CURRENT TOPO
A
Current Topo
PHASE 7 Topo 2016
PHASE 6
PHASE 5
Topo 2018
PHASE 3 Topo 2017
PHASE 8
Nv. 3320 PHASE 4
Topo 2019
Nv. 3270
A
FACING Nv. 3225
NORTH
Nv. 3504
Nv. 3185
Topo 2020
Nv. 3165
Oxides Sulfides
Fase 3
Ore t (dry) 3,611,118
Nv. 3320
Waste t (dry) 1,024,517
Au (g/t) 0.662
Au (oz) 76,881
Nv. 3448
D/M 0.28
TOTAL t (dry) 4,635,635
Nv. 3496 Nv. 3416
Fase 4
Ore t (dry) 12,191,238
Nv. 3320
Waste t (dry) 11,609,078 Nv. 3432
Au (g/t) 0.320
Au (oz) 125,510
Nv. 3448
D/M 0.95
TOTAL t (dry) 23,800,316 Nv. 3304
Nv. 3496
Nv. 3504
Nv. 3416
Nv. 3288
Fase 5
Ore t (dry) 14,281,796
Waste t (dry) 16,362,316 Nv. 3432
Au (g/t) 0.344
Au (oz) 157,845
D/M 1.15
TOTAL t (dry) 30,644,112
Nv. 3496
Nv. 3504
Nv. 3416
Nv. 3504
FASE 7
Fase 7
Ore t (dry) 13,692,532 Nv. 3184
Nv. 3504
Nv. 3416
Nv. 3424
Fase 8
Ore t (dry) 6,621,318 Nv. 3160 Nv. 3400
Waste t (dry) 24,030,542
Au (g/t) 0.284
Au (oz) 60,497
D/M 3.63
TOTAL t (dry) 30,651,859
Nv. 3504
Nv. 3416
Lmite
Fase 9
03 Shovel RH 90 10
m3
01 FEL WA900
21 Trucks 91 Cap (777
and 785HD)
03 Drills DM245 6 1/8
inches.
05 Ancilliary (Grader,
Wheel Dozer, Tack
Dozer)
BANCO
3424
BANCO
3536
ESTAS REUNIONES SIRVE BANCO NIVEL-3512
3432
PARA ENCAMINAR
BANCO LOS
3544 BANCO
PLANES DE MINADO 3552
MENSUAL Y REALIZAR UN
CONTROL EN CAMPO DEL
PLAN DE CORTO PLAZO
EQUIPO:
Productividad de Equipos:
Palas/Cargador/Camiones
Perforadoras
Factores de Carga
MINA:
Fragmentacin del Material
Humedad del Material
Pendiente de Rampas
Condiciones Climticas
GEOLOGICOS:
Tipo De Roca
Dureza
Estabilidad de Taludes
7m x 6 Waste/Ore-Intrusive