You are on page 1of 6

System constraints in and

around Bangalore South


Circle

1
Sl. Stations/ line BESCOM Present status as
No Station Constraints Proposal per KPTCL

The following down


stream 66KV stations are
not optimally utilized.
1.Primal 220 KV Vikasa Tech-park station is
2.RMZ commissioned but could not able to
220 KV Vikasa 3. Exora
1 Tech-park (long take full load because of over
4.Cesna
5.Shobha. loading of 220 KV line from 220 KV
pending issue)
Further additional load to Malur to Somanahalli Station.
the existing consumers
and new power sanctions
are restricted.

In place of faulty 1X20MVA power


transformer 1X31.5MVA power
Existing 2x20 MVA transformer is replaced and there is
transformers are over
a proposal for providing 1X20MVA
loaded.
additional power transformer.
220 KV During peak hours load
2 on Sub-station is
Nagnathpura
restricted to 36 MW
and hence 6 to 8 MW
of load will be curtailed
during peak hours.
2
Sl. Station Stations/ line Constraints BESCOM Present status
No. Proposal as per KPTCL
In place of faulty 1X20MVA power
transformer 1X31.5MVA power
Existing 2x20 MVA transformer is replaced and there
transformers are over is a proposal for providing
loaded. 1X20MVA additional power
220 KV
2 Nagnathpura During peak hours load on transformer.
Sub-station is restricted to
36 MW and hence 6 to 8
MW of load will be curtailed
during peak hours.

Existing 2x20 MVA


66 KV transformers are over loaded 1x20 MVA 66/11 KV additional
3 Velankini Power Transformers required.
Load shedding is about 6 to
8 MW during peak hours.
Existing 2x20 MVA
66 KV transformers are over 1x20 MVA 66/11 KV additional
4 Malgudi loaded. Power Transformers required.

Load shedding is about 6


MW during peak hours. 3
Sl. Line BESCOM Present status
Station/line constraints
No. proposal as per KPTCL

Due to overloading of
220 KV line from
Somanahalli to
Subramanyapura
sub-station the
following downstream
66 KV stations are
affected The existing 66 KV B1 & B2 line
220 KV line from 1.Padmanabhanagara from 220 KV Somanahalli is
Somanahalli to 2. Arehalli proposed to convert 220/66 KV
5
Subramanyapura 3. Sarakki, MCMV line.
sub-station. 4. ISRO.
5. Banashankari]
6. Jayadeva

In these sub-stations
the load shedding is
about 6 to 8 MW
during peak hours.

4
Sl. Station/Line BESCOM Present status
Line
No. constraints proposal as per KPTCL

Existing single
circuit having 1. Construction of 66kV second circuit is
66 KV line coyote conductor. under progress.
from 220 KV 2. Further, it is proposed to establish
Nagnathpura For avoiding 400/220 KV station at Mylasandra and
6
station to 66 overloading of 66 KV evacuation 220 KV line from Mylasandra
KV Malgudi line in Malgudi sub-
to 220 KV Nagnathpura and 220 KV
station station 6 MW load
shedding is imposed HSR.
during peak hours. 3. It is proposed to install 1x20 MVA
additional transformer at Malgudi MUSS.

Existing 66 KV line The 66 KV over loaded line will be


66 KV line is over loaded and reduced after establishing of 220 KV
from 220 KV hence load shedding Jigini Station.
Somanahalli is imposed at 66 KV Expected completion time: 2 months
7 to 66 KV BG BG road Sub station
Road sub- during peak hours
station average 2 Hrs on
(Gollahalli) 11KV feeders.
5
Sl. Station/Line BESCOM Present status
Line
No. constraints proposal as per KPTCL

Strengthening of 66 KV line from EPIP to


Due to over loading
66 KV line Divyashree is under progress.
of 66 KV line there
from 220 KV
will be load shedding
8 EPIP 66 KV
during peak hours
Divyashree
for 1-2 Hrs on 11 KV
Station
feeders.

THANK YOU