SEKOLAH TINGGI TEKNOLOGI NASIONAL (STTNAS) YOGYAKARTA.

GEOTEKNIK TAMBANG

PENDAHULUAN

September 2013

SUPANDI, ST, MT
supandisttnas@gmail.com
GEOTEKNIK TAMBANG
Jurusan : Teknik Pertambangan Strata 1.
Kode : AS7446P
Mata Kuliah : Geoteknik Tambang
SKS : 2 SKS
Semester : VII
Waktu Perkuliahan : 2 x 50 menit
Dosen Pengampu : Supandi ST. MT
Sistem Perkuliahan :
Penilaian : a. Tugas, presentasi dan Diskusi, Quiz,
20%
b. Ujian Tengah Semester (UTS) 30%
c. Ujian akhir semester (UAS) 50%
Range Nilai : 0-20,9 = E ; 21-44 = D ; 45-60.9 = C ;
61 80 = B ; 81 100 = A
Contact Person : supandisttnas@gmail.com
Slide 2
STTNAS Yogyakarta
Sep-13
Textbook
1. John Read and Peter Stacey, 2009, Guidelines fr Open
Pit Slope Design, CRC Press.
2. William A Hustrulid, Michael K.McCarter and Dirk J.A Van
Zyl, 2000, Slope Stability in Surface Mining, Society for
Mining Mettalurgy and Exploration Inc.
3. Ducan C Wyllie & Christopher W Mah, 2007-4th Edition,
Rock Slope Engineering, Spon Press.
4. Charles A Kliche, 1999, Rock Slope Stability, Society for
Mining Mettalurgy and Exploration Inc.
5. E. Hoek & J.W Bray, 1994, Rock Slope Engineering,
Institute of Mining and Metalurgy.
6. Roy E. Hunt, 2007, Geotechnical Investigation
Methods, CRC Press.
7. Roy E Hunt, 2007, Geologic Hazards, CRC Press.
Slide 3
STTNAS Yogyakarta
Sep-13
Textbook
1. John Read and Peter Stacey, 2009, Guidelines fr Open
Pit Slope Design, CRC Press.
2. William A Hustrulid, Michael K.McCarter and Dirk J.A Van
Zyl, 2000, Slope Stability in Surface Mining, Society for
Mining Mettalurgy and Exploration Inc.
3. Ducan C Wyllie & Christopher W Mah, 2007-4th Edition,
Rock Slope Engineering, Spon Press.
4. Charles A Kliche, 1999, Rock Slope Stability, Society for
Mining Mettalurgy and Exploration Inc.
5. E. Hoek & J.W Bray, 1994, Rock Slope Engineering,
Institute of Mining and Metalurgy.
6. Roy E. Hunt, 2007, Geotechnical Investigation
Methods, CRC Press.
7. Roy E Hunt, 2007, Geologic Hazards, CRC Press.
Slide 4
STTNAS Yogyakarta
Sep-13
GEOTEKNIK TAMBANG
PENDAHULUAN

SUPANDI. ST. MT
STTNAS YOGYAKARTA

Slide 5
STTNAS Yogyakarta
Sep-13
Mengelola sumberdaya mineral secara
terintegrasi, mengoptimalkan tingkat
keuntungan dan umur tambang, menjaga
keselamatan operasi, serta merancang
strategi penanganan pasca tambang.

Slide 6
STTNAS Yogyakarta
Sep-13
The Challenge
Design must ensure that a level of safety is achieved which is
acceptable to the owner and Regulatory bodies.
Design must ensure security of the value embodied in the
orebody.
Design must be economically optimal so that maximum return is
obtained from the investment.

Reduced Waste
$$$$

Orebody

Increased Ore
Extraction $$$$

Slide 7
STTNAS Yogyakarta
Sep-13
Cost benefit curves
60

50
dollars (millions)

benefits
40

s lope ins tability c


30

net benefit
20

10

0
35 40 45 50 55
slope angle (deg)
Slide 8
STTNAS Yogyakarta
Sep-13
Geoteknik adalah suatu ilmu kajian rekayasa
kebumian yang berkonsentrasi pada aplikasi teknologi
teknik sipil untuk konstruksi yang melibatkan aplikasi
dari material alam dan terdapat pada atau dekat
permukaan. Kajian meliputi kondisi geologi, sifat fisik
dan mekanis batuan.

Geoteknik tambang adalah aplikasi rekayasa


geoteknik pada kegiatan penambangan baik tambang
terbuka dan tambang bawah tanah. Aplikasi geoteknik
melibatkan disiplin ilmu mekanika tanah, mekanika
batuan, geologi dan hidrologi.

Slide 9
STTNAS Yogyakarta
Sep-13
LATAR BELAKANG

PROSES PENGGALIAN MENYEBABKAN TERJADINYA


DISTRIBUSI TEGANGAN BARU
MUNCULNYA REKAHASN AKIBAT BERKURANGNYA
TEGANGAN DI SEKITAR PENGGALIAN
REKAHAN YANG TERBUKA MENYEBABKAN
BERKURANGNYA KUAT GESER UNTUK
MEMPERTAHANKAN DIRINYA
AIRTANAH YANG LEWAT MELALUI REKAHAN
MENURUNKAN TEGANGAN NORMAL EFEKTIF PADA
BIDANG YANG BERPOTENSI RUNTUH

Slide 10
STTNAS Yogyakarta
Sep-13
Why is Geotechnical Engineering Important?

Mining occurs in, what can be, a hazardous environment.


We are required to design and manage mines according to
sound design principles to minimise the risk associated
with these hazards.
Failure to do so heightens the risk of:
1. Serious injury or fatality
2. Damage to, or destruction of, plant
3. Loss of Ore
4. Diversion of equipment and resources from production
5. Loss of corporate reputation

Slide 11
STTNAS Yogyakarta
Sep-13
Lereng yang tidak aman

Dapat menimbulkan
kerugian hilangnya
nyawa manusia
Kerugian hilangnya
harta benda
Terganggunya
kegiatan produksi

Slide 12
STTNAS Yogyakarta
Sep-13
GEOTEKNIK TAMBANG
Didalam industri pertambangan, terutama tambang dengan produksi skala
besar, perencanaan tambang memegang peran utama dari keseluruhan
proses penambangan dan kajian geoteknik memegang peranan yang
sangat besar dalam segala lini kegiatan perencanaan penambangan.

Perencanaan Operasional Pengolahan


Eksplorasi Reklamasi
Tambang Tambang Bijih

Pemetaan Desain pit dan daerah


geologi penimbunan

Model cadangan Sequence penambangan


dan model mulai dari harian,
geteknik mingguan, bulanan,
tahunan sampai akhir umur
tambang

Slide 13
STTNAS Yogyakarta
Sep-13
Sistematika Perencanaan Tambang terdiri dari beberapa tahap dan
dilakukan proses umpan balik untuk memastikan keakuratan perencanaan.
Proses operasi terus berjalan selama umur tambang. Selama berlangsung
kegiatan penambangan, geoteknik memegang peranan penting.

Perencanaan Perencanaan Perencanaan


Produksi
Strategis Jangka Panjang Jangka Pendek

Menentukan Menterjemahkan arah Perencanaan Peledakan,


strategi strategi penambangan harian, mingguan pemuatan dan
penambangan menjadi target dan bulanan. pengangkutan
berdasarkan tahunan,sekaligus Pengawasan material.
kepentingan menjaga sumberdaya terhadap operasi Dispatching
sampai akhir umur
perusahaan dan harian dan system.
tambang
arahan perencanaan
Membuat perencanaan
manajemen tambang tahunan sampai harian.
akhir umur tambang, Penirisan
kwartalan, dan bulanan, tambang, disain
Membuat disain push- jalan, dan kontrol
back, melakukan terhadap
optimisasi dan menyusun penimbunan
biaya operasi batuan penutup.
Slide 14
STTNAS Yogyakarta
Sep-13
Peranan geoteknik sangat penting dalam kegiatan penambangan untuk
memastikan semua kondisi kestabilan lereng, sebelum, pada saat dan
pasca kegiatan penambangan.

Beberapa faktor yang perlu diperhatikan:


Perencanaan Jangka Panjang (Perkiraan target untuk setiap
Pushback, disain akhir tambang, dan kapasitas alat jangka panjang)
Situasi tambang dan produksi aktual
Kapasitas alat aktual
Jalan tambang & sistem penirisan
Jalur distribusi listrik
Kapasitas pengeboran dan peledakan
Data terbaru dari Geologi, Geotek, and Hidrologi

Slide 15
STTNAS Yogyakarta
Sep-13
RANCANGAN LERENG DIPENGARUHI

KEKUATAN BATUAN
STRUKTUR GEOLOGI
KONDISI HIDROLOGI
KONDISI HIDROGEOLOGI
ARAH LERENG TAMBANG
GEOMETRI LERENG
DISTRIBUSI BAHAN GALIAN
METODE PENAMBANGAN
PERATURAN YANG BERLAKU

Slide 16
STTNAS Yogyakarta
Sep-13
MODEL BIJIH DAN
BATUAN PENUTUP

PEMBORAN PENGAMBILAN PENGISIAN BAHAN PELEDAKAN


CONTO PELEDAK

PERENCANAAN
TAMBANG LABORATORIUM

PEMASANGAN TANDA
BIJIH DAN
PENUTUP
STACKER
WANAGON RUANG KENDALI
BAWAH

PENIMBUNAN PENGANGKUTAN PEMUATAN


BATUAN PENUTUP
DI OHS-3

MILL

REKLAMASI PENIMBUNAN PENGIRIMAN


BATUAN BIJIH KE ALAT
PENUTUP PENGHANCUR

Slide 17
STTNAS Yogyakarta
Sep-13
RUANGLINGKUP :

Batuan
Struktur Geologi
Morfologi
Kebencanaan
Geologi Lingkungan
Air

Slide 18
STTNAS Yogyakarta
Sep-13
Mine Geotechnical
Summary Introduction, purpose & issues
Chapter 1 Fundamentals of Slope Design
Chapter 2 Data Collection & Storage Methods
Chapter 3 Geological Model
Chapter 4 Structural Model
Chapter 5 Rock Mass Model
Chapter 6 Hydrogeological Model
Chapter 7 Data Uncertainty
Chapter 8 Slope Design Methods
Chapter 9 Acceptance Criteria
Chapter 10 Slope Performance and Management
Chapter 11 Risk Management
Chapter 12 Mine Closure

Slide 19
STTNAS Yogyakarta
Sep-13
DISCONTINUITIES Water Level WATER MATERIAL

Ground Soil
Bedding water
Plane
Rain
Fall
Joint Properties

Surface
Water Rock

Rock
Type
Fault Drainage

SLOPE
FAILURE
Static load
Excavation
External Method
force Height, dip,
direction
Seismic
Blasting
Geometry
Dynamic FORCE
Load
MINING
Internal
Insitu force
METHOD
Stress
Shovel &
truck

FACTORS AFFECTING SLOPE FAILURE


Slide 20
STTNAS Yogyakarta
Sep-13
FAKTOR KEAMANAN

DALAM MERANCANG LERENG DIPERLUKAN


ADANYA FAKTOR KEAMANAN
BERFUNGSI UNTUK MENGANTISIPASI
KETIDAKPASTIAN DAN MENJAGA TINGKAT
KEPERCAYAAN YANG RENDAH TERHADAP DATA
YANG DIGUNAKAN
PADA UMUMNYA SEMAKIN RENDAH KUALITAS
PENYELIDIKAN LAPANGAN DIPERLUKAN FK YANG
LEBIH BESAR
PEMILIHAN FK BERGANTUNG KEPADA
PENGALAMAN, TINGKAT KEPERCAYAAN
TERHADAP DATA YANG DIMILIKI,FUNGSI, WAKTU

Slide 21
STTNAS Yogyakarta
Sep-13
KEY

TUJUAN MEMPEROLEH
RANCANGAN LERENG
YANG OPTIMUM

Slide 22
STTNAS Yogyakarta
Sep-13
DEFINISI
Bench - Benches: Level-level kegiatan penambangan dengan ketinggian
tertentu Semua kegiatan peledakan dan pertambangan akan mengikuti level-
level yang telah ditentukan. Kegiatan-kegiatan pertambangan berdasarkan
pada level yang telah dipilih dimaksudkan untuk mempertahankan kestabilan
lereng tambang permukaan.
Bench Face Angle (BFA): Sudut kemiringan lereng yang diukur dari daerah
horisontal di antara catch bench yang berurutan; lebih dikenal dengan istilah
sudut kemiringan batter. c. Catch Bench: Cut bench pada buatan atau
kemiringan tanah. Tujuan kemiringan adalah untuk menangkap material
lepas yang jatuh sehingga material tersebut tidak terus jatuh ke kaki lerengan
tanpa terhalang. Lebar catch bench yang dianjurkan didasarkan pada
simulasi-simulasi kehilangan lebar catch bench sebagian akibat backbreak di
sepanjang joint set yang merembes. d. Crest: Bagian pinggir atas suatu
lereng; bagian dimana lereng bagian atas yang bertemu dengan bench.
Interramp Slope Angle (ISA): Sudut kemiringan, yang diukur dari daerah
horisontal, di antara ramp yang berurutan atau jalan pengangkutan (haul
road). Interramp slope terdiri dari serangkaian permukaan jenjang dan catch
bench dan diukur dari crest-ke-crest atau toe-ke-toe.
Toe: Bagian paling bawah dari lerengan; tempat dimana lereng bawah
bertemu dengan bench
Crest : Bagian paling atas dari sebuah lereng; ujung dari catch bench.
Slide 23
STTNAS Yogyakarta
Sep-13
Geotechnical Rock (GTRCK) Type: Klasifikasi massa batuan geomekanik
yang dimaksudkan untuk mencerminkan perilaku yang diharapkan dari suatu
massa batuan yang terdapat pada lereng yang dipotong (cut slope).
Penentuan klasifikasi GTRCK didasarkan terutama sekali pada persentase
RQD, kekuatan batuan yang masih utuh, dan persentase partikel-partikel
berukuran clay.
Overall Slope Angle: Sudut kemiringan, yang diukur dari daerah horisontal,
di antara slope crest paling atas dan kaki lereng paling bawah. Kemiringan
secara keseluruhan terdiri dari serangkaian catch benches, bench faces, dan
ramp dan dapat memiliki segmen interramp slope dalam jumlah banyak.
Steepening Pit Slope:Penambanhan besar sudut interamp & overall slope dari
kondisi saat ini (design sebelumnya yang direkomendasikan).
Bench Face Angle (BFA): Sudut yang dibentuk oleh toe crest.
Bench Height: Tinggi vertikal dari atas sampai bottom bench (laintai).
Catch Bench: Suatu bidang mendatar antara crest toe.

Slide 24
STTNAS Yogyakarta
Sep-13
Final Wall Blasting: One of the final pit wall excavation methods that utilizes a
special or modified blasting techniques with primarily targeting to minimize the
damage to the pit walls. Common final wall blasting used for final pit wall excavation
comprises of modified production blast, buffer row blast, trim blast, pre-splitting, etc.
Final Blast Rows: one or two rows closest to the designed wall.
Production Blast Rows: Blast rows that are laid out in front of final blast rows and
usually facing out of the wall and has a free face.
Stand-off Distance: A certain distance from blast rows closest to the designed toe of
the wall. This distance will be varying depending on the rock type forming the slope. In
this steepening trial, the distance will be determined based on the quality result of final
wall blasting.
Sub-Drill: Drilling depth below the designed blasting bottom.
Broken Muck: Rock or material fragmented by blasting with explosives as a
preparatory step for loading and removal.
Back-Break: Rock broken beyond the limits of the last row of holes marking
the outer
boundary in a blast.
Cracking: Small-scale displacement in the rock caused by tension stress,
mechanical forces, vibration of blast, etc.

Slide 25
STTNAS Yogyakarta
Sep-13
Slope Failure: Gradual or rapid downslope movement of rock forming the slope
under gravitational stress; often as a result of man-caused factors; e.g.,
removal of material from the base of a slope.
Failure Material/Debris: Any surficial accumulation of loose material detached
from rock masses by alteration and mechanical means.
Over Digging: Machine (Shovel/loader) that excavates over the slope design
limit.
Under Cutting Slope: The process of cutting under the slope face/toe with a
shovel or other machines, so the slope can be shot down readily or causing to
fall.
Loose Rocks/Ground: Broken, fragmented, or loosely cemented bedrock
material that tends to slough downslope.
Scaling Face: The plucking down or Removal of loose overhanging rocks from
the bench face.
Bench Drainage: A drainage system constructed along the benches to divert the
surface run-off out of mining area.
Back Slope: Gentle slope surfaces that tip to the wall. In bench drainage, the
back slope is commonly tipping of 1-2%.
Berm/bund: For this SOP, berm/bund is an artificial ridge of earth that is built at
the outer edge of the bench.

Slide 26
STTNAS Yogyakarta
Sep-13
Slope Failure: Gradual or rapid downslope movement of rock forming the slope
under
gravitational stress; often as a result of man-caused factors; e.g., removal of
material
from the base of a slope.
Slope Support: Materials placed in slope face to reinforce or to counteract or to
protect
the slope from potential rock fall and loose ground. The common reinforcement
materials utilized are rock bolting, rock fences, wire mash.
Trenching Slope: For this SOP, trenching is a cut immediately below crest line
(2m
deep) constructed along the bench and narrow is made for utility line
Major Structure Model: Defined as resulting from geological interpretation of
major
structures based on geological bench mapping of major structures (those
individual
structures of greater than 15m continuity). The model carries no attributes of
structural thickness or mechanical character and the position of any structure
is indicative.

Slide 27
STTNAS Yogyakarta
Sep-13
Slide 28
STTNAS Yogyakarta
Sep-13
Slide 29
STTNAS Yogyakarta
Sep-13
Slide 30
STTNAS Yogyakarta
Sep-13
Slide 31
STTNAS Yogyakarta
Sep-13