RESERVES
Final Calaorco Pit
OXIDES Mineral Reserves at January 1, 2017
Classification Ore Type Tonnes Au g/t Au Ounces
Proven sediments - - -
intrusive 344,512 0.374 4,144
Probable sediments 48,233,248 0.424 657,668
intrusive 5,554,460 0.296 52,890
Total 54,132,219 0.411 714,701

3148

3388

Final Topo Oxides Project

New Leader in Precious Metals


PHASES PROFILE PIT CALAORCO

CURRENT TOPO
A
Current Topo
PHASE 7 Topo 2016
PHASE 6
PHASE 5
Topo 2018
PHASE 3 Topo 2017

PHASE 8
Nv. 3320 PHASE 4

Topo 2019
Nv. 3270

A
FACING Nv. 3225
NORTH
Nv. 3504
Nv. 3185
Topo 2020
Nv. 3165

Oxides Sulfides

New Leader in Precious Metals


FASES DE MINADO

FASE 3 Nv. 3480


Nv. 3440

Fase 3
Ore t (dry) 3,611,118
Nv. 3320
Waste t (dry) 1,024,517
Au (g/t) 0.662
Au (oz) 76,881
Nv. 3448
D/M 0.28
TOTAL t (dry) 4,635,635
Nv. 3496 Nv. 3416

Nv. 3504 Nv. 3424

New Leader in Precious Metals


FASES DE MINADO

FASE 4 Nv. 3480


Nv. 3440

Fase 4
Ore t (dry) 12,191,238
Nv. 3320
Waste t (dry) 11,609,078 Nv. 3432
Au (g/t) 0.320
Au (oz) 125,510
Nv. 3448
D/M 0.95
TOTAL t (dry) 23,800,316 Nv. 3304

Nv. 3496

Nv. 3504

New Leader in Precious Metals


FASES DE MINADO

Nv. 3416

FASE 5 Nv. 3480

Nv. 3288

Fase 5
Ore t (dry) 14,281,796
Waste t (dry) 16,362,316 Nv. 3432
Au (g/t) 0.344
Au (oz) 157,845
D/M 1.15
TOTAL t (dry) 30,644,112
Nv. 3496

Nv. 3504

New Leader in Precious Metals


FASES DE MINADO

Nv. 3416

FASE 6 Nv. 3480

Fase 6 Nv. 3224


Ore t (dry) 14,552,017
Waste t (dry) 28,605,956
Au (g/t) 0.317
Au (oz) 148,314
D/M 1.97
TOTAL t (dry) 43,157,972
Nv. 3496

Nv. 3504

New Leader in Precious Metals


FASES DE MINADO

Nv. 3424 Nv. 3416

FASE 7
Fase 7
Ore t (dry) 13,692,532 Nv. 3184

Waste t (dry) 45,418,259


Au (g/t) 0.384
Au (oz) 169,069
D/M 3.32
TOTAL t (dry) 59,110,791

Nv. 3504

New Leader in Precious Metals


FASES DE MINADO

Nv. 3416
Nv. 3424

FASE 8 Nv. 3256

Fase 8
Ore t (dry) 6,621,318 Nv. 3160 Nv. 3400
Waste t (dry) 24,030,542
Au (g/t) 0.284
Au (oz) 60,497
D/M 3.63
TOTAL t (dry) 30,651,859

Nv. 3504

New Leader in Precious Metals


FASES DE MINADO

Nv. 3416

LMITE FASE 9 Nv. 3256

1400 $/Onz Nv. 3160 Nv. 3400

Lmite
Fase 9

New Leader in Precious Metals


La Arena Mine Production Update

New Leader in Precious Metals 13


LOM SCHEDULE
PRODUCTION PROFILE
2017 - 2020
Current Mine Fleet

03 Shovel RH 90 10
m3
01 FEL WA900
21 Trucks 91 Cap (777
and 785HD)
03 Drills DM245 6 1/8
inches.
05 Ancilliary (Grader,
Wheel Dozer, Tack
Dozer)

New Leader in Precious Metals


LA ARENA PLANEAMIENTO MINA

Planeamiento de Minado a Corto Plazo

New Leader in Precious Metals


Planeamiento de Minado Anual

New Leader in Precious Metals


Plan de minado Trimestral

New Leader in Precious Metals


Planeamiento de Minado MENSUAL-TAJO

New Leader in Precious Metals


Planeamiento de Minado MENSUAL-DESCARGA

New Leader in Precious Metals


Planeamiento de Minado SEMANAL-TAJO

New Leader in Precious Metals


Planeamiento de Minado SEMANAL-DESCARGA

New Leader in Precious Metals


Planeamiento de Minado DIARIO-OPERATIVO
SE REALIZA REUNIONES DE
PLAN DIARIO DE OPERACIONES
DONDE SE DETALLA LAS
PRIORIDADES DE PERFORACION
EQUIPOS DE MINADO Y
TRABAJOS RUTINARIOS

BANCO BANCO NIVEL-3504


3424 3424

BANCO
3424

BANCO
3536
ESTAS REUNIONES SIRVE BANCO NIVEL-3512
3432
PARA ENCAMINAR
BANCO LOS
3544 BANCO
PLANES DE MINADO 3552
MENSUAL Y REALIZAR UN
CONTROL EN CAMPO DEL
PLAN DE CORTO PLAZO

New Leader in Precious Metals


CONSIDERACIONES PARA EL PLAN DE MINADO

EQUIPO:
Productividad de Equipos:
Palas/Cargador/Camiones
Perforadoras
Factores de Carga
MINA:
Fragmentacin del Material
Humedad del Material
Pendiente de Rampas
Condiciones Climticas
GEOLOGICOS:
Tipo De Roca
Dureza
Estabilidad de Taludes

New Leader in Precious Metals


DISEO DE MALLAS DE PERFORACION

TIPOS DE MALLAS PERFORACION

7m x 6 Waste/Ore-Intrusive

6m x 5.22m Waste-Sandstone 7m x 6m Waste-Sandstone 5.5m x 4.78m Ore-Sandstone

New Leader in Precious Metals


Topografia - Mina

New Leader in Precious Metals


Consultas - Gracias

New Leader in Precious Metals

You might also like