steel is a versatile material that every object we
see in daily life has used steel directly or
indirectly.
Steel remains and will continue to remain logical
and wide choice for construction purpose,
environmentally also, as much of the steel used
is recycled.
Its strength and large clear spans mean the
design is not constrained by the need for
intermediate support walls. As your requirements
changes over the years, you can reuse, relocate,
& modify the structure.
The major advantage of metal building is the high
speed of design and construction for buildings
of various categories.

You might also like