Professional Documents
Culture Documents
By
Agriculture in Pakistan
Agriculture in China
SWOT ANALYSIS
Strength:
spirit of the relationship between the two
countries
common interest of both countries
Already have bilateral working experience
Political Harmony among political parties in
Pakistan
SWOT ANALYSIS contd..
Weakness:
Skill Level of Pakistani workforce working
on the project
Pakistan present economic situation
SWOT ANALYSIS contd..
Opportunity:
Already Existing Infrastructure like
Karakorum highway, M1, M2, motorway
which is part of the mega project
Economic collaboration
Strategic partner
SWOT ANALYSIS contd..
Threats:
Security situation in Pakistan
Withdrawal of financer(china state
institution/companies)
Political unrest in Pakistan
Neighbor country interference
Some of the Projects Covered under
CPEC (Details)
1: INFRASTRUCTURE
2: ENERGY
3: SECURITY
1: INFRASTRUCTURE
PROJECTS
1. Gwadar Port
2. Karachi-Lahore Motorway
3. Peshawar-Karachi Motorway
4. Hazara Motorway
5. Lahore metro line Train
DETAILS OF GWADAR PORT PROJECT
The long channel of Gwadar Port has been dredged to
14 meter depth
387km
296km
136km
The motorway will facilitate commutes between
Karachi and other cities including Sukkur, Badin,
Ghotki, Rohri, Dadu, Pano Aqil, Abro, Rahim yar
Khan, Sadiqabad, Zahir Pir, Jalalpur Peerwala Abdul
Hakim, Pir Mahal, Mamo Kajan and Nankana Sahib
LENGTH 110 km
North End Shinkyari
South End Hassan Abdal
Lanes 4
Route Start Burhan Interchange
Point
. LAHORE METRO LINE TRAIN
An under-construction metro
train line project
1. Ali Town 2. Niaz Baig 3. Canal View 4.Hanjarwal 5.Wahdat 6. Awan 7. Sabzazar
8.Shahnoor 9. Salahudin 10. Bund 11. Samanabad 12. Gulshan-e-Ravi
13.Chauborji 14. Lake Road CENTRAL 15.Lakshami 16.Sultanpura 17.University
18.Baghbanpura 19.Shalimar Gardens 20.Mint 21.Mahmood Islam Park
22.Salamalpura 23.Dera Gujran
2: ENERGY SECTOR PROJECTS
1. Sukhi Kinari Hydropower Project
2. Karot Hydropower Project
3. Zonergy Solar Power Project
4. Dawood Wind-power project
5. Sachal Wind-power project
6. Jhimpir Wind-power project
7. Port Qasim 2x660MW Coal-fired Power Plant
8. Thar Block II 2x330MW Coal Fired Power project
PAKISTANS ENERGY DEMAND
Electricity total installed capacity: 22,797 MW
Electricity Sources
fossil fuel 14,635 MW 64.2% of total(oil-35.2% + gas-
29%)
hydro 6,611 MW 29% of total
nuclear 1,322 MW 5.8% of total
average demand-17,000 MW
shortfall-between 4,000 MW and 5,000 MW
1. SUKHI KINARI HYDROPOWER PROJECT
The project is located in the Kaghan Valley in
Mansehra District and is easily accessible.
A run-of-the-river project
835 MW Generating capacity
Moreover due to its high design head of 900 meters
and relatively short Intake Structure crest, it is
considered one of the most cost effective hydropower
schemes in the region.
Power Generation: 840 MW
Designed to produce 2,958 GWh annually, this mega
project alone is expected to increase Pakistans existing
available power generation capacity by more than 5%
2. 720-MW KAROT HYDROELECTRIC PROJECT
Located on Jhelum River
Powerhouse to be located in the province of Punjab
and the Karot Dam a gravity dam, will be built on
Jhelum River
Power Generation Capacity: 720MW
3. DAWOOD WIND-POWER PROJECT
Location : Gharo (60 km east of Karachi)
Power Generation capacity: 50 MW
To be build by A Chinese company HydroChina
International Engineering Company
Cost: $120 million
4. QUAID-E-AZAM SOLAR PARK
Located in Bahawalpur, Punjab
Status: Under-construction (First 100 MW completed)
It is a 1,000MW photovoltaic power
station in Balochistan
The first 100 MW went operational in May 2015
100 MW capacity will be added at regular intervals
40,000 solar panels to be installed
Completion Date: By the end of 2016 (will generate
1000 MW since)
Cost: $131 million
3: SECURITY FOR CHINESE ENGINEERS
About 12,000 security personnel to protect Chinese
workers on the corridor