You are on page 1of 24

ENVIRON

HOLDINGS
SDN BHD
(Reg. 49537-M)

INDUSTRIAL TRAINING PRESENTATION


NAME: MIRDZA FAROUK BIN MURHAN MUKHOYIDDIN
STUDENT I.D: 2015636698
COMPANY: ENVIRON HOLDINGS SDN BHD
INDUSTRY SUPERVISOR: MS AMMIE HASLINDA BINTI YAAKUF
DURATION: 17 JULY 2017 21 SEPTEMBER 2017
INTRODUCTION
Mandatory course for all degree students of Chemical Engineering.
A requirement to fulfill the course in order to complete the degree
as well as graduate from the university
The industrial training duration is 10 weeks started from 17th July
2017 until 21st September 2017.
The Malaysian Engineering Accreditation Council (EAC) has
stated that an undergraduate has to undergo at least eight weeks of
industrial training as part of their course.
OBJECTIVES
To fulfill the award of degree of University Teknologi Mara (UiTM)
Enhancing the interpersonal skill
Apply knowledges gained and theories leant in classroom working
environments.
Familiarize with the structure of an organization and its
management system.
Improving communication and management skills.
COMPANY PROFILE
Specialist company in the area of environmental engineering.
Operates in numerous facets of environment area:
- Industrial water treatment.
- Municipal and wastewater treatment.
- Commercial and agro-commercial waste treatment recovery
of renewable energy from Biogas and Biomass.
Acts as manufacturers representative for equipment on
environmental area.
ORGANIZATION STRUCTURE BOARD OF
DIRECTOR

CEO

HR/ADMIN

ACCOUNT SALES DIVISION ENGINEERING

WORKSHOP

Municipal Water & Industrial Water &


Oil Palm Biogas/RE Biomass
Wastewater Wastewater
AREA EXPERT
1) Biogas Recovery and Renewable Energy 2) Leachate Treatment
Dewatering of sludge Extending life spans of sanitary landfills
Gas mixing of digesters Reduction of odour in landfills and wastewater plants
Recovering revenue from Biomass Treatment of leachate
Reduction of energy and maintenance cost in blower
applications (up to 40%)
Systems for harvesting of Biogas and recovery of renewable
energy

3) Sludge Treatment 4) Water and Wastewater Treatment


Desludging of oxidation ponds and anaerobic lagoons Aeration and mixing
Dewatering of sludge Destruction of TOC, pesticides and weedicides, hormones
Microbial reduction of sludge in lagoons, OPS and and EDCS
treatment plants and digesters (up to 80%) Disinfection using both chlorine and U.V
Recovery of sludge for composting and compost stations Recovery and/or destruction of oil and grease
Tertiary treatment, recycling and re-use
AERATION

MIXING AND
BIOGAS & R.E
AGITATION

SLUDGE
UV
TRANSFER &
DISINFECTION
DEWATERING
ENVIRONS
PRODUCT
AREA

ENZYME &
PUMPING
MICROBES

BIOMASS
FILTERING
TECHNOLOGIES
TASKS ASSIGNED
To read up on sewage wastewater treatment activity. To list out what type of treatment is involved and type of
Task 1 equipment normally used for the treatment.

To identify type of aerator that are available in the market and the difference.
Task 2 To differentiate between Aqua-Jet surface aerator and DDM Mixer.

Working principle of peristaltic pump.


Advantages of peristaltic pump vs other type of pumps (centrifugal, diaphragm pump, progressive cavity pump).
Task 3 Do comparison between Bredel pump vs Verderflex pump.

Application of Aquafine UV system.


Task 4 The differences between Aquafine UV system and TrojanUV system.

Site Testing and Commissioning the new Turbo Blower.


Visit
TYPE OF TREATMENT INVOLVE IN
WASTEWATER TREATMENT AND THE
EQUIPMENTS

PRELIMINARY PRIMARY SECONDARY TERTIARY

Aeration
Bar Rack Primary Tank UV
Grit Clarifier Secondary Disinfection
Chamber Clarifier
ENVIRONS PRODUCT RANGE
Aqua Jet Surface Aerator VS Aqua
DDM
Aqua Jet Surface Aerator Aqua DDM (Direct Drive Mixer)

Aqua Jet Surface Aerator has upward Aqua DDM (Direct Drive Mixer) has
mixing pattern downward mixing pattern
ADVANTAGES
Aqua Jet Surface Aerator Aqua DDM (Direct Drive Mixer)
Proven oxygen and mixing performance. Simple physical construction makes
Easy and flexible installation. handling easy.
Short lead times. Lower initial cost and less expensive to
Easily added to existing plants. install.
Equipment easily retrievable. Better and more reliable service.
High efficiency motor One-piece stainless steel shaft.
Accessories available Suitable for most basin configurations.
Anti-erosion plate available for use in
earthen basin
PERISTALTIC PUMP
The actual pumping principle called
peristalsis, based on alternating compression
and relaxation of the hose or tube, drawing
content in and propelling product away from
the pump.
A rotor is used to squeeze a leak-proof tube
or hose, thereby forcing the pumped fluid
through the hose.
As the pumps rotor turns this sealing
pressure moves along the tube or hose
forcing product to move away from the pump
and into the discharge line.
One of the Verderflex Peristaltic Pump Combination of the suction and discharge
principles produce a powerful self-priming
positive displacement action.
PERISTALTIC PUMP ADVANTAGES
Abrasion resistant
No moving parts in the liquid stream
Accurate Dosing
Self-priming
Can pump liquids containing up to 80% inorganic solids (fines)
Aseptic pumping smooth liquid passage
Easy & completely cleanable without disassembly
Suitable for handling shear sensitive products
Can run dry
Low cost of ownership
High suction capability of up to 95% vacuum or a 9.5 mWc
No seals
Reversible rotation, empties line or blockages
Can pump abrasive, very viscous or high density liquid
TURBO BLOWER
High speed centrifugal blower
integral with a Permanent Magnet
Synchronized Motor (pmsm),
driven through an inverter.
The energy is transfer from a
rotating shaft to air or gas.
A pressure rise is achieved by
adding kinetic energy to a
continuous flow of air through the
The new installed Turbo Blower at WWTP
rotor or impeller.
TURBO BLOWER COMPONENTS
1) User Interface Unit
2) Driving or Inverter
System
3) Control Panel
4)BOV (Blower Off Valve)
5) Suction Filter System
6)Permanent Magnet (PM)
Motor
7) Performance Test System
ADVANTAGES OF TURBO BLOWER
Easy to install
Oil less system
High energy efficiency, up 30% savings
Low sound pressure levels
Variable flow rate control in the working area
Less vibration and less noise design
High speed permanent magnet motor
Minimal maintenance needs
Compact in size
APPLICATION AREA OF TURBO
BLOWER
Wastewater Treatment Plant
Pressed Transportation for raw materials
Cement Production Process
Thermal Power Generation
Water Treatment Process
Food and Chemical Treatment Processes
Chemical and Petrochemical Processes
Metal Processing and Mining
SITE VISIT: INSTALLATION, TESTING &
COMMISSIONING THE NEW TURBO
BLOWER

1) Installation Process 2) Painting Process 3) Testing and Commissioning


First Day (31st July 2017)
- Cleaning the area of the new Turbo Blower installed in the blower room
at the Wastewater Treatment Plant (WWTP).
Second Day (1st August 2017)
- Final installation process on the Permanent Magnet (PM) motor part by
the technical engineer of the blower supplier.
- Inspection of the Turbo Blower and its environment conditions before
the start-up.
- Learn about the components of the Turbo Blower. The blower consists of
User Interface Unit, Driving/Inverter System, Control Panel, Blow Off
Valve, Suction Filter System, Permanent Magnet (PM) Motor and
Performance Test System.
Third Day (2nd August 2017)
- Attend a briefing for the operation of the Turbo Blower and the control
parameters that being used in the operation of blower in the meeting
room at WWTP. - Learn about the start-up procedure for the Turbo
Blower.
Fourth Day (3rd August 2017)
- A briefing for the Turbo Blower operation held for the end user.
- Testing and commissioning the blower.
- Learn about the data collection for the blower from the control room.
OTHER TASKS
AutoCAD Drawing.
Building of material for construction of equipment.
Enquiry quotation.
Prepare quotation.
Selection of the equipment.
CONCLUSION
Gained valuable knowledges.
Give opportunity to felt the working life.
Exposed with not only engineering related of works
but also management of works.
Improve soft skill.
THANK YOU