roller running forward and backward until edges have been compacted. The roller should overlap each preceding wheel track proceeding wheel track by one half width. Application of Screening The screenings are spread gradually to fill the voids. Dry rolling should be done so that the vibrations will cause the screenings to settle into the voids. Application of Binding Material Binding material should be applied at a uniform and slow rate in two or more thin layers. The surface is rolled with a 6-10 tonnes roller during which water shall be applied to the wheels to wash down the binding material stuck to them. After final compaction of the course, the road shall be allowed to cure overnight. Traffic will be allowed after the macadam sets.