Literature Survey
Coal 9734(54 %)
GAS 825 (4 %)
Hydro 1750(10 %)
Nuclear 557 (3 %)
Wind 3866 (21 %)
Solar 1265 (7 %)
Biomass 114 (1 %)
Total 18111
EXISTING POWER PLANTS (AS ON 31ST DEC 2015) IN RAJASTHAN
EXISTING POWER PLANTS (AS ON 31ST DEC 2015) IN RAJASTHAN
EXISTING CENTRAL SECTOR POWER PLANTS IN RAJASTHAN
15
UNDER CONSTRUCTION POWER PLANTS IN RAJASTHAN
1. Bus data
Test system is a model of 29 BUS.
There are 4 buses of 220 kV voltages level & twenty four buses of 132 kV voltage level and
1 generator bus at 11 kV. The bus data for the considered test system is placed in next slide.
Line parameters
SIL Thermal
Voltage Type of
S.No Value Rating
(KV) Conductor
R /km/ckt X /km/ckt B/2 mho/km/ckt (MW) (MVA)
220 kV line data in Mi-Power Software Zebra conductor Library in Mi-Power Software
3. Generator Data
Modeling Diagram representing Generator Data Modeling diagram representing Generator library
4. Transformer & Shunt Capacitor Bank Modeling
The test system consist of
one 132/11 kV generator transformer
nine 220/132 kV voltage level transformers.
Shunt capacitor banks are represented at 132 kV voltage
buses to balance the reactive power requirements.
Transformer Data of Test System
From To Bus Voltage Ratio Transformer
S.No. From Bus Name To Bus Name
Bus No. No (MVA) Capacity
A. 220/132 kV Transformers
1 8 MADRI2 30 MADRI1 220/132 100
2 9 BANSWRA2 20 BANSWRA1 220/132 100
3 9 BANSWRA2 20 BANSWRA1 220/132 100
4 10 ASPUR2 36 ASPUR1 220/132 100
5 16 DEBARI2 17 DEBARI1 220/132 160
6 16 DEBARI2 17 DEBARI1 220/132 160
7 16 DEBARI2 17 DEBARI1 220/132 100
8 16 DEBARI2 17 DEBARI1 220/132 50
9 16 DEBARI2 17 DEBARI1 220/132 50
B. 132/11 kV Generator Transformer
10 747 DG-132 KV 748 DG-G BUS 132/11 125
5. Load Data
Load is represented at 132 kV voltage level.
There are 23 number of load buses.
Load is represented as constant power load.
Thus providing a total load of 380 MW.
The modeled test system with installed bus
number and loads in MW and MVAr are
tabulated in table in the next slide.
Load Data of Test System
Load
S.No. Bus No. Bus Name
MW MVAr
1 28 MAHI_I 0.28 0.136
2 29 MAHI_II 0.504 0.244
3 20 BANSWRA1 21.284 10.308
4 21 DALOT1 12.322 5.968
5 27 BHINDAR1 18.483 8.952
6 33 BHATWAR1 19.043 9.223
7 17 DEBARI1 22.404 10.851
8 30 MADRI1 39.767 19.26
9 31 PRATNGR1 33.606 16.276
10 32 SUKHER1 29.685 14.377
11 18 SEESRMA1 20.164 9.766
12 34 ZMINES1 7.841 3.798
13 35 SALUMBR1 16.803 8.138
14 36 ASPUR1 7.561 3.662
15 37 DRIWAD1 10.082 4.883
16 38 SAGWARA1 23.524 11.393
17 39 DUNGRPR1 33.046 16.005
18 40 KHERWAR1 6.721 3.255
19 41 RISHDEO1 13.442 6.51
20 42 PARTAPR1 7.561 3.662
21 43 PALODA1 11.762 5.697
22 44 BAGIDRA1 16.243 7.867
23 45 KUSHLG1 7.561 3.662
Total Load 380 184
LOAD FLOW SOLUTION IN MI POWER SOFTWARE
MW losses of
21.29 17.53 3.76
Test system
MW losses of
462.18 455.77 6.10
Rajasthan system
5. ANNUAL ENERGY & COST SAVINGS
FIG 1 FIG 2
LOW VOLTAGE CONDITION REFERNCE VOLTAGE 1PU
LOW VOLTAGE CONDITION REFERNCE VOLTAGE 1.05 PU
HIGH VOLTAGE CONDITION FOR REFERNCE VOLTAGE 1.05 PU
HIGH VOLTAGE CONDITION FOR REFERNCE VOLTAGE 1.01 PU
1. Effect on Generator Reactive Power Output
Case No. Generator Reference Voltage(PU) Generator Reactive Power Output (MVAR)
1 1.00 7
2 1.01 11
3 1.02 19
4 1.03 20
5 1.04 24
6 1.05 28
2. Effect on Test System voltage profile
Simulation studies indicate that loading on lines & 220/132 kV transformers in Case II has
been reduced as compared to Case I.
The network voltage in Case II has been significantly improved as compared to Case I.
In Case II total system losses are reduced as compared to Case I. The system losses are
reduced from 21.294 MW to 14.803 MW.
The effects of DG placement on Rajasthan State Power System is also reflected with
power loss reduction of 6.41 MW.
Annual cost saving of approx. Rs 1955.27 Lakhs/Annum envisaged if, Distributed
Generation could be availed jointly by the utilities annually.
With DG placement, loading on lines has been significantly reduced. This created extra
capability of the system to meet the future load growth. Thus avoiding the layout of more
lines in the system. Improvements in voltage profile, line losses & reliability have been
achieved successfully. Therefore, quality of power supply is also greater than before.
CONCLUSION AND FUTURESCOPE OF WORK
Future Scope of work
Studies should be carried out for placement of DG in various
pockets of Rajasthan.
Studies should be carried out for various size DG in the power
system at specific locations.
PAPER SUBMISSION