Professional Documents
Culture Documents
1
Sl. Stations/ line BESCOM Present status as
No Station Constraints Proposal per KPTCL
Due to overloading of
220 KV line from
Somanahalli to
Subramanyapura
sub-station the
following downstream
66 KV stations are
affected The existing 66 KV B1 & B2 line
220 KV line from 1.Padmanabhanagara from 220 KV Somanahalli is
Somanahalli to 2. Arehalli proposed to convert 220/66 KV
5
Subramanyapura 3. Sarakki, MCMV line.
sub-station. 4. ISRO.
5. Banashankari]
6. Jayadeva
In these sub-stations
the load shedding is
about 6 to 8 MW
during peak hours.
4
Sl. Station/Line BESCOM Present status
Line
No. constraints proposal as per KPTCL
Existing single
circuit having 1. Construction of 66kV second circuit is
66 KV line coyote conductor. under progress.
from 220 KV 2. Further, it is proposed to establish
Nagnathpura For avoiding 400/220 KV station at Mylasandra and
6
station to 66 overloading of 66 KV evacuation 220 KV line from Mylasandra
KV Malgudi line in Malgudi sub-
to 220 KV Nagnathpura and 220 KV
station station 6 MW load
shedding is imposed HSR.
during peak hours. 3. It is proposed to install 1x20 MVA
additional transformer at Malgudi MUSS.
THANK YOU