R.C. Works:Dos
isolated by the insertion of 1”
polystyrene foam and plastic
sheet. This will allow the
plinth to move independent
of the movement joint.
1
Kerja Konkrit: Amalan Baik
R.C. Works:Dos
Konkrit ambang
disini telah dibina
denagn baik. Ia telah
digetarkan dengan
sempurna semasa
konkrit dituang
masuk ke dalam
acuan kayu.
The concrete lintel here has
been well built. The concrete
beam here have been
properly vibrated during the
casting process to produce a
solid and non-honeycombed
r.c. finish.
2
Kerja Konkrit: Amalan Tidak Memuaskan
R.C. Works:Donts
Kualiti pengukuh konkrit
disini tidak begitu
memuaskan kerana besi
tetulang yang tidak diliputi
konkrit maka kekuatan
keseluruhan pengukuh ini
mingkin direndahkan.
Tambahan pula, ketul-
ketul batu juga terdedah
pada tiang ini.
The concrete stiffener here have not
been properly constructed where it is
noted here the exposed
reinforcement and aggregates of
rocks which have not been covered
sufficiently.
3
Kerja Bata : Amalan Baik
Brickworks : Dos
Starter rods are inserted into the
end of brickwork where the
space is provided for r.c.
stiffeners. This will provide a
better bonding between the brick
wall & stiffener.
4
Kerja Bata : Amalan Baik
Brickworks : Dos
5
Kerja Bata: Amalan Tidak Memuaskan
Brickworks : Donts
properly completed in the beam
area of this the brick wall. This
may lower the wall’s overall fire
resistance due to this weak
point vulnerable to fire.
6
Kerja Bata: Amalan Tidak Memuaskan
Brickworks : Donts
7
Lepaan Simen: Amalan Baik
Plastering Works : Dos
and not lumpy.
8
Lepaan Simen: Amalan Baik
Plastering Works : Dos
that the plaster surface do not
exceed & overlaps the frame.
9
Lepaan Simen: Amalan Tidak Memuaskan
no controlled line where the
plastered surface do not exceed
& overlaps the frame area.
10
Kerja Dinding Gypsum : Amalan Baik
Drywall Partition : Dos
11
Kerja Dinding Gypsum : Amalan Baik
Drywall Partition : Dos
Start / end of
Trek bawah dipaku dengan
top deflection & ‘ram sek gun’ pada jarak
bottom track yang ditunjukkan dalam
6” gambar. Lokasi paku-paku
juga berselang-seli dalam
corak zig-zag.
The bottom & top deflection tracks are
nail into position using a ram sek gun.
The nails are staggered in a zig-zag
pattern from nail to nail and at a
distance as shown in the picture here.
24”
12
Kerja Dinding Gypsum : Amalan Baik
Drywall Partition : Dos
12”
13
Kerja Dinding Gypsum : Amalan Tidak
Memuaskan
Drywall Partition : Donts
Normal nailing method are not allowed
for the fixing of lower & top deflection
tracks of fire rated dry wall partitions.
14
Kerja Siling: Amalan Baik
Suspended Ceiling: Dos
Dawai pengantung
siling mesti dilipat
dengan bentuk V
supaya siling tee tidak
akan melengkung ke
bawah apabila papan
siling dimasukkan
kelak.
The ceiling hangers must be
bent with a tight V shape at the
point of hanging of the tees.
This will prevent the ceiling
tees from sagging later when
the ceiling boards are installed.
15
Kerja Siling: Amalan Baik
Suspended Ceiling: Dos
16
Kerja Siling: Amalan Tidak Memuaskan
Suspended Ceiling: Donts
Dawai pengantung
siling disini tidak
dilipat dengan bentuk
V dimana siling tee
pada tempat ini
munkin melengkung
ke bawah apabila
papan siling
dimasukkan kelak.
The ceiling hanger here have
not been bent with a tight V
shape at the point of hanging
of the tees. This may result in
the ceiling tees sagging from
the weight of the ceiling boards
installed later.
17
Kerja Siling: Amalan Tidak Memuaskan
Suspended Ceiling: Donts
‘mock-up’.
The ceiling tees and wall angle
are connected and secured
into position using exposed
screw fixings. This were not in
compliance to the architect’s
comments during the mock up
ceiling inspection.
18