Professional Documents
Culture Documents
PE/TRD/CN/0304 12.02/EN
July, 2000
Introduction
Section 1
Introduction
1-1
Objectives
This course covers the principles and describes the procedures related
to the BSS Databuild operations. It is based on the exhaustive use of the
OMC-R. The course includes both a theoretical part and a practical part.
"Confidential information -- may not be copied or disclosed without permission".
SYS
TL1
GSM System and Products
Overview
GSM System Overview
Telecommunications Overview
5 days
3 days
2 days
OM4
OM5
OM6
OM7
OMC-R Administration
BSS Databuild
4 days
5 days
S8000 BTS Local Maintenance 2 days
BSS Performance
"Confidential information -- may not be copied or disclosed without permission".
938
950
951
961
System
GSM GPP-IWF
GSM DMS Maintenance Part 1
GSM DMS Maintenance Part 2
GSM09 Release Delta
5 days
10 days
10 days
2 days
TL4 ATM Overview 1 day
OM9
OM10
Measurements Tools
BSS Operation and Fault
Handling
Reconfiguration Tools
2 days
4 days
3 days
962
963
970
972
Courses
GSM10 Release Delta
GSM11 Release Delta
GSM-MSC/VLR Translations
GSM HLR Service Datafill
1 day
2 days
10 days
5 days
ARI
BSS System Courses
Advanced Radio Interface
Description 3 days
OM31 BSC and TCU Local Maintenance3 days
OMDV10-12 BSS Release for V10 Experts
OMDV12 BSS Release for V11 Experts
3 days
2 days
974 GSM CCS7 Transl. and Operations 5 days BS21 BSC 12000 and TCU OM36 BSC, TCU and BTS S8000
Advanced Description 2 days Local Maintenance 5 days
RSV1
Radio and Network Engineering
Courses
Radio Site Verification 1 day
NE2
NMO
PR1
BSS
BSS Optimization Parameters
Network Monitoring and
Optimization
S8000 BTS Family
3 days
PR3
System
Advanced Description
S2000 L&H and e-cell BTS
Advanced Description
BSS Products Overview
2 days
1 day
2 days
PIC1
PIC7
PIC10
BSC & TCU Installation and
Commissioning.
BTS S8000 Outdoor I&C
BTS S8000 Indoor I&C
5 days
5 days
4 days
RSQ1
RSQ2
SSE1
SSE2
Radio Survey and RF Qualification
Radio Measurements
Site Survey and Site Engineering
Site Survey Visit and Engineering
2 days
3 days
1 day
PR4
SR11
Courses
BSC and TCU e3 Advanced
Description
BSS Release V11 Overview
2 days
1 day
PIC17
PIM8
BTS S8000 I&C
BTS S2000 (H&L) I&C and O&M
5 days
2 days
TCU 16 41 Maintenance
Procedures
PE/CDC/DD/0004 PE/CDC/DD/0026
CD-ROM of TCU
BSC 22 CD-ROM of 42 Maintenance
GSM BSS NTPs BSS Parameters User Guide
General Procedures
S4000 Information S2000/
S2000E BTS
Outdoor 23 46
BTS BSS Product Whats new Maintenance
Reference Documen- BSS in the GPRS Maintenance Procedures
tation Overview BSS V12 Overview Manuals S4000 BTS
S2000H/L Manuals Overview NTP suite 47 Maintenance
BTS 35
Procedures
S4000 00 01 88 117 S8000 BTS
Smart 43 48 Maintenance
BTS Procedures
S2000/ S2000 H/L BTS
S2000E 53 49 Maintenance
BTS Procedures
S8000/ Fault Number Description CT Tools (optional) S8002 BTS
84 Maintenance
S8002 63 Procedures
S2000/ S8000/ S2000H/L Advanced CT5100 CT7100 CT7100 Call Trace/
CT1000 CT1000/
BTS
CT3100 BSS CCM User
BSC/TCU S2000E e-cell Maintenance PCUSN User CT3100 Operating Instal. Call Path Trace
S4000 S8002
S8006 BTS
PCUSN BTS BTS Procedures Manual Instal. Procedures User Manual Manual Analyzer 85 Maintenance
91 BTS Manual Manual User Manual Procedures
e-cell 101 102 103 104 105 106 29 38 54 118 20 21 60 e-cell BTS
92 90 Maintenance
BTS Manual
NORTEL
Introduction
OMC-R Overview
"Confidential information -- may not be copied or disclosed without permission".
User Facilities
Re-configuration Procedures
Software Management